This document is a Task Assignment Change Order (Change Order No. 2) for DEP Contract No. WM946 between the Florida Department of Environmental Protection (FDEP) and URS Corporation (aka AECOM), a wholly-owned subsidiary serving as the contractor. The change order modifies Task Assignment 12 for the "Statewide Onsite Wastewater Study Phase II Sites" project. Additional parties include Huss Drilling, Inc. as a subcontractor drilling specialist, and the Florida Onsite Wastewater Association (FOWA) which facilitated access to six biosolids land application sites across central Florida. The change order was issued on October 15, 2015, with a DEP Contract Manager (James Dodson) and Contractor Contract Manager (Jeff Wagner) identified for oversight.
The change order authorizes additional work to install 24 monitoring wells (four per site) at six separate biosolids land application sites to assess potential nutrient impacts through groundwater monitoring. Services include site preparation, health and safety plan revisions, drilling and well construction oversight, top-of-casing surveys, groundwater sampling and analysis, and comprehensive reporting. The original task amount was $110,068.00; the change order increases costs by $12,052.04, bringing the cumulative task total to $165,620.10. Funding is allocated from organizational code 37306020000 with effective dates from October 31, 2015, extended one month to November 30, 2015. The work is scoped for approximately 25 field days and will be conducted on a fixed-price basis in accordance with the existing WM946 contract terms dated October 3, 2008.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .