This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT), involving CORE Engineering Group, LLC as the consultant and GOAL Associates Inc. as the named consultant in the scope of work. The task work order is associated with Contract No. CAQ78 and Payment FM No. 445625-1-62-02, specifically for Task Work Order #2.
The task work order covers post-design services for Systematic Intersection Lighting Improvements in Broward County, with a total compensation limit of $17,855.26. Services include attending pre-construction and scheduled meetings, providing construction assistance such as responding to Requests for Information (RFIs), interpreting construction plans, offering engineering solutions to field conditions, updating plans, and reviewing shop drawings. The contract is set to be completed by 11/27/2028, with the consultant required to respond to contractor requests within 24 hours and absorb any costs associated with plan revisions resulting from design errors or omissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAQ78-00040000.pdf | ||
| CN-550000-CAQ78-W0040000.pdf | ||
| CN-550000-CAQ78-W0010000.pdf | ||
| CN-550000-CAQ78.pdf | ||
| CN-550000-DON55-W0080000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAQ78-00020000.pdf | ||
| CN-550000-CAQ78-00030000.pdf | ||
| CN-550000-CAQ78-W0030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
11/27/2028
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAQ78 445625-1-62-02
$100,796.50
(name) (title) Signature
Ashley Dixon Contract Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
CORE Engineering Group, LLC
101 N. State Road 7, Suite 4, Margate, FL 33063
(To be entered upon execution of T.W.O.)
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$17,855.26
$17,855.26 Limit
Brief Task Description:
Post Design Services for Systematic Intersection Lighting Improvements in Broward County.
Signature
Consultant, Procurement, Financial Services, FDOT Project Manager, File
$17,855.26
$0.00
(name) (title)
Md Rahman
$17,855.26
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
Docusign Envelope ID: 5DA2E8CD-6A84-4AB4-AD0B-9D9333B862B1
08/16/2024 | 3:15 PM EDT
EXHIBIT A
A-1
SCOPE FOR POST DESIGN SERVICES
Contract – CAQ78
FM No. 445625-1-62-02 Task Work Order #2
The CONSULTANT (GOAL Associates Inc.) shall provide post design services for the Systematic Intersection Lighting Improvements Broward County (FM No. 445625-1-62-02).
I SERVICES TO BE PROVIDED BY THE CONSULTANT
The activities associated with Post Design Services can be characterized as the following:
Meetings: The CONSULTANT is expected to attend all pre-construction meetings as well as those regularly scheduled meetings throughout the construction phase when deemed necessary by the DEPARTMENT.
Construction Assistance: This includes responses to Requests for Information (RFI), interpretation of construction plans and documents, and engineering solutions to changed conditions encountered in the field. Site visits shall be made by the CONSULTANT when agreed upon with the DEPARTMENT. The CONSULTANT shall respond to all requests from the contractor within 24 hours. This does not mean that the issue will be resolved; it simply means that the CONSULTANT has received the request, states an immediate course of action, and begins the communication process
Plan Updates/Changes: This includes effort required to provide revised plan sheets reflecting any changes made during construction. During construction, the CONSULTANT may be requested by the DEPARTMENT to review proposed field changes or to respond with a recommended solution to remedy particular field situations not covered by the plans and specifications. If the plan revision(s) are due to design errors and omissions, the CONSULTANT shall track the revisions independent of the normal post design services tasks and any costs associated with this work effort will be absorbed by the CONSULTANT.
Shop Drawing Review: This includes review of shop drawings and erection plans for all components supplied by the contractor and required by the bid documents. For all independently supported sign structures of which the contractor is responsible, the CONSULTANT will review and check all the foundation, sign structure design, and shop drawings submitted by the contractor.
III CONSULTANT RESPONSIBILITIES:
The Consultant’s responsibilities remain the same as in the Original Agreement and any Supplemental Amendments to date shall remain the same.
IV DEPARTMENT RESPONSIBILITIES:
The Department’s responsibilities remain the same as in the Original Agreement and any Supplemental Amendments to date shall remain the same.
Docusign Envelope ID: 5DA2E8CD-6A84-4AB4-AD0B-9D9333B862B1
File details come from the government source that posted it. Updated .