This document is a Task Work Order (TWO) No. 4 issued by the State of Florida Department of Transportation (FDOT) to Barge Design Solutions, Inc., located in Margate, FL. The contract number is CAQ78 with a Financial ID No. 447945-1-32-01, and it is part of a Continuing Services for Project Design agreement.
The task work order covers sidewalk improvements along SR-715, specifically from Hatcher Road to Paul Radin Park and from Airport Road to SW 14th Street. The project involves design services for concrete sidewalk improvements, including curb ramps, detectable warning surfaces, and crosswalks. The total compensation for the project is $258,430.67, broken down into $227,359.09 for Basic Services and $31,071.58 for Sue & Survey. The services will be completed using a lump sum method based on percentage of completion and loaded billing rates. The project aims to improve pedestrian safety by installing a new 6-foot concrete sidewalk along the west side of SR-715, with a total project length of approximately 5,000 linear feet across two segments. No right-of-way or environmental impacts are anticipated, and the project is designed to meet Americans with Disabilities Act (ADA) standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAQ78-00040000.pdf | ||
| CN-550000-CAQ78-W0010000.pdf | ||
| CN-550000-CAQ78.pdf | ||
| CN-550000-DON55-W0080000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAQ78-W0020000.pdf | ||
| CN-550000-CAQ78-00020000.pdf | ||
| CN-550000-CAQ78-00030000.pdf | ||
| CN-550000-CAQ78-W0030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
11/27/2028
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Consultant, Procurement, Financial Services, FDOT Project Manager, File
Vice President
$258,430.67
$0.00
(name) (title)
Kevin Kennoy
$258,430.67
Total authorizations to date (including this one):
Departmental Approval:
$227,359.09 Limit
Sue & Survey $31,071.58 Limit
Sidewalk improvements along SR-715 from Hatcher Rd. to Paul Radin Park & Airport Rd to SW 14th St.
Barge Design Solutions, Inc.
101 N. State Road 7, Suite 4, Margate, FL 33063
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$258,430.67
(LS2) Lump sum paid based on % of completion
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
$450,448.20
(name) (title) Signature
Luciana Amato Contract Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAQ78 447945-1-32-01
Docusign Envelope ID: 617F8563-D929-4A27-8CCD-1379F9FE9C12
08/08/2025 | 8:11 AM EDT
Contract No.: CAQ78
Financial ID No. 440455-8-32-01
CONTINUING SERVICES FOR PROJECT DESIGN
Scope of Services Task Work Order (TWO) No. 4 Financial ID No. 447945-1-32-01
Sidewalk Improvements along SR-715 from Hatcher Rd. to Paul Radin Park
And Airport Rd. to SW 14th St.
The CONSUTANT shall provide design services for concrete sidewalk improvements including curb ramps, detectable warning surfaces, and crosswalks along SR-715, in accordance with FDOT
Design Manual (FDM). The nature of this project is safety improvements.
The proposed project will improve the safety of pedestrians along the west side of SR-715 from
400’ north of Hatcher Road to Paul Rardin Park for a length of 3,400’ (Segment 1) and from
Airport Road to SW 14th Street for a length of 1,600’ (Segment 2). The project includes a new 6-foot concrete sidewalk along the west side of SR-715. In addition, curb ramps, detectable warning surfaces and crosswalks will be provided where needed to meet the Americans with Disabilities
Act (ADA) standards.
No Right-of-Way or Environmental impacts are anticipated at this time.
The key applicable design services are as follows:
Project Activity 3: General Tasks
Task 3.1 Public Involvement
Task 3.3 Specifications and Estimates
Task 3.4 Contract Maintenance and Project Documentation
Task 3.6 Prime Consultant Project Manager Meetings
Task 3.9 Digital Delivery
Project Activity 4: Roadway Analysis
Task 4.1 Typical Section Package
Task 4.5 Safety Analysis
Task 4.11 Horizontal/Vertical Master Design Files
Task 4.12 TTCP Analysis
Task 4.13 Utility Data Collection and Analysis
Task 4.14 Roadway/TTCP Quantities for EQ Report
Task 4.15 Cost Estimate
Task 4.18 Quality Assurance/Quality Control
Task 4.19 Supervision
Task 4.20 Roadway Meetings
Task 4.21 Field Reviews
Task 4.22 Coordination
Project Activity 5: Roadway Plans
Task 5.1 Key Sheet & Signature Sheet
Task 5.2 Typical Section Sheets
Task 5.4 General Notes/Pay Item Notes
Task 5.6 Plan View (Plan Sheets)
Task 5.9 Sidewalk Profiles
Task 5.13 Cross Sections
Task 5.14 Temporary Traffic Control Plan
Task 5.15 Utility Adjustment Sheets
Task 5.16 Project Control Sheets
Task 5.17 Utility Verification Data (SUE)
Task 5.18 Quality Assurance/Quality Control
Task 5.19 Supervision
Project Activity 6a: Drainage Analysis
Task 6a.3 Exist Permit Analysis
Task 6a.11 Design of Ditches and Side Drains
Task 6a.14 Design of Storm Drains
Task 6a.21 Drainage Design Documentation Report
Task 6a.22 Drainage Quantities for EQ Report
Task 6a.23 Cost Estimate
Task 6a.25 Quality Assurance/Quality Control
Task 6a.26 Supervision
Task 6a.27 Drainage Meetings
Task 6a.28 Field Reviews
Task 6a.29 Coordination
Project Activity 6b: Drainage Plans
Task 6b.3 Drainage Structures
Task 6b.4 Lateral Ditches
Task 6b.6 Quality Assurance/Quality Control
Task 6b.7 Supervision
Project Activity 6c: Selective Clearing and Grubbing
Task 6c.1 Data Collection and Inventory
Task 6c.2 Assessment of Disposition Determination
Task 6c.3 Selective C&G Maintenance Report
Task 6c.4 Selective C&G Plan
Task 6c.5 Selective C&G Quantities for EQ Report
Task 6c.6 Cost Estimate
Task 6c.7 Quality Assurance/Quality Control
Task 6c.8 Supervision
Task 6c.9 Selective C&G Meetings
Task 6c.10 Field Reviews
Task 6c.11 Coordination
Project Activity 7: Utilities
Task 7.1 Utility Kickoff Meeting
Task 7.2 Identify Existing Utility Agency Owners
Task 7.3 Make Utility Contacts
Task 7.6 Individual/Field Meetings
Task 7.7 Collect and Review Plans and Data from UAOs
Task 7.9 Utility Design Meeting
Task 7.10 Review Utility Markups and Work Schedules, and processing of
Schedules and Agreements
Task 7.11 Utility Coordination and Follow up
Task 7.12 Utility Constructability Review
Task 7.16 Certification and Close-out
Project Activity 19: Signing & Pavement Marking Analysis
Task 19.3 Signing and Pavement Marking Master Design File
Task 19.7 S&PM Quantities for EQ Report
Task 19.8 Cost Estimate
Task 19.11 Field Reviews
Task 19.13 Quality Assurance/Quality Control
Task 19.15 Supervision
Task 19.16 Coordination
Project Activity 20: Signing & Pavement Marking Plans
Task 20.1 Key Sheet
Task 20.2 General Notes/Pay Item Notes
Task 20.4 Plan Sheet
Task 20.9 Quality Assurance/Quality Control
Task 20.10 Supervision
Project Activity 25: Landscape Analysis
Task 25.3 Master Design File Setup
Task 25.16 Quality Assurance/Quality Control
Task 25.17 Supervision
Task 25.20 Coordination
Project Activity 26: Landscape Plans
Task 26.4 Planting Plans for Linear Areas
Task 26.12 Quality Assurance/Quality Control
Task 26.13 Supervision
Project Activity 27: Survey
Task 27.1 Horizontal Project Control (HPC)
Task 27.2 Vertical PC/Bench Line
Task 27.3 Alignment and Existing R/W Lines
Task 27.6 Topography
Task 27.20 Subdivision Location
Task 27.27 Work Zone Safety
Task 27.32 Document Research
Task 27.33 Field Reviews
Task 27.35 Quality Assurance/Quality Control
Task 27.36 Supervision
Task 27.37 Coordination
Project Activity 29: Mapping Staff Hours
Task 29.21 Project Control Sheet
Task 29.31 Quality Assurance/Quality Control
Task 29.32 Supervision
Task 29.35 Coordination
File details come from the government source that posted it. Updated .