CN-550000-C9G86-S0050000.pdf

PDF 69 KB Posted

Attached to
Master Agreement FL|C9G86|99595f1eb5a1baa3f85eb6673a4eb109
Contract number
C9G86
Issued by
Florida

About this file

This document is an Amendment (Amendment No. 6) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Metric Engineering, Inc., originally executed on October 13, 2014. The amendment pertains to a design project for State Road 30A (US 98) 15th Street/Tyndall Parkway in Bay County, with the specific purpose of removing Phase 32 residual funds for Financial Project No. 42884413201.

The amendment adjusts the contract compensation by decreasing Survey Services (LA 4) by $30.49 and Plans Update by $646.03, resulting in a total reduction of $676.52. This brings the Total Maximum Limiting Amount for the project to $896,677.48. The original agreement encompasses various services including Basic Services, Environmental Services, Survey Services, Plans Update, and Post Design Services. The contract remains in full force and effect through completion of all services or for a 10-year term from the original execution date, with this amendment representing the sixth modification to the original agreement.

View the file

Other files

File Type Posted
CN-550000-C9G86-S0010000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C9G86-00020000.pdf PDF
CN-550000-C9G86-00040000.pdf PDF
CN-550000-C9G86-S0020000.pdf PDF
CN-550000-C9G86.pdf PDF
CN-550000-C9J81-00120000.pdf PDF
CN-550000-C9G86-00030000.pdf PDF
CN-550000-C9G86-S0030000.pdf PDF
CN-550000-C9G86-S0040000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Florida Department of Transportation

AMENDMENT

TO

STANDARD PROFESSIONAL SERVICES AGREEMENT

Amendment No.: 6 Execution Date:

Original Contract No.: C-9G86 Original Execution Date: October 13, 2014 Consultant Name: Metric Engineering, Inc.

Agreement Description: Design of State Road 30A (US 98) 15th Street/Tyndall Parkway from East of

County Road 2327 to State 30 (US 98B) in Bay County.

Purpose of Amendment: Remove Phase 32 Residual Funds.

This Amendment shall serve to remove phase 32 residual funds on FIN 42884413201.

The terms of the original agreement, referenced above, are hereby amended as follows:

Contract Compensation Summary of Exhibit “B”, Method of Compensation, of the original Agreement is amended as follows:

For Financial Project No. 42884413201, Survey Services (LA 4) is decreased by $30.49 and Plans Update is decreased by $646.03. This total decrease of $676.52 brings the Total Maximum Limiting Amount for this project and said Agreement to $896,677.48.

Compensation is to be paid in accordance with Exhibit B of the original Agreement, except as specified above, and in the Contract Compensation Summary, attached hereto and made a part hereof.

The provisions of this Agreement and any amendments thereto, will remain in full force and effect through completion of all services required of the Consultant or a 10 year term from the original date of execution of this Agreement.

The following attachments are hereby incorporated into this agreement:

Contract Compensation Summary, Page 2

METRIC ENGINEERING, INC. STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

BY: BY:

Jared Perdue, P. E.

(Name)

Director of Transportation Development (Title)

Professional Services Review: Legal Review:

DocuSign Envelope ID: D2D86315-C3F7-4584-A5E4-FB4ABA49E559

Vice President

Amy Wiwi

May 8, 2018

Original Agreement (Executed 10/13/2014; Amendment No.1 (Executed 11/23/2015):

Amendment No. 2 (Executed 2/4/2016); Amendment No. 3 (Executed 5/26/2017):

Amendment No. 4 (Executed 7/20/2017); Amendment No. 5 (Executed 4/16/2018):

Financial Project No. 42884413201 Estimate or

F.A.P. No. 4222 078 P Limit

Basic Services Including Direct Expenses (LS 2) $616,089 Limit

Environmental Services (LS 2) $18,210 Limit

Survey Services (LA 4) $206,664 Limit

Plans Update $37,111 Limit

Post Design Services (LA 4) $19,280 Limit

Total Maximum Limiting Amount $897,354

Amendment No. 6:

Financial Project No. 42884413201 Estimate or

F.A.P. No. 4222 078 P Limit

Basic Services Including Direct Expenses (LS 2) $0.00 Limit

Environmental Services (LS 2) $0.00 Limit

Survey Services (LA 4) -$30.49 Limit

Plans Update -$646.03 Limit

Post Design Services (LA 4) $0.00 Limit

Total Maximum Limiting Amount -$676.52

Original Agreement (Executed10/13/2014); Amendment No. 1 (11/23/2015);

Amendment No. 2 (Executed 2/4/2016); Amendment No. 3 (Executed 5/26/2017);

Amendment No. 4 (Executed 7/20/2017); Amendment No. 5 (Executed 4/16/2018);

Amendment No. 6:

Financial Project No. 42884413201 Estimate or

F.A.P. No. 4222 078 P Limit

Basic Services Including Direct Expenses (LS 2) $616,089.00 Limit

Environmental Services (LS 2) $18,210.00 Limit

Survey Services (LA 4) $206,633.51 Limit

Plans Update $36,464.97 Limit

Post Design Services (LA 4) $19,280.00 Limit

Total Maximum Limiting Amount $896,677.48

Contract Compensation Summary

Contract Compensation Summary

Contract Compensation Summary

DocuSign Envelope ID: D2D86315-C3F7-4584-A5E4-FB4ABA49E559

File details come from the government source that posted it. Updated .