CN-550000-C9G86-00030000.pdf
PDF 107 KB Posted
- Contract number
- C9G86
- Issued by
- Florida
About this file
This document is Amendment No. 7 to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Metric Engineering, Inc., originally executed on October 13, 2014. The amendment pertains to a design project for State Road 30A (US 98) in Bay County, specifically the 15th Street/Tyndall Parkway segment from East of County Road 2327 to State 30 (US 98B).
The amendment provides an additional $3,733.00 for Post Design Services (LA 4) for Financial Project No. 42884413201, bringing the total contract amount to $900,410.48. The scope of services includes post-design and construction assistance specifically focused on addressing high groundwater table issues near Lake Drive. Services encompass construction assistance such as responding to requests for information, interpreting construction documents, providing engineering solutions for changed field conditions, revising plans to address underground drainage system and pavement design, and potentially conducting site visits to review construction progress. The amendment maintains the original agreement's terms and will remain in effect through completion of all services or for a 10-year term from the original execution date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9G86-00020000.pdf | ||
| CN-550000-C9G86-00040000.pdf | ||
| CN-550000-C9G86-S0020000.pdf | ||
| CN-550000-C9G86-S0050000.pdf | ||
| CN-550000-C9G86-S0010000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-C9G86-S0030000.pdf | ||
| CN-550000-C9G86-S0040000.pdf | ||
| CN-550000-C9G86.pdf | ||
| CN-550000-C9J81-00120000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Florida Department of Transportation
AMENDMENT
TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
Amendment No.: 7 Execution Date:
Original Contract No.: C-9G86 Original Execution Date: October 13, 2014 Consultant Name: Metric Engineering, Inc.
Agreement Description: Design of State Road 30A (US 98) 15th Street/Tyndall Parkway from East of
County Road 2327 to State 30 (US 98B) in Bay County.
Purpose of Amendment: Additional Post Design Services
This Supplemental Amendment provides compensation to the Consultant for additional Post Design Services on Financial Project No. 42884413201. These services shall include, but are not limited to Plans Revisions and Construction Assistance. For Details see “Scope of Services for Post Design Services” attached hereto and made a part hereof.
The terms of the original agreement, referenced above, are hereby amended as follows:
The Contract Compensation Summary of Exhibit “B”, Method of Compensation, of the original Agreement is amended as follows:
For Financial Project No. 42884413201, $3,733.00 is added to Post Design Services (LA 4) bringing the total amount established for this project and said Agreement to $900,410.48.
Compensation is to be paid in accordance with Exhibit B of the original Agreement, except as specified above, and in the Contract Compensation Summary, attached hereto and made a part hereof.
The provisions of this Agreement and any amendments thereto, will remain in full force and effect through completion of all services required of the Consultant or a 10 year term from the original date of execution of this Agreement.
The following attachments are hereby incorporated into this agreement:
Contract Compensation Summary, Page 2 Scope of Services for Post Design Services, Page 3
METRIC ENGINEERING, INC. STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
BY: BY:
Jared Perdue, P. E.
(Name)
Director of Transportation Development (Title)
Professional Services Review: Legal Review:
DocuSign Envelope ID: B6273505-CF79-46A6-B92D-BDAD74529286
Vice President
Amy Wiwi
June 11, 2019
Original Agreement (Executed 10/13/2014; Amendment No.1 (Executed 11/23/2015):
Amendment No. 2 (Executed 2/4/2016); Amendment No. 3 (Executed 5/26/2017):
Amendment No. 4 (Executed 7/20/2017); Amendment No. 5 (Executed 4/16/2018);
Amendment No. 6 (Executed 5/8/2018):
Financial Project No. 42884413201 Estimate or
F.A.P. No. 4222 078 P Limit
Basic Services Including Direct Expenses (LS 2) $616,089.00 Limit
Environmental Services (LS 2) $18,210.00 Limit
Survey Services (LA 4) $206,633.51 Limit
Plans Update $36,464.97 Limit
Post Design Services (LA 4) $19,280.00 Limit
Total Maximum Limiting Amount $896,677.48
Amendment No. 7:
Financial Project No. 42884413201 Estimate or
F.A.P. No. 4222 078 P Limit
Basic Services Including Direct Expenses (LS 2) $0.00 Limit
Environmental Services (LS 2) $0.00 Limit
Survey Services (LA 4) $0.00 Limit
Plans Update $0.00 Limit
Post Design Services (LA 4) $3,733.00 Limit
Total Maximum Limiting Amount $3,733.00
Original Agreement (Executed10/13/2014); Amendment No. 1 (11/23/2015);
Amendment No. 2 (Executed 2/4/2016); Amendment No. 3 (Executed 5/26/2017);
Amendment No. 4 (Executed 7/20/2017); Amendment No. 5 (Executed 4/16/2018);
Amendment No. 6 (Executed 5/8/2018); Amendment No. 7:
Financial Project No. 42884413201 Estimate or
F.A.P. No. 4222 078 P Limit
Basic Services Including Direct Expenses (LS 2) $616,089.00 Limit
Environmental Services (LS 2) $18,210.00 Limit
Survey Services (LA 4) $206,633.51 Limit
Plans Update $36,464.97 Limit
Post Design Services (LA 4) $23,013.00 Limit
Total Maximum Limiting Amount $900,410.48
Contract Compensation Summary
Contract Compensation Summary
Contract Compensation Summary
DocuSign Envelope ID: B6273505-CF79-46A6-B92D-BDAD74529286
DocuSign Envelope ID: B6273505-CF79-46A6-B92D-BDAD74529286
File details come from the government source that posted it. Updated .