This is a Task Assignment Notification Form for Contract HW551, issued by the Florida Department of Environmental Protection (FDEP) to AECOM Technical Services, Inc. (AECOM) for groundwater monitoring services at the No Spot Cleaners facility located at 716 N Federal Highway, Hallandale, Broward County, Florida (DEP Site #ERIC_4066). The task assignment was executed on April 2, 2020, and is managed by Billy Hessman, FDEP Contract Manager, with Mark Rasberry and Jennifer L Joyal representing AECOM as the contractor.

The task assignment encompasses three subtasks for conducting groundwater monitoring activities: Project Management (12.5% of direct labor costs), 2020 Annual Natural Attenuation Monitoring (NAM) groundwater sampling from 11 monitoring wells with laboratory analysis for volatile organic halocarbons via EPA Method 8260 and Total Organic Carbon testing, and GIS/ADaPT data file updates. The total task assignment value is $7,292.63, structured as a fixed price contract with zero retainage. The final deliverable, a Groundwater Monitoring Report, is due August 7, 2020, with task completion scheduled for October 30, 2020. Invoice payment of the full $7,292.63 is contingent upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report.

View the file

Other files

File Type Posted
CN-370000-HW551 (1).pdf PDF
CN-370000-HW551-A2.pdf PDF
CN-370000-HW551-A8.pdf PDF
CN-370000-HW551-CO3.pdf PDF
CN-370000-HW551-CO4.pdf PDF
CN-370000-HW551-DC001G.pdf PDF
CN-370000-HW551-DC003E.pdf PDF
CN-370000-HW551-DC004L.pdf PDF
CN-370000-HW551-DC008F.pdf PDF
CN-370000-HW551-DC010J.pdf PDF
CN-370000-HW551-DC018L.pdf PDF
CN-370000-HW551-DC018M.pdf PDF
CN-370000-HW551-DC01ACO5.pdf PDF
CN-370000-HW551-DC01ACO9.pdf PDF
CN-370000-HW551-DC01C.pdf PDF
CN-370000-HW551-DC01E.pdf PDF
CN-370000-HW551-DC024B.pdf PDF
CN-370000-HW551-DC024E.pdf PDF
CN-370000-HW551-DC02G-1.pdf PDF
CN-370000-HW551-DC02JCO2.pdf PDF
CN-370000-HW551-DC031B.pdf PDF
CN-370000-HW551-DC032B.pdf PDF
CN-370000-HW551-DC03C.pdf PDF
CN-370000-HW551-DC03CCO1.pdf PDF
CN-370000-HW551-DC03CCO2.pdf PDF
CN-370000-HW551-DC03ECO1.pdf PDF
CN-370000-HW551-DC03F.pdf PDF
CN-370000-HW551-DC04D.pdf PDF
CN-370000-HW551-DC04E.pdf PDF
CN-370000-HW551-DC04ECO1.pdf PDF
CN-370000-HW551-DC04G.pdf PDF
CN-370000-HW551-DC04H.pdf PDF
CN-370000-HW551-DC04HCO4.pdf PDF
CN-370000-HW551-DC04JCO1.pdf PDF
CN-370000-HW551-DC04MCO1.pdf PDF
CN-370000-HW551-DC04MCO2.pdf PDF
CN-370000-HW551-DC05BCO1.pdf PDF
CN-370000-HW551-DC05ECO4.pdf PDF
CN-370000-HW551-DC05ECO5.pdf PDF
CN-370000-HW551-DC05ECO6.pdf PDF
CN-370000-HW551-DC05F.pdf PDF
CN-370000-HW551-DC06CCO1.pdf PDF
CN-370000-HW551-DC06DCO1.pdf PDF
CN-370000-HW551-DC07C.pdf PDF
CN-370000-HW551-DC07E.pdf PDF
CN-370000-HW551-DC07ECO7.pdf PDF
CN-370000-HW551-DC07GCO1.pdf PDF
CN-370000-HW551-DC07GCO2.pdf PDF
CN-370000-HW551-DC07iCO1.pdf PDF
CN-370000-HW551-DC08DCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW551

D000 NADC007H

AECOM Technical Services, Inc. (AECOM)

Mark Rasberry

850-245-8972Billy Hessman

ERIC_4066

No Spot Cleaners Inc

716 N Federal Hwy, Hallandale, Broward

Monitoring

AECOM will conduct groundwater sampling in accordance with the April 2020 scope of work and cost proposal.

Groundwater Monitoring Report will be generated.

Groundwater Monitoring Report

08/07/2020

10/30/2020

$ 7,292.63 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2020.04.02 14:10:30 -04'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2020.04.02 14:10:39 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.04.02 15:13:38 -04'00'

Digitally signed by Jennifer L Joyal DN: cn=Jennifer L Joyal, c=US, o=AECOM TECHNICAL SERVICES INC., ou=A01410D0000016EFFB91728000287DE, email=jennifer.bass@aecom.com Date: 2020.04.06 08:34:48 -05'00'

Jennifer L Joyal

$ 7,292.63

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 08/07/2020

Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 7,292.63

$ 7,292.63

HW551

DC007H

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW551 Contract File No Spot Cleaners Inc.

ERIC_4066

FROM: Billy Hessman, Contract Manager

DATE: April 2, 2020

SUBJECT: Task Assignment Summary

HW551 DC007H

Groundwater Monitoring

This Task Assignment is for AECOM to conduct groundwater sampling. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Sampling Groundwater sampling will be conducted at 11 monitoring wells. All samples will be analyzed for the presence of VOHs by EPA Method 8260. Following receipt of analytical data, a Groundwater Monitoring Report will be prepared and submitted to FDEP. Report will include field notes, sampling logs, lab report, and recommendations.

Subtask 3: GIS Update Subtask 3 includes labor hours for AECOM to generate and submit updated GIS/ADaPT data files.

This work will be conducted in line with the scope of work included in the GHD proposal, received April 2, 2020.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is August 7, 2020 and the completion date for the task assignment is October 30, 2020.

The final cost total for Task Assignment DC007H is $7,292.63.

FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.

Date: 2-Apr-20

Task #: HW551 DC007H SubTask 1 Project Management SubTask 6

Site: No Spot Cleaners SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: Annual NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.30 Project Manager (Rasberry) 3.8 3.8 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$56.30 Sr. Geologist (Rasberry) 17.0 15.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$34.50 CAD Designer (Barron) 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $26.00 Field Technician (Slater) 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $19.96 Field Technician (Parsotan) 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total Hours 49.8 3.8 44.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Direct Labor $1,914.29 $212.70 $1,588.99 $112.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 38.57% $738.34 $82.04 $612.87 $43.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $2,337.92 $259.77 $1,940.63 $137.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,990.55 $554.51 $4,142.49 $293.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $95.72 $10.64 $79.45 $5.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 04/10 CEF AECOM Page 1

FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.

Date: 2-Apr-20

Task #: HW551 DC007H SubTask 1 Project Management SubTask 6

Site: No Spot Cleaners SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: Annual NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $910.00 $910.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $973.00 $973.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $417.10 $417.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $540.30 $540.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,793.57 $565.15 $5,929.24 $299.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $499.06 $55.45 $414.25 $29.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,292.63 $620.60 $6,343.49 $328.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 04/10 CEF AECOM Page 2

SITE : No Spot SUBTASK: 2 2020 Annual NAM

DATE: 4/2/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Geologist 2020 Annual Sampling 15 (Rasberry) Order/ receive & inspect sample containers

Prepare field request Coordinate with owners Review field data documentation Update Tables Prepare NAM Report Cordinate IDW disposal Sign and Seal Report

Sr. Engineer 2020 Annual Sampling 1 (Joyal) Review NAM Report

Field Technician 2020 Annual Sampling 12 (Slater) Collect Water Level Measurements (12 MWs)

Calibrate equipment Collect GW samples from 11 MWs Collect one duplicate QC sample Collect one IDW sample for characterization Preparation of Chain-of-Custody Stage IDW Pack the samples Travel/ Mob/ Demob

Field Technician 2020 Annual Sampling 12 (Parsotan) Collect Water Level Measurements (12 MWs)

Calibrate equipment Collect GW samples from 11 MWs Collect one IDW sample for characterization Preparation of Chain-of-Custody Deliver samples for shipping Travel/ Mob/ Demob

CAD Designer 2020 Annual Sampling 3 (Barron) Update Figures

Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo)

TOTAL LABOR 44

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck 1 day x 2 $97.00 day 2 $194.00 subtotal $194.00

TOTAL TRAVEL $194.00

SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

subtotal $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\No Spot\DC007H 2020 NAM_project number\000-Pre-Contract\040 Proposal\ No Spot 2020 NAM LOE.xlsx Page 1 of 3

SUBTASK: 2 2020 Annual NAM

DATE: 4/2/2020

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

IDW

TBD IDW Disposal $0.00 drum 0 $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QA/QC TOTALS

Analytical Costs (Fixed Lab) VOH - 8260 (11 wells + 1 IDW + 1 duplicate) 66.00$ 12 1 $858.00 TOC (2 samples) 26.00$ 2 0 $52.00 subtotal $910.00 Analytical Costs (Fixed Lab) Shipping (small cooler overnight) 63.00$ 1 $63.00 subtotal $63.00

TOTAL LABORATORY $973.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Expendables Expendables 1 day x 2 $32.50 day 2 $65.00 subtotal $65.00 IDW Related Drum $58.20 each 1 $58.20 subtotal $58.20 Other Shallow GW Sampling kit 1 day x 2 $208.55 day 2 $417.10 subtotal $417.10

TOTAL FIELD EXPENSES $540.30

P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\No Spot\DC007H 2020 NAM_project number\000-Pre-Contract\040 Proposal\ No Spot 2020 NAM LOE.xlsx Page 2 of 3

SUBTASK: 3 GIS

DATE: 4/2/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Geologist Prepare & Submit GIS Data Tables 2 (Rasberry) 12 samples @ 8 min = 96 min (11 MW, 1 Duplicate)

1 WLs @ 5 min = 5 min Total: 101 min

Rename & Submit ADaPT Data Report & Error Logs

TOTAL LABOR 2

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental subtotal $0.00

Mileage Costs subtotal $0.00

Air Fare subtotal $0.00

Per Diem + Hotel subtotal $0.00 subtotal $0.00

SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) subtotal $0.00 Drilling (Non-Conventional) subtotal $0.00 Mobile Laboratory subtotal $0.00 Surveying subtotal $0.00

IDW

subtotal $0.00 Other subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\No Spot\DC007H 2020 NAM_project number\000-Pre-Contract\040 Proposal\ No Spot 2020 NAM LOE.xlsx Page 3 of 3

AECOM

150 N Orange Ave.

Orlando, Florida 32801 www.aecom.com

407 843 6552 tel 407 839 1789 fax

April 2, 2020

Mr. Billie Hessman State of Florida Department of Environmental Protection Bureau of Waste Cleanup, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: 2020 Annual Natural Attenuation Monitoring (NAM) Proposal No Spot Cleaners 716 N Federal Highway, Hallandale, Florida Facility ID # ERIC_4066 Proposed Task Assignment DC007H

Dear Mr. Hessman:

AECOM is pleased to submit this Scope of Services and the Level of Effort/Cost Estimate (LOE/CEF) forms to perform an annual Natural Attenuation Monitoring (NAM) groundwater sampling event at the above referenced site. The last groundwater sampling event for natural attenuation monitoring (NAM) was conducted on January 29, 2019.

TASK 1 Project Management

Project management is calculated at 12.5 percent of the direct labor and includes associated fringe, overhead, ODC and completion fees.

TASK 2 2020 Annual NAM Groundwater Sampling

Based on recommendations in the March 6, 2019 NAM report and July 10, 2019 review, AECOM proposes to collect groundwater samples from 11 existing groundwater monitoring wells for evidence of natural attenuation. Monitoring wells will be sampled for volatile organic halocarbons (VOHs) via EPA Method 8260, Total Organic Carbon (TOC) from two wells, and field screened for other NAM parameters according to the following table:

Sample Location (screen interval) VOHs TOC

Field Screening (Temp, pH, SpC, redox, DO, turbidity)

MW002 (14-20 ft bls) X X MW003R (24-30 ft bls) X X MW006 (14-20 ft bls) X X X MW007 (14-20 ft bls) X X MW009R (15-20 ft bls) X X X

No Spot Cleaners, 2020 Annual NAM Proposal April 2, 2020 Page 2

Sample Location (screen interval) VOHs TOC

Field Screening (Temp, pH, SpC, redox, DO, turbidity)

MW010 (14-20 ft bls) X X MW012 (2-12 ft bls) X X MW013 (40-50 ft bls) X X MW015 (2-12 ft bls) X X MW016 (15-20 ft bls) X X MW017 (40-50 ft bls) X X

Sampling will be conducted in accordance with DEP-SOP-002/01 FS 2200, and a duplicate sample will be collected from MW002 for QA/QC purposes. Water levels will be measured in the sampled wells to evaluate groundwater flow patterns. A water level will also be collected in MW011 (45-50 ft bls) for deep zone flow contour map generation. See Attachment 1 for Figure 2 from the 2019 NAM Report indicating the well locations and previous sampling results. Well purge water will be temporarily stored on-site in a 55-gallon drum. An IDW sample will be collected for disposal characterization. No IDW disposal costs are included in this proposal;

however, they can be added later, as needed, by a Task Assignment Change Order (TACO).

AECOM will prepare a NAM Report documenting the results of the annual sampling event.

TASK 3 GIS & ADaPT Deliverables

AECOM will update the GIS data tables to include all annual NAM analytical, field screening and water level gauging data. The laboratory ADaPT electronic files will also be submitted for this subtask. AECOM proposes the following invoice and deliverable schedule:

Subtask Cost Estimate

Deliverable Date

1 – Project Management $620.60 NA 2 – Annual NAM Sampling & Report $6343.49 60 days after tasking 3 – GIS & ADaPT $328.54 60 days after tasking

TOTAL / TA End Date $7,292.63 90 days after tasking

The LOE/CEFs are provided as Attachment 2. Should you have any questions, or require additional information please contact me directly at (407) 513-8241, or via email at mark.rasberry@aecom.com.

Sincerely, AECOM Technical Services, Inc.

Mark Rasberry, PG Jennifer Joyal, PE Project Manager Associate Vice President

Enclosures:

Attachment 1 – Figure 2: January 2019 Analytical Results Attachment 2 – LOE/CEF

@A @A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@B @A@A

Ea

Ea

Ea Ea

Ea

@A

MW012

MW015

MW001

MW002

MW006

MW007

MW008

MW009R

MW010

MW016

MW004

MW003R

MW011

MW013

MW014

MW017

MW005

IW003

IW004

IW005

IW002

IW001

FIGURE

2NO SPOT CLEANERS

716 NORTH FEDERAL HWY.

HALLANDALE, FLORIDA

FDEP FACILITY ID#: 069500340

GROUNDWATER ANALYTICAL RESULTS

Legend

@A Water Table Monitoring Well (2'-12')

@A Shallow Monitoring Well (14' to 20') (15'-20')

@A Intermediate Monitoring Well (24' to 30') (28' to 34')

@A Deep Monitoring Well (40' to 50') (45' to 50')

@B Destroyed Monitoring Well

Ea Injection Well (3' to 30') (16' to 30')

Estimated Extent of Contamination (14'-20' BLS)

Estimated Extent of Contamination (24'-30' BLS)

Estimated Extent of Contamination (40'-50' BLS)

* = Duplicate Sample

MW010

14-20 ft blsPOINT ID

SCREENED INTERVAL

Sources: Florida Department of Revenue Aerial source, FDOT, 2015

0 50 100 Feet

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) MW001 14 - 20 6-Dec-16 0.50 U 0.61 U 0.67 U 0.65 U 0.71 U

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) IW005 16 to 30 06-Dec-16 0.50 U 0.61 U 0.67 U 0.65 U 0.71 U

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) IW002 3 to 30 06-Dec-16 0.50 U 0.61 U 0.67 U 0.79 I 0.71 U

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) MW004 24 - 30 6-Dec-16 0.50 U 0.61 U 0.67 U 0.65 U 0.71 U

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) MW011 45 - 50 05-Dec-16 0.50 U 0.61 U 0.67 U 0.65 U 0.71 U

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) MW008 14 - 20 5-Dec-16 0.50 U 0.61 U 0.67 U 0.65 U 0.71 U

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 24-Jan-18 4.8 0.90 I 0.39 U 0.32 U 0.26 U 29-Jan-19 4.8 0.84 I 0.39 U 1.4 0.26 U 29-Jan-19* 5.1 0.90 I 0.39 U 1.4 0.26 U

14 - 20MW002

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 6-Dec-16 0.50 U 0.61 U 0.67 U 2.9 10 24-Jan-18 0.50 U 0.61 U 0.39 U 0.32 U 0.99 I 29-Jan-19 0.50 U 0.61 U 0.39 U 12 21

24 - 30MW003R

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 5-Dec-16 0.50 U 0.61 U 1.4 0.84 I 94 24-Jan-18 0.50 U 0.61 U 0.39 U 0.42 I 24 29-Jan-19 0.50 U 0.61 U 0.39 U 0.63 I 41

14 - 20MW006

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 5-Dec-16 0.50 U 0.61 U 0.67 U 3.5 4.8 29-Jan-19 0.50 U 0.61 U 0.39 U 9.9 1214 - 20MW007

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 5-Dec-16 0.50 U 0.61 U 0.67 U 1.8 13 29-Jan-19 0.50 U 0.61 U 0.39 U 1.3 1115 - 20MW009R

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 5-Dec-16 0.50 U 0.61 U 0.67 U 1.1 13 23-Jan-18 0.50 U 0.61 U 0.39 U 0.68 I 8

23-Jan-18 * 0.50 U 0.61 U 0.39 U 0.69 I 7.8 30-Jan-19 0.50 U 0.61 U 0.39 U 0.32 I 8.1

14 - 20MW010

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 6-Dec-16 0.50 U 0.61 U 0.67 U 0.65 U 0.71 U 24-Jan-18 0.50 U 0.61 U 0.39 U 0.32 U 0.26 U 29-Jan-19 0.61 I 0.61 U 0.39 U 0.32 U 0.26 U

2 - 12MW012

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 5-Dec-16 0.50 U 0.61 U 0.67 U 3.1 21 24-Jan-18 0.50 U 0.61 U 0.39 U 0.87 I 5.6 30-Jan-18 0.50 U 0.61 U 0.39 U 1.1 12

40 - 50MW013

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 6-Dec-16 0.50 U 0.61 U 1.1 40 0.71 U 24-Jan-18 0.50 U 0.61 U 0.63 I 16 0.26 U 29-Jan-19 0.50 U 0.61 U 0.39 U 0.32 U 0.26 U

2 - 12MW015

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 06-Dec-16 0.50 U 0.61 U 0.67 U 0.65 U 0.71 U 23-Jan-18 0.50 U 0.61 U 0.39 U 0.32 U 0.26 U 30-Jan-19 0.50 U 0.61 U 0.39 U 0.32 U 0.26 U

MW016 15 - 20

Point ID Screen Interval

(ft bls) Sample Date

PCE

(ug/L)

TCE

(ug/L) trans-1,2-DCE

(ug/L) cis-1,2-DCE

(ug/L)

VC

(ug/L) 05-Dec-16 0.50 U 0.61 U 0.67 U 0.65 U 3.4

05-Dec-16 * 0.50 U 0.61 U 0.67 U 0.65 U 3.2 23-Jan-18 0.50 U 0.61 U 0.39 U 0.32 U 0.46 I 30-Jan-19 0.50 U 0.61 U 0.39 U 0.32 U 1.6