CN-370000-SP469-T65-2.43.pdf
PDF 79 KB Posted
- Contract number
- SP469
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form for DEP Contract No. SP469 dated May 28, 2014, establishing a task order between the Florida Department of Environmental Protection (FDEP) and AMEC Environment & Infrastructure, Inc. The contract involves the installation and monitoring of staff gage equipment on herbaceous and forested wetlands associated with a five-party Memorandum of Understanding that FDEP entered into in 1995. The work is part of the Chicora Tract mitigation development project on the South Prong of the Alafia River in Polk County, Florida, with David Butcher serving as the contractor representative and Dena Vani Landingham as the FDEP contract manager.
The task assignment, identified as Task Assignment Number 65(2,43), requires AMEC to provide flow instrumentation and monitoring services for the South Prong of Alafia River Mitigation Project. The scope of work includes installing hydrologic monitoring instrumentation with a staff gauge equipped with continuous-recording pressure transducer levelogger near the stream exit boundary, conducting streamflow measurements at various flow regimes, and post-processing logger data to establish a stage-discharge rating curve. The contractor will conduct approximately 10 streamflow events with monthly site visits. Deliverables include an Excel spreadsheet with post-processed logger data and stage-discharge rating curve, plus a memo describing data collection efforts and results. The fixed-price task assignment is valued at $14,566 with a completion date of December 20, 2014, funded from Organizational Code 37357010000 under Object Code 131500 and Special Category 084205.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .