This is a Task Assignment Change Order Form (Change Order No. 1) for DEP Contract No. WM946, a statewide onsite wastewater study administered between the Florida Department of Environmental Protection (FDEP) and URS Corporation (FEIN 59-2087895). The project, titled "Statewide Onsite Wastewater Study," is managed by James Dodson at FDEP and Jeff Wagner at URS Corporation. The change order reflects modifications to the original task assignment WM946-10 due to scope adjustments including the subtraction of one site, additional utility clearance costs at another site, and additional drilling costs at a third site, resulting in an overall increase to project costs.
The original task amount of $190,440.00 has been increased by $28,851.43 to a revised total of $219,291.43, with the completion date remaining December 17, 2015. The project scope encompasses four primary sub-tasks: preparation of a site-specific health and safety plan (HASP) with literature review and site reconnaissance; monitoring well installation at six biosolids application sites across central Florida involving subcontracted drilling services; top-of-casing surveys and groundwater sampling from 24 monitoring wells; and final reporting with field activity documentation. The work includes drilling oversight, well construction, groundwater sampling in accordance with FDEP quality assurance procedures, and production of completion reports and potentiometric surface maps. Funding is sourced through organizational code I370020000, with the allocation documented in the project budget table provided in the change order attachment.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .