This document is an Amendment (Amendment No. 4) to a Standard Professional Services Agreement between the State of Florida Department of Transportation (FDOT) and Greenman Pedersen, Inc., located in District Four, Broward County. The original agreement was executed on 2/26/2021 with the Financial Project Number 446185-1-32-01, focusing on the resurfacing of State Road 5/US-1 from Northeast 17th Way to Northeast 33rd Court.

The amendment extends the contract services time through 5/31/2026 and increases the total maximum limiting amount by $54,886.58, bringing the total contract value to $1,101,045.76. The additional funds are specifically for design services to develop Concept Plans for signalizing the intersection of SR-5/US-1 and Trader Joe's driveway opening. The consultant will evaluate two signalization options: one with mast arms and another with a diagonal mast arm in the northeast corner and a signal pedestal in the median for southbound left turn movement. The project aims to enhance the overall safety and operations of the intersection, with utility coordination and traffic operations analysis included in the scope of services.

View the file

Other files

File Type Posted
CN-550000-BEI38-W0090000.pdf PDF
CN-550000-CAC18-S0010000.pdf PDF
CN-550000-CAC18-S0040000.pdf PDF
CN-550000-CAC18-S0050000.pdf PDF
CN-550000-CAC18-00030000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-CAC18-00010000.pdf PDF
CN-550000-CAC18-S0020000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

District Four Procurement Services Office, 3400 W. Commercial Blvd., Fort Lauderdale, Florida 33309, (954) 777-4603, www.fdot.gov

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

AMENDMENT TO

STANDARD PROFESSIONAL SERVICES AGREEMENT

375-030-97

PROCUREMENT

08/21

Amendment Number: 4 Amendment Execution Date:

Original Agreement No.: CAC18 Original Agreement Execution Date: 2/26/2021

Consultant Name: Greenman Pedersen, Inc.

FM Number(s): 446185-1-32-01

FAP No.: N/A

Agreement Description: SR-5/US-1 from Northeast 17th Way to Northeast 33rd Ct.

Purpose of Amendment: Add Funds, Time Extension

The terms of the original agreement referenced above are hereby amended:

The total maximum limiting amount of $1,046,159.18 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $54,886.58. The revised total maximum limiting amount for all services is $1,101,045.76. The services specified in Exhibit “A”, Scope of Services of the original agreement are amended and attached as Exhibit "A".

Section 2.B. of the Standard Professional Services Agreement is revised to extend the time period for completion of basic project services through 5/31/2026.

This amendment extends the services time and adds a total of $54,886.58 to the contract for additional Design Services as stated in the attached scope of services.

Refer to Exhibit “A” pages A-1 through A-4 for a detailed scope of services.

Refer to page A-5 for Revised compensation summary table.

Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.

DocuSign Envelope ID: EA9711BA-9FB9-4BF7-A5FA-61D233E584B3

10/5/2022 | 2:52 PM EDT

District Four Procurement Services Office, 3400 W. Commercial Blvd., Fort Lauderdale, Florida 33309, (954) 777-4603, www.fdot.gov

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

AMENDMENT TO

STANDARD PROFESSIONAL SERVICES AGREEMENT

375-030-97

PROCUREMENT

08/21

IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.

CONSULTANT STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

Greenman Pedersen, Inc.

Name of Consultant

BY: BY:

Name: Name: Steven C. Braun, P.E.

Title: Title: Director of Transportation Development

FOR DEPARTMENT USE ONLY

PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:

Procurement Office Legal Office

Scott Seck

Vice-President

EXHIBIT “A”

SCOPE OF SERVICE

FOR

Financial Project No.: 446185-1-32-01

SR-5/US-1 From Northeast 17th Way to Northeast 33rd Court

DISTRICT FOUR

BROWARD COUNTY

A-1

A-2

INDEX

I. BACKGROUND …………………………….………………….…………….A-3

II. PURPOSE ………….………………………………………………………….A-3

III. SERVICES ……………………………………………………………………A-4

IV. PROVISIONS FOR WORK ………….….……………………….…………A-4

V. GENERAL REQUIREMENTS …………………………………….……….A-4

VI. SUMMARY OF COMPENSATION ………………………….…………….A-4

VII. LENGTH OF SERVICES ………….………………………….…………….A-4

A-3

I. BACKGROUND

The CONSULTANT is retained by the DEPARTMENT to prepare complete construction plans for the resurfacing SR-5 / US-1 from Northeast 17th Way (MP 1.813) to Northeast

33rd Court (MP 4.200).

Based on safety and operations concerns within SR-5 / US-1 (Federal Highway) and

Trader Joe’s driveway opening intersection, FDOT District Four Traffic Operations

Engineer recommends the signalization of the intersection. The signalization of this intersection was discussed and received approval from FDOT District Four Traffic

Operations during FPID: 446185-1-32-01; US-1/SR-5 (Federal Highway) Technical

Project Meeting on June 22, 2022. The signalization of this intersection was presented to the City of Fort Lauderdale during FPID: 446185-1-32-01; US-1/SR-5 (Federal

Highway) Project Meeting on June 23, 2022. City of Fort Lauderdale has agreed to the signalization of SR-5 / US-1 and Trader Joe’s driveway opening Intersection during this meeting.

II. PURPOSE

The scope of services for this project is being amended to provide Design services to develop Concept Plans for the signalization of the intersection of SR-5 / US-1 and Trader

Joe’s driveway opening. The CONSULTANT is responsible for evaluating two (2) signalization options. Option one (1) Signalizing intersection with mast arms. Option two

(2) Signalizing intersection with a diagonal mast arm in the north-east corner of Trader

Joe’s driveway and with a signal pedestal in median for southbound left turn movement.

Signalization options have been presented to FDOT District Four Traffic Operations and received final concurrence through Financial Project No.: 446185-1-32-01; US-1/SR-5

(Federal Highway) Technical Project Meeting on June 22, 2022. The project scope, and schedule have been established based on this Technical Project Meeting and approved.

The proposed improvements will enhance the overall safety and operations of the intersection.

Utility Scope Items:

• Utility Coordination with UAO’s to determine potential conflicts with signal alternatives.

Traffic Operations (Includes Signals) Scope Items:

• Expectations are to complete analysis for signalization layout at the intersection of SR-5 / US-1 and Trader Joe’s driveway opening. Intersection signalization design to be completed within a separate project.

A-4

III. SERVICES

The staff-hour estimates and negotiations for this Supplemental Agreement authorization shall follow the numerical hierarchy found in the newest revision of the standard Staff

Hour Spreadsheet.

A. Roadway Analysis

B. Roadway Plans

C. Utilities

D. Signalization Analysis

E. Signalization Plans

IV. PROVISIONS FOR WORK

The provisions for work shall be as listed in the Original Agreement and any subsequent

Amendments, except as modified herein.

V. GENERAL REQUIREMENTS

The general requirements shall remain as shown in the Original Agreement and any subsequent Amendments, except as modified herein.

VI. SUMMARY OF COMPENSATION

For a summary of compensation for the above services, please refer to the attached

Attachment B.

VII. LENGTH OF SERVICES

The herein requested Agreement shall commence with receipt of written authorization from the Department and shall be completed by such time as will support the

Department’s original project schedule or any subsequent, Department-approved revisions thereto.

446185-1-32-01 Limit /

Estimate Original A#1 A#2 A#3 A#4 Total

Basic Services

LS2 (Lump sum)

Greenman-Pederson, Inc..; Miller Legg & Associates, Inc.; Pevida

Highway Designers, Ritzel-Mason, Inc. LLC.

.% of completion of all services. Limit $650,382.19 $19,973.04 $0.00 $71,383.12 $54,886.58 $796,624.93

SUE, Surveying & Mapping Services

LA4 (Maximum Limiting Amount)

GPI Geospatial, Inc., Ritzel-Mason, Inc.

Defined rates (loaded) for each class/person/unit of work Limit $182,997.52 $9,222.61 $0.00 $36,804.40 $0.00 $229,024.53

Geotechnical Services

LA4 (Maximum Limiting Amount)

Tierra South Florida, Inc.

Defined rates (loaded) for each class/person/unit of work Limit $51,688.88 $5,802.10 $0.00 $17,905.32 $0.00 $75,396.30

TOTAL $885,068.59 $34,997.75 $0.00 $126,092.84 $54,886.58 $1,101,045.76

Grand Total $885,068.59 $34,997.75 $0.00 $126,092.84 $54,886.58 $1,101,045.76