This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), specifically Task Work Order No. 02 under Contract No. CAK30. The prime consultant is CHA Consulting, Inc., located in Doral, Florida. The task work order is associated with Financial Project ID 452467-1-32-01 and involves a project in Broward County.

The scope of work focuses on adding a Midblock Pedestrian Signal Crossing on A1A/Fort Lauderdale Beach Boulevard, 350 linear feet south of NE 14th Court. The project includes roadway modifications such as median opening, sidewalk adjustments, ADA ramps, signalization with countdown timer pedestrian signals, signing and pavement markings, and lighting design. The total compensation for this task work order is $77,248.75, to be paid on a lump sum basis based on percentage of completion. The project is scheduled for completion by August 24, 2027, with specific plan deliverables including constructability, biddability, production roadway and traffic control plans, signing and pavement marking plans, signalization plans, and a lighting analysis report.

View the file

Other files

File Type Posted
CN-550000-CAK30-00030000.pdf PDF
CN-550000-CAK30-00060000.pdf PDF
CN-550000-CAK30-W0050000.pdf PDF
CN-550000-CAK30.pdf PDF
CN-550000-CAV61-W0010000.pdf PDF
CN-550000-CAK30-00040000.pdf PDF
CN-550000-CAK30-W0020000.pdf PDF
CN-550000-CAK30-W0040000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-CAK30-00020000.pdf PDF
CN-550000-CAK30-00050000.pdf PDF
CN-550000-CAK30-W0030000.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

8/24/2027

*Limiting or Estimating/Budgeted Amount.

Distribution:

Consultant Acceptance:

Signature

Consultant, Procurement, Financial Services, FDOT Project Manager, File

Project Team Leader / Senior Project Manager

$77,248.75

$0.00

(name) (title)

Eithel Sierra, P.E.

$77,248.75

Total authorizations to date (including this one):

Departmental Approval:

$77,248.75 Limit

Midblock Pedestrian Signal Crossing A1A / Fort Lauderdale Beach Blvd 350-LF South of NE 14th Ct.

CHA Consulting, Inc.

8935 NW 35 Lane, Suite 200, Doral, FL 33172

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$77,248.75

(LS2) Lump sum paid based on % of completion

Page 1 Total

Page 2 thru 6 Subtotal

Total

Basic Services

$152,791.70

(name) (title) Signature

Luciana Amato Contract Coordinator

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Task Work Order No.:

Contract No.: Payment FM No.:

CAK30 452467-1-32-01

DocuSign Envelope ID: 193FCEB6-D8A1-4F4E-8786-5D0BCF41354C

01/23/2023 | 11:48 AM EST

EXHIBIT A

TASK WORK ORDER SCOPE OF SERVICES / TWO No. 02

Districtwide Minor Project Traffic Design Consultant

PRIME CONSULTANT: CHA Consulting, Inc.

CONTRACT No. CAK30

FINANCIAL PROJECT ID: 452467-1-32-01

Project Location: A1A / Fort Lauderdale Beach Blvd 350-LF South of NE 14th Ct.

Roadway ID: 86050000

Project Limits: Addition of Pedestrian Midblock crossing, 3.778 to 3.873

County: Broward

Project Manager: Omid Fallahinejad, P.E.

Background:

This project is in Broward County from 350-LF south of NE 14th Ct on A1A / Fort Lauderdale Beach Blvd. The scope includes adding a Midblock Pedestrian Signal Crossing. A1A is classified as a Suburban Residential throughout the limits of the project corridor and it is comprised of an existing 3-lane (one lane on each direction and a median). There are existing lighting features throughout the corridor.

Scope:

• Roadway Scope:

o Provide the median opening required for the proposed midblock crossing o Proposed sidewalk adjustment on west and east side o Proposed ADA Ramps o Evaluate the existing drainage o TTCP

• Signing & Pavement Marking:

o Proposed Signing & Pavement Marking required for the proposed Midblock crossing

• Signalization scope:

o Proposed mast arm for Midblock Pedestrian Crossing o A1A 350-LF South of NE 14th Ct.

o Countdown timer Ped signals o ADA compliant push button locations

• Structural Scope:

o Proposed mast arm in the West side of the corridor

• Lighting Scope:

o Design to meet lighting criteria at the Midblock Pedestrian crossing

Deliverables:

Include the following Deliverables:

Constructability, Biddability, Production (signed and sealed) Roadway & TTCP Plans, Signing & Pavement Marking

Plans, signalization Plans, lighting Plans and Lighting Analysis Report.

Schedule:

Design and Plans preparation will follow the project schedule for FPID No. 452467-1-52-01with the deadlines of:

• Constructability Plans: ………………………………. TBD 2023

• Biddability Plans: ………………………………………. TBD 2023

• Production Plans: ……………………………………… TBD 2023

• Letting Date: ………………………………………………TBD 2023

CONSULTANT RESPONSIBILITIES: The Consultant’s responsibilities remain the same as in the Original Agreement and any Supplemental Amendments to date shall remain the same.

DEPARTMENT RESPONSIBILITIES: The Department’s responsibilities remain the same as in the Original Agreement and any Supplemental Amendments to date shall remain the same.