This document is a Task Work Order (TWO) No. 4 issued by the State of Florida Department of Transportation (FDOT) to Barge Design Solutions, Inc., located in Margate, FL. The contract number is CAQ78 with a Financial ID No. 447945-1-32-01, and it is part of a Continuing Services for Project Design agreement.

The task work order covers sidewalk improvements along SR-715, specifically from Hatcher Road to Paul Radin Park and from Airport Road to SW 14th Street. The project involves design services for concrete sidewalk improvements, including curb ramps, detectable warning surfaces, and crosswalks. The total compensation for the project is $258,430.67, broken down into $227,359.09 for Basic Services and $31,071.58 for Sue & Survey. The services will be completed using a lump sum method based on percentage of completion and loaded billing rates. The project aims to improve pedestrian safety by installing a new 6-foot concrete sidewalk along the west side of SR-715, with a total project length of approximately 5,000 linear feet across two segments. No right-of-way or environmental impacts are anticipated, and the project is designed to meet Americans with Disabilities Act (ADA) standards.

View the file

Other files

File Type Posted
CN-550000-CAQ78-00040000.pdf PDF
CN-550000-CAQ78-W0010000.pdf PDF
CN-550000-CAQ78.pdf PDF
CN-550000-DON55-W0080000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-CAQ78-W0020000.pdf PDF
CN-550000-CAQ78-00020000.pdf PDF
CN-550000-CAQ78-00030000.pdf PDF
CN-550000-CAQ78-W0030000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

11/27/2028

*Limiting or Estimating/Budgeted Amount.

Distribution:

Consultant Acceptance:

Signature

Consultant, Procurement, Financial Services, FDOT Project Manager, File

Vice President

$258,430.67

$0.00

(name) (title)

Kevin Kennoy

$258,430.67

Total authorizations to date (including this one):

Departmental Approval:

$227,359.09 Limit

Sue & Survey $31,071.58 Limit

Sidewalk improvements along SR-715 from Hatcher Rd. to Paul Radin Park & Airport Rd to SW 14th St.

Barge Design Solutions, Inc.

101 N. State Road 7, Suite 4, Margate, FL 33063

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$258,430.67

(LS2) Lump sum paid based on % of completion

(LA4) Units worked at loaded billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total

Basic Services

$450,448.20

(name) (title) Signature

Luciana Amato Contract Coordinator

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Task Work Order No.:

Contract No.: Payment FM No.:

CAQ78 447945-1-32-01

Docusign Envelope ID: 617F8563-D929-4A27-8CCD-1379F9FE9C12

08/08/2025 | 8:11 AM EDT

Contract No.: CAQ78

Financial ID No. 440455-8-32-01

CONTINUING SERVICES FOR PROJECT DESIGN

Scope of Services Task Work Order (TWO) No. 4 Financial ID No. 447945-1-32-01

Sidewalk Improvements along SR-715 from Hatcher Rd. to Paul Radin Park

And Airport Rd. to SW 14th St.

The CONSUTANT shall provide design services for concrete sidewalk improvements including curb ramps, detectable warning surfaces, and crosswalks along SR-715, in accordance with FDOT

Design Manual (FDM). The nature of this project is safety improvements.

The proposed project will improve the safety of pedestrians along the west side of SR-715 from

400’ north of Hatcher Road to Paul Rardin Park for a length of 3,400’ (Segment 1) and from

Airport Road to SW 14th Street for a length of 1,600’ (Segment 2). The project includes a new 6-foot concrete sidewalk along the west side of SR-715. In addition, curb ramps, detectable warning surfaces and crosswalks will be provided where needed to meet the Americans with Disabilities

Act (ADA) standards.

No Right-of-Way or Environmental impacts are anticipated at this time.

The key applicable design services are as follows:

Project Activity 3: General Tasks

Task 3.1 Public Involvement

Task 3.3 Specifications and Estimates

Task 3.4 Contract Maintenance and Project Documentation

Task 3.6 Prime Consultant Project Manager Meetings

Task 3.9 Digital Delivery

Project Activity 4: Roadway Analysis

Task 4.1 Typical Section Package

Task 4.5 Safety Analysis

Task 4.11 Horizontal/Vertical Master Design Files

Task 4.12 TTCP Analysis

Task 4.13 Utility Data Collection and Analysis

Task 4.14 Roadway/TTCP Quantities for EQ Report

Task 4.15 Cost Estimate

Task 4.18 Quality Assurance/Quality Control

Task 4.19 Supervision

Task 4.20 Roadway Meetings

Task 4.21 Field Reviews

Task 4.22 Coordination

Project Activity 5: Roadway Plans

Task 5.1 Key Sheet & Signature Sheet

Task 5.2 Typical Section Sheets

Task 5.4 General Notes/Pay Item Notes

Task 5.6 Plan View (Plan Sheets)

Task 5.9 Sidewalk Profiles

Task 5.13 Cross Sections

Task 5.14 Temporary Traffic Control Plan

Task 5.15 Utility Adjustment Sheets

Task 5.16 Project Control Sheets

Task 5.17 Utility Verification Data (SUE)

Task 5.18 Quality Assurance/Quality Control

Task 5.19 Supervision

Project Activity 6a: Drainage Analysis

Task 6a.3 Exist Permit Analysis

Task 6a.11 Design of Ditches and Side Drains

Task 6a.14 Design of Storm Drains

Task 6a.21 Drainage Design Documentation Report

Task 6a.22 Drainage Quantities for EQ Report

Task 6a.23 Cost Estimate

Task 6a.25 Quality Assurance/Quality Control

Task 6a.26 Supervision

Task 6a.27 Drainage Meetings

Task 6a.28 Field Reviews

Task 6a.29 Coordination

Project Activity 6b: Drainage Plans

Task 6b.3 Drainage Structures

Task 6b.4 Lateral Ditches

Task 6b.6 Quality Assurance/Quality Control

Task 6b.7 Supervision

Project Activity 6c: Selective Clearing and Grubbing

Task 6c.1 Data Collection and Inventory

Task 6c.2 Assessment of Disposition Determination

Task 6c.3 Selective C&G Maintenance Report

Task 6c.4 Selective C&G Plan

Task 6c.5 Selective C&G Quantities for EQ Report

Task 6c.6 Cost Estimate

Task 6c.7 Quality Assurance/Quality Control

Task 6c.8 Supervision

Task 6c.9 Selective C&G Meetings

Task 6c.10 Field Reviews

Task 6c.11 Coordination

Project Activity 7: Utilities

Task 7.1 Utility Kickoff Meeting

Task 7.2 Identify Existing Utility Agency Owners

Task 7.3 Make Utility Contacts

Task 7.6 Individual/Field Meetings

Task 7.7 Collect and Review Plans and Data from UAOs

Task 7.9 Utility Design Meeting

Task 7.10 Review Utility Markups and Work Schedules, and processing of

Schedules and Agreements

Task 7.11 Utility Coordination and Follow up

Task 7.12 Utility Constructability Review

Task 7.16 Certification and Close-out

Project Activity 19: Signing & Pavement Marking Analysis

Task 19.3 Signing and Pavement Marking Master Design File

Task 19.7 S&PM Quantities for EQ Report

Task 19.8 Cost Estimate

Task 19.11 Field Reviews

Task 19.13 Quality Assurance/Quality Control

Task 19.15 Supervision

Task 19.16 Coordination

Project Activity 20: Signing & Pavement Marking Plans

Task 20.1 Key Sheet

Task 20.2 General Notes/Pay Item Notes

Task 20.4 Plan Sheet

Task 20.9 Quality Assurance/Quality Control

Task 20.10 Supervision

Project Activity 25: Landscape Analysis

Task 25.3 Master Design File Setup

Task 25.16 Quality Assurance/Quality Control

Task 25.17 Supervision

Task 25.20 Coordination

Project Activity 26: Landscape Plans

Task 26.4 Planting Plans for Linear Areas

Task 26.12 Quality Assurance/Quality Control

Task 26.13 Supervision

Project Activity 27: Survey

Task 27.1 Horizontal Project Control (HPC)

Task 27.2 Vertical PC/Bench Line

Task 27.3 Alignment and Existing R/W Lines

Task 27.6 Topography

Task 27.20 Subdivision Location

Task 27.27 Work Zone Safety

Task 27.32 Document Research

Task 27.33 Field Reviews

Task 27.35 Quality Assurance/Quality Control

Task 27.36 Supervision

Task 27.37 Coordination

Project Activity 29: Mapping Staff Hours

Task 29.21 Project Control Sheet

Task 29.31 Quality Assurance/Quality Control

Task 29.32 Supervision

Task 29.35 Coordination