This document is a Railroad Change Order No. 2 issued by the Florida Department of Transportation (FDOT) for a project involving CSX Transportation Company. The change order pertains to a railroad crossing improvement project on State Road 60 in Hillsborough County, with Financial Project Number 441661-1-57-01. The project is federally funded through the Federal Highway Administration (FHWA) and involves a Supplemental Agreement to a previous Railroad Reimbursement Agreement originally dated 02/13/1980.
The change order authorizes construction, construction engineering and inspection (CEI), and flagging services for a resurfacing project at Crossing #624572B, with a total estimated cost of $52,254.00. The work is reimbursable under the Force Account Method, with 100% funding from the agency. The project includes sidewalk installation at the crossing within the CSX right-of-way and roadway resurfacing adjacent to the railroad right-of-way. The work is subject to Buy America requirements, mandating that all steel and iron manufacturing processes occur in the United States. The contract is set to run from 11/15/2021 to 12/31/2050, with the current change order adding $22,254.00 to the existing authorized budget.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASQ73-00010000.pdf | ||
| CN-550000-ASQ73-W0010000.pdf | ||
| CN-550000-CA324-00120000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 2
725-090-04B
RAIL
OGC – 1/21
Financial Project Number Road Name or Number County Name Parcel & R/W
Number
FAP
Number
441661-1-57-01 SR 60 HILLSBOROUGH 10110-2102 D723 014
A. 1. The CSX Transportation Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Construction, CEI & Flagging Services for a resurfacing project. This includes any other work deemed necessary for this project.
Crossing # 624572B - RRPM: SV828.91
Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original Railroad Agreement.
The items of work covered by this Change Order are referenced to a Agreement of record dated 02/13/1980
Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. ATTACHED
b. X INCLUDED IN THE HIGHWAY CONTRACT PLANS
Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
NONREIMBURSABLE – Section .011(2) X REIMBURSABLE – Section .011(2) X Force Account Method
Lump Sum Method Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
1 Construction, CEI & Flagging 30,000.00 1 52,254.00
Sub-Totals ………………………………………………………………… $30,000.00 $52,254.00 Net Cost of Construction Changes, this order ………………………... $ $22,254.00 Cost of Construction Changes, previously ordered ………………….. $ $30,000.00 Net Total Cost of Construction Changes, to date…………………………………………….. $52,254.00 Contract Amount ………………………………………………………………………………… $ Estimated Cost of Work Authorized, to date………………………………………………….. $52,254.00
Examined as to provisions and participating items of cost:
Recommended: Approved: Approved:
Date Date Date
District Rail Administrator Kenneth Madden
Director of Transportation Development
Justin Hall
Division Administrator N/A
Federal Highway Administration
725-090-04B
RAIL
OGC – 1/21
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC – 1/21
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
OGC – 1/21
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASQ73
3/27/2023
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 3/27/2023
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55074010706
Expansion Option: A5
Object Code: 563000
Amount: $22,254.00
Financial Project: 44166115701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2023
Budget Entity: 55150200
Category/Category Year: 088716/23
Amendment ID: W002
Sequence: 00
User Assigned ID: CO#2
Enc Line (6s)/Status: 0002/04
Total Amount: $22,254.00
Contract: ASQ73
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 11/15/2021
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: PE & Flagging Services for Resurfacing Project
Page1 of 1
To: David.Grillo@dot.state.fl.us
ACCT. CODE : 709 - FL2895 Form Revision 12/22/21
BUY AMERICA
ESTIMATE SUBJECT TO REVISION AFTER: 3/8/2024 DOT NO.: 624572B
CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Plant City MILE POST: SV 828.91
AGENCY PROJECT NUMBER: FDOT 441661-1-57-01 (ASQ73)
PRELIMINARY ENGINEERING:
212 Contracted & Administrative Engineering Services 16,700$
Subtotal 16,700$
CONSTRUCTION ENGINEERING/INSPECTION:
212 Contracted & Administrative Engineering Services 17,700$
Subtotal 17,700$
FLAGGING SERVICE: (Contract Labor)
70 Labor (Conductor-Flagman) 0 Days @ 350.00$ -$
50 Labor (Foreman/Inspector) 10 Days @ 504.00$ 5,040$
70 Additive 137.00% (Transportation Department) -$ 50 Additive 160.00% (Engineering Department) 8,064$
Subtotal 13,104$
SIGNAL & COMMUNICATIONS WORK: -$
TRACK WORK: -$
PROJECT SUBTOTAL: 47,504$
900 CONTINGENCIES: 10.00% 4,750$
PROJECT TOTAL: ***************************************************** 52,254$
CURRENT AUTHORIZED BUDGET: ***************************************************** 30,000$ TOTAL SUPPLEMENT REQUESTED: ***************************************************** 22,254$
DIVISION OF COST:
Agency 100.00% 22,254$ Railroad 0.00% -$
NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.
Office of Chief Engineer Public Projects--Jacksonville, Florida
Benesch - CDS Approved by: KSW CSXT Public Project Group
DATE: 03/09/23 REVISED: 01/00/00 DATE: 03/16/23
Estimated prepared by:
This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work
Plant City DESCRIPTION: SR 60: Preliminary Engineering, Construction Engineering & Inspection, and Flagging covering sidewalk installation at crossing and within the CSXT ROW, and roadway resurfacing adjacent to the CSXT ROW by FDOT.