CN-550000-C9G86-S0030000.pdf

PDF 685 KB Posted

Attached to
Master Agreement FL|C9G86|99595f1eb5a1baa3f85eb6673a4eb109
Contract number
C9G86
Issued by
Florida

About this file

This document is an Amendment (No. 4) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Metric Engineering, Inc., executed on July 20, 2017. The original contract, numbered C-9G86, was first established on October 13, 2014, and pertains to the design of State Road 30A (US 98) 15th Street/Tyndall Parkway from East of County Road 2327 to State 30 (US 98B) in Bay County.

The amendment provides additional funds of $27,128 for Plans Update services, bringing the total Plans Update amount to $37,111 and the Total Maximum Limiting Amount for the project to $878,074. The project involves milling and resurfacing SR 30A from east of Transmitter Road, including improvements such as adding sidewalks, minor drainage enhancements, a new left turn lane, new signs, pavement markings, and signalization. The scope of services includes updating plans to reflect current Design Standards, conducting field reviews, revising roadway and signalization plans, updating quantities and pay items, and coordinating with utility owners and right-of-way administration for various project modifications.

View the file

Other files

File Type Posted
CN-550000-C9G86-00020000.pdf PDF
CN-550000-C9G86-00040000.pdf PDF
CN-550000-C9G86-S0020000.pdf PDF
CN-550000-C9G86-S0050000.pdf PDF
CN-550000-C9G86-S0010000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C9G86.pdf PDF
CN-550000-C9J81-00120000.pdf PDF
CN-550000-C9G86-00030000.pdf PDF
CN-550000-C9G86-S0040000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Florida Department of Transportation

AMENDMENT

TO

STANDARD PROFESSIONAL SERVICES AGREEMENT

Amendment No.: 4 Execution Date:

Original Contract No.: C-9G86 Original Execution Date: October 13, 2014 Consultant Name: Metric Engineering, Inc.

Agreement Description: Design of State Road 30A (US 98) 15th Street/Tyndall Parkway from East of

County Road 2327 to State 30 (US 98B) in Bay County.

Purpose of Amendment: Additional Funds for Plans Update

The terms of the original agreement, referenced above, are hereby amended as follows:

This Supplemental Amendment provides compensation to the consultant for additional Plans Update Services. These services are outlined in the Scope of Services, attached hereto and made a part hereof.

For Financial Project No. 42884413201, Plans Update is increased by $27,128 bringing the total for Plans Update to $37,111. This increase brings the Total Maximum Limiting Amount established for this project and said Agreement to $878,074.

Compensation is to be paid in accordance with Exhibit “B” of the original agreement, except as specified above and in Contract Compensation Summary, attached hereto and made a part hereof.

The provisions of said Agreement, and any amendments thereto, shall remain in full force and effect through completion of all services required of the consultant or a ten (10) year term from the date of the execution of said agreement, whichever occurs first.

The following attachments are hereby incorporated into this agreement:

Contract Compensation Summary, Page 2 Scope of Work for Supplemental Services, Page 3-4

METRIC ENGINEERING, INC. STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

BY: BY:

Jared Perdue, P. E.

(Name)

Director of Transportation Development (Title)

Professional Services Review: Legal Review:

DocuSign Envelope ID: 30EE3911-CDD4-43D2-BDF7-B5B989011D86

Original Agreement (Executed 10/13/2014; Amendment No.1( Executed 11/23/2015):

Amendment No. 2 (Executed 2/4/2016); Amendment No. 3 (Executed 5/26/2017):

Financial Project No. 42884413201 Estimate or

F.A.P. No. 4222 078 P Limit

Basic Services Including Direct Expenses (LS 2) $616,089 Limit

Environmental Services (LS 2) $18,210 Limit

Survey Services (LA 4) $206,664 Limit

Plans Update $9,983 Limit

Total Maximum Limiting Amount $850,946

Amendment No. 4;

Financial Project No. 42884413201 Estimate or

F.A.P. No. 4222 078 P Limit

Basic Services Including Direct Expenses (LS 2) $0 Limit

Environmental Services (LS 2) $0 Limit

Survey Services (LA 4) $0 Limit

Plans Update $27,128 Limit

Total Maximum Limiting Amount $27,128

Original Agreement (Executed10/13/2014); Amendment No. 1 (11/23/2015);

Amendment No. 2 (Executed 2/4/2016); Amendment No. 3 (Executed 5/26/2017);

Amendment No. 4:

Financial Project No. 42884413201 Estimate or

F.A.P. No. 4222 078 P Limit

Basic Services Including Direct Expenses (LS 2) $616,089 Limit

Environmental Services (LS 2) $18,210 Limit

Survey Services (LA 4) $206,664 Limit

Plans Update $37,111 Limit

Total Maximum Limiting Amount $878,074

Contract Compensation Summary

Contract Compensation Summary

Contract Compensation Summary

File details come from the government source that posted it. Updated .