CN-550000-CAK30-00050000.pdf
PDF 454 KB Posted
- Contract number
- CAK30
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to CHA Consulting, Inc., located in Doral, FL. The contract is part of a Districtwide Minor Project Traffic Design initiative, with a specific focus on a project along SR 820/Pines Blvd from US 27 to University Drive. The task work order is issued under the Standard Professional Services Agreement CAK30 and involves a lighting infrastructure conversion project.
The scope of work involves evaluating and determining an appropriate retrofitted LED fixture to maintain or exceed existing light levels along the specified corridor. The project will focus on converting high mast HPS luminaires on the north side of the corridor, including replacement of luminaire rings and lift cables. The total contract amount is $88,922.08, with services to be completed by 8/24/2027. The work includes detailed tasks such as lighting design analysis, voltage drop calculations, reference and master design files preparation, field reviews, technical meetings, and coordination with various agencies including FPL and the City of Pembroke Pines. The contract is a lump sum payment based on percentage of completion, with no additional options or renewals specified in the provided documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAK30-00020000.pdf | ||
| CN-550000-CAK30-W0030000.pdf | ||
| CN-550000-CAK30-00060000.pdf | ||
| CN-550000-CAK30-W0050000.pdf | ||
| CN-550000-CAK30.pdf | ||
| CN-550000-CAV61-W0010000.pdf | ||
| CN-550000-CAK30-W0010000.pdf | ||
| CN-550000-CAK30-00040000.pdf | ||
| CN-550000-CAK30-W0020000.pdf | ||
| CN-550000-CAK30-W0040000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAK30-00030000.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
8/24/2027
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAK30 441927-2-32-01
$342,171.33
(name) (title) Signature
Luciana Amato Contract Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
CHA Consulting, Inc.
8935 NW 35 Lane, Suite 200, Doral, FL 33172
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$88,922.08
$88,922.08 Limit
Evaluate and determine the appropriate retrofitted LED fixture to maintain (or exceed) the existing light levels along SR 820/Pines Blvd from US 27 to University Drive
Signature
Consultant, Procurement, Financial Services, FDOT Project Manager, File
Project Team Leader / Senior Project Manager
$88,922.08
$0.00
(name) (title)
Eithel Sierra, P.E.
$88,922.08
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
DocuSign Envelope ID: 7C2D7B62-5E5D-44C3-9A9D-AF228C3B9F31
05/03/2024 | 1:06 PM EDT
EXHIBIT “A”
SCOPE OF SERVICES
Contract Number: CAK30 Districtwide Minor Project Traffic Design
Consultant Project FPID: 441927-2-32-01 Task Work Order No.: 006
1.0 BACKGROUND:
The Consultant has been retained by the Florida Department of Transportation District Four under the Standard Professional Services Agreement CAK30 to provide engineering.
2.0 PURPOSE:
The purpose of this Scope is to provide engineering services necessary to evaluate and determine the appropriate retrofitted LED fixture to maintain (or exceed) the existing light levels along SR
820/Pines Blvd from US 27 to University Drive. The North side of the existing Lighting System in this corridor currently has High Mast HPS Luminaires and the South side is a mix of FP&L and
DOT standard light poles. Our Scope will be only focused to retrofit high mast lighting on the North
Side of the corridor due to the Department’s request that no changes are to be recommended to the luminaires on the South Side of Pembroke Pines. The high mast retrofit will also include the replacement of the luminaire rings and the lift cables for all high masts. As part of this project the
Consultant will also upgrade the existing load centers as per FPL Tariff SL-1, which requires that all service points be metered.
3.0 SCOPE:
Design Analysis
The CONSULTANT shall analyze and document engineering tasks in accordance with all applicable manuals, guidelines, standards, handbooks, procedures, and current design memorandums.
Task A – Lighting Design Analysis Report (LDAR)
Lighting Design Analysis Report:
• Introduction
• Photometric Analysis Report
• Voltage Drop
• Fault Current Calculation
Task B – Construction Lighting Plans
Lighting Plans:
• Key Sheet
• Signature Sheet
• General Notes/Pay Items Notes
• Pole Data
• Legend and Criteria
• Project Layout
• Plans Sheets
• Load Center Detail
• Special Detail (High Mast Aiming Chart)
Quantities Provide Electrical Quantities.
Cost Estimate
Provide Engineer’s Opinion of Probable Construction Cost Estimate.
Field Reviews
Field investigation shall be performed by consultant.
Quality Assurance/Quality Control
The CONSULTANT shall be responsible for the professional quality, technical accuracy and coordination of all services furnished by the CONSULTANT under this contract.
Supervision
Includes all efforts required to supervise all electrical technical design activities.
Coordination
Includes all efforts required to coordinate all technical design activities with FPL and City of
Pembroke Pines.
4.0 CONSULTANT RESPONSIBILITIES:
The Consultant’s responsibilities remain the same as in the Original Agreement and any
Supplemental Amendments to date shall remain the same.
5.0 DEPARTMENT RESPONSIBILITIES:
The Department’s responsibilities remain the same as in the Original Agreement and any
Supplemental Amendments to date shall remain the same.
Name of Consultant Project Information Sheet
Financial Project Identification Number: 441927-2-32-01 TBA
Name of Prime / Subconsultant: CHA Consulting, Inc County: Broward
Project Description: SR 820/Pines Blvd From US 27 to University Drive - High Mast HPS to LED Conversion
Begin Milepost: 11 Miles
Number of Lanes: (Urban / Rural / Int.) Lane Configuration: (Divided / Undivided)
Project Type: Roadway Classification: (NHS/FIHS/Off Sys.)
CAP Level:
Design Variations:
Proposed Design Contract Time: months/days Date of Negotiation: Context Classification:
3. Project Common & Project General Tasks
4. Roadway Analysis
5. Roadway Plans
6a. Drainage Analysis
6b. Drainage Plans
7. Utilities
8. Environmental Permits and Env. Clearances
9. Structures Summary
10. Structures - Bridge Development Report
11. Structures - Temporary Bridge
12. Structures - Short Span Concrete
13. Structures - Medium Span Concrete
14. Structures - Structural Steel
15. Structures - Segmental Concrete
16. Structures - Movable Span
17. Structures - Retaining Walls
18. Structures - Miscellaneous
19. Signing and Pavement Marking Analysis
20. Signing and Pavement Marking Plans
21. Signalization Analysis
22. Signalization Plans
23. Lighting Analysis
24. Lighting Plans
25. Landscape Analysis
26. Landscape Plans
27. Survey
28. Photogrammetry
29. Mapping
30. Terrestrial Mobile LiDAR
31. Architecture Development
32. Noise Barriers Impact Design Assessment
33. Intelligent Transportation Systems Analysis
34. Intelligent Transportation Systems Plans
35. Geotechnical
36. 3D Modeling
Federal Aid Project Identification Number:
End Milepost: Project Length:
Typical Section:
Project Activity:
Estimated By: Negotiated By: (name - firm)
Consultant FDOT Consultant FDOT
2. 2.
3. 3.
4. 4.
5. 5.
(Minor / Major) Access Management Classification:
TTCP Level: Survey Level:
1. Design Exceptions: 1.
CAK30 TWO #6 for SR 820 US 27 to Univ Drive Rev 1(3-28-23)
Project Information Page 1 of 8 3/28/2024
Financial Project Number: 441927-2-32-01 Project Name: SR 820/Pines Blvd From US 27 to University Drive - High Mast HPS to LED Conversion
FAP Number: TBA Date: 3/28/2024 Name of Consultant: CHA Consulting, Inc
WORK EMPLOYEE CLASSIFICATION
ACTIVITY ON CADD
Firm Total
Project
Manager 2
Home
Senior
Electrical
Engineer
Home
Senior
Designer
Home
Senior
Engineering
Technician
Home
Staff Classi-fication 5
Staff Classi-fication 6
Staff Classi-fication 7
Staff Classi-fication 8
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11
Staff Classi-fication 12
Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours PERCENT
3. Project General and Project Common Tasks 28 28 0 0 0 0 0 0 0 0 0 0 0 28 31
23. Lighting Analysis 699 35 105 280 279 0 0 0 0 0 0 0 0 699 769
24. Lighting Plans 138 7 21 55 55 0 0 0 0 0 0 0 0 138 152
TOTALS 865 70 126 335 334 0 0 0 0 0 0 0 0 865 952
Field Survey Estimate:
Notes: 0 4-person crew days 865 952
1. This worksheet provides the distribution of a firm's total staff hours for a project.
2. Percentages for staff hour distribution by classification are entered below in rows 64 to 98 of this sheet.
3. Total Staff Hours (column O) may not match staff hours from Summary worksheet (column B) due to rounding. Staff hours calculated for employee classifications are to be adjusted so totals in columns B and O match.
4. Formulas under "Total Staff Hours Range" (columns O & P) may be adjusted to provide desired range.
Financial Project Number: 441927-2-32-01 Project Name:SR 820/Pines Blvd From US 27 to University Drive - High Mast HPS to LED Conversion
FAP Number: TBA Date: 3/28/2024 Name of Consultant: CHA Consulting, Inc
Hours from
"Summary" sheet
Firm Total
Project
Manager 2
Home
Senior
Electrical
Engineer
Home
Senior
Designer
Home
Senior
Engineering
Technician
Home
Staff Classi-fication 5
Staff Classi-fication 6
Staff Classi-fication 7
Staff Classi-fication 8
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11
Staff Classi-fication 12 Total
3. Project General and Project Common Tasks 28 100.0% 100.00%
23. Lighting Analysis 699 5.0% 15.0% 40.0% 40.0% 100.00%
24. Lighting Plans 138 5.0% 15.0% 40.0% 40.0% 100.00%
Hours from
"Summary" sheet
ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS - FIRM TOTAL
Staff Hour Distribution Percentages - Firm Total
ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS - FIRM TOTAL
STAFF HOURS
TOTAL
FIRM TOTAL
RANGE
CAK30 TWO #6 for SR 820 US 27 to Univ Drive Rev 1(3-28-23)
Staff Hour Summary - Firm Page 2 of 8 3/28/2024 11:55 AM
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: Consultant Name: CHA Consulting, Inc
County: Consultant No.:
FPN: Date: 3/28/2024
FAP No.:
SR 820/Pines Blvd From US 27 to University Drive - High Mast HPS to LED Conversion Broward 441927-2-32-01 TBA Estimator: David Sigler
SH Salary Average
By Cost By Rate Per
$199.22 $144.41 $97.88 $71.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task
3. Project General and Project Common Tasks 28 28 0 0 0 0 0 0 0 0 0 0 0 28 $5,578 $199.22
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 699 35 105 280 279 0 0 0 0 0 0 0 0 699 $69,583 $99.55
24. Lighting Plans 138 7 21 55 55 0 0 0 0 0 0 0 0 138 $13,761 $99.72
25. Landscape Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
36. 3D Modeling 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 865 70 126 335 334 0 0 0 0 0 0 0 0 865
Total Staff Cost $13,945.40 $18,195.66 $32,789.80 $23,991.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $88,922.08 $102.80
Check = $88,922.08
Survey Field Days by Subconsultant SALARY RELATED COSTS: $88,922.08
4 - Person Crew: OVERHEAD: 0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: 0.00% $0.00
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. Survey (Field - if by Prime) 0
4-person crew days @ -$ / day $0.00
SUBTOTAL ESTIMATED FEE: $88,922.08
SUBTOTAL ESTIMATED FEE: $88,922.08
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $88,922.08
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $88,922.08
Staff Classi-fication 12
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11
Staff Classi-fication 6
Staff Classi-fication 7
Staff Classi-fication 8
Senior Electrical
Engineer Home
Senior Designer
Home
Senior Engineering
Technician Home
Staff Classi-fication 5 Staff Classification
Total Staff
Hours From
"SH
Summary -
Firm"
Project Manager 2
Home
CAK30 TWO #6 for SR 820 US 27 to Univ Drive Rev 1(3-28-23)
Fee Sheet - Prime Page 8 of 3 3/28/2024 11:55 AM
Project Activity 3: General Tasks
SR 820/Pines Blvd From US 27 to University Drive - High Mast HPS to LED
Conversion 441927-2-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Task
No.
Task Units No of Units Hours/ Unit
Total
Hours Comments
3.1
3.1.1 Community Awareness Plan LS 1 0 0
3.1.2 Notifications LS 1 0 0
3.1.3 Preparing Mailing Lists LS 1 0 0
3.1.4 Median Modification Letters LS 1 0 0
3.1.5 Driveway Modification Letters LS 1 0 0
3.1.6 Newsletters LS 1 0 0
3.1.7 Renderings and Fly Throughs LS 1 0 0
3.1.8 PowerPoint Presentation LS 1 0 0
3.1.9 Public Meeting Preparations LS 1 0 0
3.1.10 Public Meeting Attendance/Followup LS 1 0 0
3.1.11 Other Agency Meetings LS 1 0 0
3.1.12 Web Site LS 1 0 0
3.2 Joint Project Agreements EA 0 0 0
3.3
3.3.1 Specifications Package Preparation LS 1 0 0
Report 0 Calculated
Hours
Components 0 0
3.4 Contract Maintenance and Project Documentation LS 1 24 24 3 Hrs x 8 months
3.5 Value Engineering (Multi-Discipline Team) Review LS 1 0 0
3.6 Prime Consultant Project Manager Meetings LS 1 4 4 See listing below
3.7 Plans Update LS 1 0 0
Estimator: David Sigler
3.1 Public Involvement Subtotal
CHA David Sigler
Representing Print Name
FDOT District Omid Fallahinejad
Public Involvement
Specifications & Estimates
3.3.2 Estimated Quantites Report Preparation
CAK30 TWO #6 for SR 820 US 27 to Univ Drive Rev 1(3-28-23)
3. Project General Tasks Page 4 of 8 3/28/2024
Project Activity 3: General Tasks
Task
No.
Task Units No of Units Hours/ Unit
Total
Hours Comments
3.8 Post Design Services LS 1 0 0
3.9 Digital Delivery LS 1 0 0
3.10 Risk Assessment Workshop LS 1 0 0
3.11 Railroad, Transit, and/or Airport Coordination LS 1 0 0
3.11.1 Aeronautical Evaluation LS 1 0 0
3.12 Landscape and Existing Vegetation Coordination LS 1 0 0
3.13 Other Project General Tasks LS 1 0 0
Units No of Units Hours/ Unit Total Hours Comments
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 4 1 4 One meeting every other month
EA 0 0 0
EA 0 0 0
4 4 Total PM Meeting Hours carries to Task 3.6 above
Photogrammetry
Survey
Landscape Architecture
Lighting
Signing & Pavement Marking
Total Project Manager Meetings
Field Reviews
Phase Reviews
Progress Meetings
Geotechnical
ITS Analysis
Structures
Environmental
Utilities
Drainage
Noise Barriers
Signalization
Architecture
Terrestrial Mobile LiDAR
ROW & Mapping
Roadway Analysis
3.6 - List of Project Manager Meetings
3. Project Common and Project General Tasks Total
CAK30 TWO #6 for SR 820 US 27 to Univ Drive Rev 1(3-28-23)
3. Project General Tasks Page 5 of 8 3/28/2024
Project Activity 23: Lighting Analysis
Estimator: David Sigler SR 820/Pines Blvd From US 27 to University Drive - High Mast HPS to LED
Conversion 441927-2-32-01
NOTE: Signature Block is optional, per District preference
Task
No.
Task Units
No. of
Units
Hours/
Units
Total
Hours
23.1 Lighting Justification Report LS 1 0 0
23.2 Lighting Design Analysis Report (LDAR) LS 1 60 60
23.3 Voltage Drop Calculations EA 4 2 8
23.4 FDEP Coordination and Report LS 1 0 0
23.5 Reference and Master Design Files LS 1 455 455
23.6 Temporary Highway Lighting LS 1 0 0
23.7 Design Documentation LS 1 8 8
Calculated
Hours
23.9 Cost Estimate LS 1 8 8
23.10 Technical Special Provisions and Modified Special
Provisions
LS 1 0 0
23.11 Other Lighting Analysis LS 1 0 0
23.12 Field Reviews LS 1 32 32
23.13 Technical Meetings LS 1 2 2
23.14 Quality Assurance/Quality Control LS % 5% 29
23.15 Independent Peer Review LS % 0% 0
23.16 Supervision LS % 5% 29
Signature / Date
Comments
Considering 11 miles of corridor and impact of the requested retrofit for the west bound over the east bound lanes
Assuming 4 service points and 2 Hrs per each on the north side of Pembroke Pines Blvd.
Design layout will be done based on aerials and none of the proposed features are part of this design. Based on that we are considering (11 miles) 15 Hr Set-Up plus 40 Hrs per Mile
Lighting Analysis Technical Subtotal
Lighting Analysis Nontechnical Subtotal
63Light Poles
Assuming (2) Virtual Meetings X (1Hr each) X 2 People
Representing Print Name
FDOT District Omid Fallahinejad
CHA David Sigler
Assuming 2Hrs for Engineering Estimate and 4 Hrs considering two submittal
23.8 Lighting Quantities for EQ Report
We are considering 20 Hrs for first 8 poles and 0.5 Hr for the rest of 55 poles.
CAK30 TWO #6 for SR 820 US 27 to Univ Drive Rev 1(3-28-23)
23. Lighting Analysis Page 6 of 8 3/28/2024
Project Activity 23: Lighting Analysis
23.17 Coordination LS % 3% 20
Units No of Units Hours/ Unit Total
Hours Comments
PM Attendance at
Meeting Required?
Number
EA 1 1 1 Virtual Meeting 0
EA 0 0 0 0
EA 1 1 1 Virtual Meeting 0
EA 1 1 1 Email Coordination 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
3 Subtotal Project Manager Meetings 0
EA 0 0 0 - -
EA 0 0 0 - -
3 Total Project Manager Meetings (carries to Tab 3) 0
PM attendance at Progress Meetings is manually entered on General Task 3
PM attendance at Phase Review Meetings is manually entered on General Task 3
FDOT Traffic Design
23. Lighting Analysis Total
Technical Meetings
FDOT Lighting Design
Phase Review Meetings
Total Meetings
Power Company (service point coordination)
Maintaining Agency (cities, counties)
FDEP Lighting (coast areas)
Other Meetings
Subtotal Technical Meetings
Airport authority
Progress Meetings (if required by FDOT)
CAK30 TWO #6 for SR 820 US 27 to Univ Drive Rev 1(3-28-23)
23. Lighting Analysis Page 7 of 8 3/28/2024
SR 820/Pines Blvd From US 27 to University Drive - High Mast HPS to LED
Conversion 441927-2-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity Calculated Department Consultant Negotiated Provide documentation when negotiated hours differ from the calculated hours.
Key Sheet 1 4 0 0 4
Signature Sheet 0 0 0 0 0
24.2 General Notes/Pay Item Notes 1 Simple 6 0 0 6
24.3 Pole Data, Legend and Criteria Poles 63 18 0 0 18 Number of poles were provided by FDOT Maintnenance Department
24.4 Project Layout 1 6 0 0 6
Plan Sheets (Corridor Projects) Length (Miles) 11.00 92 0 0 70 Considering using 1"=200' (approximaterly 21 sheets) 4Hrs for set-up and 6 Hrs per mile=70 Hrs
Intersections or
Mid-Blocks 0 0 0 0 0
Interchanges or Rest Areas 0 0 0 0 0
2 Simple 8 0 0 8
0 Standard 0 0 0 0
0 Complex 0 0 0 0
0 Simple 0 0 0 0
1 Standard 12 0 0 12 Considering the application of FP&L Tariff FPL SL-1
0 Complex 0 0 0 0
24.8 Temporary Highway Lighting 0 0 0 0 0
146 0 0 124
24.9 Quality Assurance/Quality Control % 1 5% 7 7
24.10 Supervision % 1 5% 7 7
Service Point Details Service
Point
24.6 Special Details Details
FDOT District Omid Fallahinejad
Consultant Name David Sigler
Task
No.
Task
Project Parameter Staff Hours
Estimator: David Sigler 24. Lighting Plans
Representing Print Name
Lighting Plans Total
Lighting Plans Technical Hours Subtotal
24.5
Plan Sheets (Isolated Loctions)
24.1
24.7
File details come from the government source that posted it. Updated .