This document is an Amendment to a Standard Professional Services Agreement between the State of Florida Department of Transportation (FDOT) and Scalar Consulting Group Inc., specifically for District Five Professional Services Office located in DeLand, Florida. The amendment pertains to a project involving State Road 50 improvements between Primrose Drive and Maguire Boulevard in Orange County, Florida.
The amendment increases the total contract value from $734,142.00 to $842,947.00, adding $108,805.00 in funding. The scope of work includes design services for transportation facility improvements, featuring tasks such as trail connection design, roadway analysis, environmental permitting, signing and marking plans, survey support, and 3D modeling. Multiple subconsultants are involved, including VIB Engineering, Brindley Pieters and Associates, Geodata Consultants, ECHO UES, and Test Lab, Inc. The amendment covers various service categories including basic services, right-of-way mapping, survey services, and optional services, with Scalar Consulting Group Inc. receiving the majority of the contract value.
Text of this file
District Five Professional Services Office, 719 South Woodland Blvd. MS 4-524, Deland, Florida 32720, (386) 943-5526, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
08/21
Amendment Number: 1 Amendment Execution Date:
Original Agreement No.: CAF73 Original Agreement Execution Date: 9/29/2021
Consultant Name: Scalar Consulting Group Inc
FM Number(s): 447593-1-32-01
Agreement Description: SR 50 from Primrose Dr to Maguire Blvd
Purpose of Amendment: Add Funds, Incorporate attachments to the contract, Add Provision
The terms of the original agreement referenced above are hereby amended:
The total maximum limiting amount of $734,142.00 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $108,805.00. The revised total maximum limiting amount for all services is $842,947.00. The services specified in Exhibit “A”, Scope of Services of the original agreement are amended and attached as Exhibit "A".
The following Compensation Element is hereby incorporated into the agreement:
Optional Services (LS-2): The Consultant will receive progress payments for the subject task based on the percentage of task that has been completed and accepted by the Department during the billing period.
The following attachments are hereby incorporated into this Amendment:
Exhibit “A”. Scope of Services Pages A-1 to A-2 Attachment No. 1, Summary of Compensation
Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.
DocuSign Envelope ID: A055875E-27AC-4CA1-8898-57E09DAB31EF
5/18/2022 | 3:57 PM EDT
District Five Professional Services Office, 719 South Woodland Blvd. MS 4-524, Deland, Florida 32720, (386) 943-5526, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
08/21
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.
CONSULTANT STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
Scalar Consulting Group Inc
Name of Consultant
BY: BY:
Name: Name: Jack Adkins
Title: Title: Director of Transportation Development
District Five
FOR DEPARTMENT USE ONLY
PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:
Procurement Office Legal Office
Aniruddha Gotmare
President
A-1
EXHIBIT “A”
SCOPE OF SERVICES FOR SUPPLEMENTAL AMENDMENT #1
Contract No. CAF73
SR 50 FROM PRIMROSE DRIVE TO MAGUIRE BOULEVARD
Financial Project ID. 447593-1-32-01
Orange County
1.0 BACKGROUND
The DEPARTMENT retained the CONSULTANT under the Original Agreement to provide design services for the SR 50 from Primrose Drive to Maguire Boulevard project in Orange County, Florida.
2.0 PURPOSE
The purpose of this supplemental amendment is to describe the scope of work and the responsibilities of the CONSULTANT and the DEPARTMENT in connection with the design and preparation of a complete set of construction contract documents and incidental engineering services, as necessary, for improvements to the transportation facility described herein.
3.0 SERVICES TO BE PERFORMED
TASK 3 – PROJECT COMMON AND PROJECT GENERAL TASKS
The CONSULTANT shall coordinate and meet with the City of Orlando and the Department on the proposed trail connection at the intersection. This Supplemental Agreement includes evaluation the design alternative, meeting with FDOT and City, and prepare local funding agreement to the improvements. Attending Public information meeting with the FPID 437131-1 project, prepare the PPT slides with graphic and roll plots.
TASK 4 – ROADWAY ANALYSIS
The CONSULTANT shall prepare the temporary traffic control including bike and pedestrian detours and submit the Design Analysis and Recommendation Report. In addition, a lateral offset design variation will be documented for the trail connection.
This Supplemental Agreement also includes quantities and cost estimate for the trail connection.
TASK 5 AND 36 – ROADWAY PLANS AND 3D MODEL
The CONSULTANT shall prepare the typical section, plan sheet, temporary traffic control plans, and utility adjustment sheet for the trail connection. 12-foot 3D Model for the trail connection will be preparing for each phase submittal.
A-2
TASK 8 – ENVIRONMENTAL PERMITS
The CONSULTANT shall perform investigations in accordance with the DEPARTMENT’s Project Development and Environment Manual, Part II, Chapter 20 and as directed by the DEPARTMENT. Such investigation shall include standard Level I Assessments and Contamination Screening.
TASK 19 AND 20 – SIGNING AND MARKING ANALYSIS AND PLANS
The CONSULTANT shall prepare the signing and pavement marking for the trail limits.
Single post signs will be provided on the south side of SR 50.
TASK 27– SURVEY
Provide additional survey support as may be needed for the trail connection design, inclusive of SUE support for gravity wall.
Recover and tie corner monumentation for 2 subdivision blocks (includes additional secondary ground traverse) as shown on the attached survey exhibit titled "SR50_447593-1_27.20_Exhibit_SA.pdf".
TASK 29 – MAPPING
Plot and label 2 subdivision blocks Plot and label 0.3 miles of roadway topography One Control Survey detail sheet at 1” = 40’ scale One R/W Map detail sheet at 1” = 40’ scale Three acquisition parcel legal descriptions
4.0 CONSULTANT RESPONSIBILITIES
All services as outlined in the Original Agreement, including any Supplemental Amendments to date, shall remain in full force and effect.
5.0 DEPARTMENT RESPONSIBILITIES
The Department’s responsibilities remain the same as in the Original Agreement and any Supplemental Amendments to date.
6.0 OPTIONAL SERVICES
TASK 36 – 3D MODEL
The CONSULTANT shall prepare the 3D Model for the 12-foot trail connection for each phase submittal.
Compensation Element/Firm Original
Contract
Amount
This
Amendment
No. 1
Revised
Contract Totals
Basic Services (LS-2)
Scalar Consulting Group Inc. $537,761.00 $69,343.00 $607,104.00
VIBEngineering, Inc. $18,928.00 $0.00 $18,928.00
Brindley Pieters and Associates Inc. $5,312.00 $0.00 $5,312.00
R/W Control Map (LS-2)
Geodata Consultants Inc. $19,278.00 $2,816.00 $22,094.00
Right of Way Map (LS-2)
Geodata Consultants Inc. $15,388.00 $3,715.00 $19,103.00
Optional Services (LS-2)
Scalar Consulting Group Inc. $0.00 $14,318.00 $14,318.00
Legal Descriptions (LA-4)
Geodata Consultants Inc. $5,378.00 $2,017.00 $7,395.00
Supplemental Mapping (LA-4)
Geodata Consultants Inc. $2,075.00 $0.00 $2,075.00
Survery Services (LA-4)
Geodata Consultants Inc. $68,950.00 $8,493.00 $77,443.00
ECHO UES, Inc. $27,986.00 $8,103.00 $36,089.00
Supplemental Survey (Optional Services) (LA-4)
Geodata Consultants Inc. $7,308.00 $0.00 $7,308.00
ECHO UES, Inc. $4,981.00 $0.00 $4,981.00
Geotechnical Services (LA-4)
Test Lab, Inc. $11,242.00 $0.00 $11,242.00
Geotechnical Field and Lab Testing (LA-4)
Test Lab, Inc. $9,555.00 $0.00 $9,555.00
TOTAL MAXIMUM LIMITING AMOUNT: $734,142.00 $108,805.00 $842,947.00
ATTACHMENT No. 1: SUMMARY OF COMPENSATION
CONTRACT CAF73, AMDENDMENT NO. 1
Financial Project Number 447593-1-32-01
| Insert from: "CAF73 Scope of Services.pdf" |
| SR 50 from PRIMROSE DRIVE TO MAGUIRE BOULEVARD |
| 1.0 BACKGROUND |
| 2.0 PURPOSE |
| 3.0 SERVICES TO BE PERFORMED |
| TASK 3 – Project common and project general tasks |
| TASK 4 – roadway analysis |
| TASK 5 and 36 – roadway Plans and 3D model |
| TASK 8 – environmental permits |
| TASK 19 and 20 – signing and marking analysis and plans |
| TASK 27– SUrvey |
| TASK 29 – mapping |
| 5.0 DEPARTMENT RESPONSIBILITIES |
| 6.0 OPTIONAL SERVICES |
| TASK 36 – 3D model |
| Insert from: "CAF73 Scope of Services.pdf" |
| SR 50 from PRIMROSE DRIVE TO MAGUIRE BOULEVARD |
| 1.0 BACKGROUND |
| 2.0 PURPOSE |
| 3.0 SERVICES TO BE PERFORMED |
| TASK 3 – Project common and project general tasks |
| TASK 4 – roadway analysis |
| TASK 5 and 36 – roadway Plans and 3D model |
| TASK 8 – environmental permits |
| TASK 19 and 20 – signing and marking analysis and plans |
| TASK 27– SUrvey |
| TASK 29 – mapping |
| 5.0 DEPARTMENT RESPONSIBILITIES |
| 6.0 OPTIONAL SERVICES |
| TASK 36 – 3D model |
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAF73-S0010000.pdf | ||
| CN-550000-CAF73-S0020000.pdf | ||
| CN-550000-CAF73.pdf | ||
| CN-550000-CAF73-S0030000.pdf | ||
| CN-550000-BEF88-W0030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .