This document is an Amendment to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Horizon Engineering Group, Inc., involving multiple subconsultants including Miller Legg & Associates, Inc., Pevida Highway Designers, Ritzel-Mason, Inc., GPI Geospatial, Inc., and Tierra South Florida, Inc. The amendment pertains to a project for resurfacing State Road 5/US-1 from Northeast 17th Way to Northeast 33rd Court.
The amendment increases the contract value by $34,997.75, bringing the total maximum limiting amount to $920,066.34. It adds Ritzel-Mason, Inc. as a subconsultant to provide Subsurface Utility Engineering (SUE) and survey services, with detailed loaded labor rates specified for various job classifications. The scope of work is expanded to include replacement of a traffic signal mast arm at the intersection of SR-5/US-1 and NE 26th Street, along with additional structural, signalization, and geotechnical design tasks. The amendment maintains the original project schedule and does not modify the fundamental terms of the original agreement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAC18-00010000.pdf | ||
| CN-550000-CAC18-S0020000.pdf | ||
| CN-550000-BEI38-W0090000.pdf | ||
| CN-550000-CAC18-S0040000.pdf | ||
| CN-550000-CAC18-S0050000.pdf | ||
| CN-550000-CAC18-00030000.pdf | ||
| CN-550000-CAC18-S0030000.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
08/21
Amendment Number: 1 Amendment Execution Date:
Original Agreement No.: CAC18 Original Agreement Execution Date: 2/26/2021
Consultant Name: Horizon Engineering Group, Inc.
FM Number(s): 446185-1-32-01
FAP No.: N/A
Agreement Description: SR-5/US-1 from Northeast 17th Way to Northeast 33rd Ct.
Purpose of Amendment: Add Funds, Add Subconsultant
The terms of the original agreement referenced above are hereby amended:
The total maximum limiting amount of $885,068.59 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $34,997.75. The revised total maximum limiting amount for all services is $920,066.34. The services specified in Exhibit “A”, Scope of Services of the original agreement are amended and attached as Exhibit "A".
This Amendment adds $34,997.75 to the contract for services detailed in the attached scope of services.
In accordance with Section 7.A. of the Standard Professional Services Agreement Terms, Ritzel-Mason, Inc. is hereby authorized to perform subconsultant services under this agreement. The subconsultant will be compensated for these services based on the rates provided in Table 6, referenced in this agreement.
No multipliers will be applied to these rates. Payments for services will be based on approved time incurred during the billing period.
Table 6 of Exhibit “B”, Method of Compensation, is updated as follows:
This Amendment adds the subconsultant Ritzel-Mason, Inc., and job classifications to table 6 of the contract to provide Survey and SUE services.
Table 6 ‐ Loaded Labor Rates
* No Multipliers will be added to the following rates.
Consultant Job Class Unit Rate
Ritzel-Mason, Inc. SUR Senior Project Surveyor Hour $148.83
SUR Survey/GIS/SUE Analyst 3 Hour $114.03
2 Person Survey Crew Hour $143.62
2 Person Survey Crew 8hr Day $1,148.96
3 Person Survey Crew Hour $198.68
3 Person Survey Crew 8hr Day $1,589.44
4 Person Survey Crew Hour $258.21
4 Person Survey Crew 8hr Day $2,065.68
2 Person Locating/Designating Crew
Hour $169.66
2 Person Locating/Designating Crew 8hr
Day $1,357.28
DocuSign Envelope ID: FA9D7162-AB46-4001-93F6-2C44B059D8AD
10/4/2021 | 6:11 PM EDT
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
08/21
Table 6 ‐ Loaded Labor Rates
* No Multipliers will be added to the following rates.
Consultant Job Class Unit Rate
3 Person Locating/Designating Crew
Hour $229.19
3 Person Locating/Designating Crew 8hr
Day $1,833.52
Refer to page A-4 for revised compensation summary table.
Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.
CONSULTANT STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
Horizon Engineering Group, Inc.
Name of Consultant
BY: BY:
Name: Name: Steven C. Braun, P.E.
Title: Title: Director of Transportation Development
FOR DEPARTMENT USE ONLY
PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:
Procurement Office Legal Office
Vice-President
Scott Seck
A-1
I. BACKGROUND
The CONSULTANT was retained by the DEPARTMENT to prepare complete construction plans for the resurfacing SR-5 / US-1 from Northeast 17th Way (MP 1.813) to Northeast 33rd Court (MP 4.200).
II. PURPOSE
The scope of services for this project are being amended to add replacement of traffic signal mast arm at the north-east corner of SR-5 / US-1 and NE 26th Street and add
Subsurface Utility Engineering (SUE) services. SUE was omitted from original scope of services as it was not anticipated. Therefore, a subconsultant will be added to complete
SUE required for additional scope. SUE services will be used to reduce / avoid any utility relocations and impacts to the traveling public.
The original project scope identified Structures, Signalization and Geotech design tasks.
The scope of services for this project are being amended to include. Additional
Structures, Signalization and Geotech task due to the addition of new signal mast arm at
SR-5 / US-1 and NE 26th Street intersection.
III. SERVICES
The staff-hour estimates and negotiations for this Supplemental Agreement authorization shall follow the numerical hierarchy found in the newest revision of the standard Staff
Hour Spreadsheet.
A. Roadway Analysis
Roadway Analysis- Tab 4
4.14 Design Variations and Exceptions
B. Structures
Structures Summary- Tab 9
9.11 Field Reviews
9.13 Quality Assurance/Quality Control
9.15 Supervision
9.16 Coordination
Structures-Miscellaneous- Tab 18
18.9 Mast Arms
Mast arm design; long arm; Assume special foundation for non-standard soil.
18.10 Mast Arms Data Table Plan Sheets
C. Signalization
EXHIBIT “A”
SCOPE OF SERVICE
446185-1-32-01
A-2
Signalization Analysis- Tab 21
21.5 Reference and Master Signalization Design File
One Intersection – US-1 and NE 26th Street
21.7 Overhead Street Name Sign Design
One Sign
21.8 Pole Elevation Analysis
One new mast arm.
21.16 Quality Assurance/Quality Control
21.18 Supervision
21.19 Coordination
Signalization Plans- Tab 22
22.3 Plan Sheet
22.6 Guide Sign Worksheet
22.9 Mast Arm/Monotube Tabulation Sheet
D. Survey
Survey- Tab 27
27.10 Underground Utilities
E. Geotech
Geotechnical- Tab 35
35.27 Develop Detailed Boring Location Plan
One mast arm at 25 ft.
35.28 Stake Borings/Utility Clearance
One mast arm at 25 ft.
35.29 Coordinate and Develop MOT Plans for Field Investigation
35.33 Coordination of Field Work
35.34 Soil and Rock Classification - Structures
35.35 Tabulation of Laboratory Data
35.38 Detailed Analysis of Selected Foundation Alternate(s)
35.43 Design Soil Parameters for Signs, Signals, High Mast Lights, and Strain Poles and Geotechnical Recommendations
35.47 Final Reports - Signs, Signals, Box Culvert, Walls and High Mast Lights
Lighting report.
35.48 SPT Boring Drafting
35.53 Quality Assurance/Quality Control
35.54 Supervision
35.55 Coordination
IV. PROVISIONS FOR WORK
The provisions for work shall be as listed in the Original Agreement and any subsequent
Amendments, except as modified herein.
A-3
V. GENERAL REQUIREMENTS
The general requirements shall remain as shown in the Original Agreement and any subsequent Amendments, except as modified herein.
VI. SUMMARY OF COMPENSATION
For a summary of compensation for the above services, please refer to the attached
Attachment A.
VII. LENGTH OF SERVICES
The herein requested Supplemental Agreement shall commence with receipt of written authorization from the Department and shall be completed by such time as will support the Department’s original project schedule or any subsequent, Department-approved revisions thereto.
446185-1-32-01 Limit /
Estimate Original A#1 Total
Basic Services
LS2 (Lump sum)
Horizon Engineering Group, Inc.; Miller Legg & Associates, Inc.; Pevida
Highway Designers, Ritzel-Mason, Inc. LLC.
.% of completion of all services.
Limit $650,382.19 $19,973.04 $670,355.23
SUE, Surveying & Mapping Services
LA4 (Maximum Limiting Amount)
GPI Geospatial, Inc., Ritzel-Mason, Inc.
Defined rates (loaded) for each class/person/unit of work Limit $182,997.52 $9,222.61 $192,220.13
Geotechnical Services
LA4 (Maximum Limiting Amount)
Tierra South Florida, Inc.
Defined rates (loaded) for each class/person/unit of work Limit $51,688.88 $5,802.10 $57,490.98
TOTAL $885,068.59 $34,997.75 $920,066.34
Grand Total $885,068.59 $34,997.75 $920,066.34
Compensation Summary