CN-550000-ASQ73-W0010000.pdf
PDF 1 MB Posted
- Contract number
- ASQ73
- Issued by
- Florida
About this file
This document is a Railroad Change Order No. 1 between the State of Florida Department of Transportation and CSX Transportation, Inc., referencing a Master Agreement originally dated September 15, 1998. The change order pertains to a project located in Hillsborough County, specifically involving State Road 60 and a railroad crossing (Crossing #624572B). The agreement is federally funded through the Advance Construction - National Highway Performance Resurfacing program.
The change order authorizes CSX Transportation to perform Preliminary Engineering and Flagging Services for a resurfacing project, with an estimated cost of $30,000.00. The work is reimbursable under Administrative Rule Chapter 14-57 and will be performed as part of a force account method. The project has a beginning date of November 15, 2021, and an end date of December 31, 2050. The contract includes provisions for Buy America requirements, E-Verify employment eligibility verification, and compliance with Title VI nondiscrimination assurances. Funding is approved for fiscal year 2022, with the work to be completed under the oversight of the Florida Department of Transportation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CA324-00120000.pdf | ||
| CN-550000-ASQ73-00010000.pdf | ||
| CN-550000-ASQ73-W0020000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
725-090-04B
RAIL
OGC 1/21
Financial Project Number Road Name or Number County Name Parcel & R/W
Number
FAP
Number
441661-1-57-01 SR 60 HILLSBOROUGH 10110-2102 N/A
A. 1. The CSX Transportation Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Preliminary Engineering & Flagging Services for a resurfacing project. This includes any other work deemed necessary for this project.
Crossing # 624572B - RRPM: 828.91
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated 09/15/1998 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. ATTACHED
b. X INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in
Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE Section .011(2)
b. X REIMBURSABLE Section .011(2)
(1) X
(2) Force Account Method
(3) Lump Sum Method
(4) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
1 PE & Flagging 1 30,000.00
Sub-Totals $ $30,000.00 Net Cost of Construction Changes $ $30,000.00 Co $ $
. $30,000.00 $30,000.00
Examined as to provisions and participating items of cost:
Recommended: Approved: Approved:
Date
District Rail Administrator
Kenneth Madden Director of Transportation
Development Richard Moss
Division Administrator N/A
Federal Highway Administration
725-090-04B
RAIL
OGC 1/21
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Securi E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC 1/21
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications delivery date.
OGC 1/21
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASQ73
11/17/2021
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 11/17/2021
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55074010706
Expansion Option: A5
Object Code: 563000
Amount: $30,000.00
Financial Project: 44166115701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2022
Budget Entity: 55150200
Category/Category Year: 088716/22
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $30,000.00
Contract: ASQ73
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 11/15/2021
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: PE & Flagging Services for Resurfacing Project
Page1 of 1
To: David.Grillo@dot.state.fl.us
If ther please describe here:
Not Applicable _____ Florida Single Audit _____ CSX is not subject to the Single Audit.
Federal Audit _____ (Florida Statute 215.97)
Single Audit Status ¹ ² :
CSFA # ³
5) Agency
*Phone:
Date:
Recipient. The Federal Sub-Recipient and Vendor Determination Checklist is enclosed for reference.
² CFDA Number: If CSX is subject to the Federal Single Audit, please provide the Catalog of Federal Domestic Assistance (CFDA) number.
³ CSFA Number: If CSX is subject to the Florida Single Audit, please provide the Catalog of State Financial Assistance (CSFA) number.
*Please Note: Per 2 CFR 200.425(a), CSXT can recover Federal Audit costs directly through this project.
For Audit related questions, contact GBCompliance@csx.com.
*4) Single Audit Type: Please advise if the project is subject to single audit requirements by completing the appropriate box below (complete only one box).
CSX TRANSPORTATION – GOVERNMENT BILLING DEPT
NEW PROJECT FORM
To ensure compliance with Federal requirements, please provide the following information so that CSXT may accurately and appropriately setup and handle the necessary accounting associated with the proposed project.
*1) Is the project Federally Funded?
*2) Funding Source: If the project is funded by multiple sources please provide the approximate anticipated percentage of the total project cost to be paid by each source.
*3) Project Requirements
Note: This audit is not related to the project specific audit performed by your agency.
Vendor (CFDA # Not Required)
Recipient (CFDA # )
Sub-Recipient (CFDA # )
Signature of Applicant:
Signature of Applicant Please sign, print , and e-mail this form to the authorized CSX representative
*Legal Address (1):
*Name: Federal Award #:
Date of Award:
Page of
File details come from the government source that posted it. Updated .