CN-370000-HW551-DC06G.pdf
PDF 2 MB Posted
- Contract number
- HW551
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form for Contract HW551, issued by the Florida Department of Environmental Protection (FDEP) to AECOM Technical Services, Inc. The task assignment, designated as DC006G with Module D000 and Grant NA, is managed by Billy Hessman as the DEP Contract Manager, with Mark Rasberry serving as the Contractor Representative. The work is located at the Artcraft Cleaners facility, situated at 18405 NW 7th Avenue in Miami, Dade County, Florida (DEP Site ERIC_4413), during the Monitoring phase of the project.
AECOM will conduct groundwater sampling at the Artcraft Cleaners site in accordance with the March 2020 scope of work and cost proposal, with the primary deliverable being a Groundwater Monitoring Report. The task encompasses three subtasks: Project Management (calculated at 12.5 percent of direct labor), Groundwater Sampling (including analysis of samples from one monitoring well for volatile organic halocarbons using EPA Method 8260, field screening, and report preparation), and GIS/ADaPT data file updates. The total task assignment value is fixed at $4,126.67 with no cost reimbursement or additional fees, and no retainage. The final deliverable is due June 30, 2020, with the task assignment completion date of September 25, 2020. Invoice submission is contingent upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW551
D000 NADC006G
AECOM Technical Services, Inc. (AECOM)
Mark Rasberry
850-245-8972Billy Hessman
ERIC_4413
Artcraft Cleaners
18405 NW 7th Ave, Miami, Dade Co
Monitoring
AECOM will conduct groundwater sampling in accordance with the March 2020 scope of work and cost proposal.
Groundwater Monitoring Report will be generated.
Groundwater Monitoring Report
06/30/2020
09/25/2020
$ 4,126.67 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.31 15:34:58 -04'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.31 15:35:04 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.04.01 16:01:05 -04'00'
Digitally signed by Rasberry, Mark DN: cn=Rasberry, Mark, ou=USORL3 Date: 2020.04.02 12:23:54 -04'00'
Rasberry, Mark
$ 4,126.67
Rasberry, Mark Joyal
Rasberry, Mark Typewriter 4/2/2020
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 06/30/2020
Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 4,126.67
$ 4,126.67
HW551
DC006G
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
TO: HW551 Contract File Artcraft Cleaners
ERIC_4413
FROM: Billy Hessman, Contract Manager
DATE: March 27, 2020
SUBJECT: Task Assignment Summary
HW551 DC006G
Groundwater Monitoring
This Task Assignment is for AECOM to conduct groundwater sampling. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Sampling Groundwater sampling will be conducted at one monitoring well. Sample will be analyzed for the presence of VOHs by EPA Method 8260. Following receipt of analytical data, a Groundwater Monitoring Report will be prepared and submitted to FDEP. Report will include field notes, sampling logs, lab report, and recommendations.
Subtask 3: GIS Update Subtask 3 includes labor hours for AECOM to generate and submit updated GIS/ADaPT data files.
This work will be conducted in line with the scope of work included in the GHD proposal, received March 30, 2020.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is June 30, 2020 and the completion date for the task assignment is September 25, 2020.
The final cost total for Task Assignment DC006G is $4,126.67.
FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.
Date: 31-Mar-20
Task #: HW551 DC006G SubTask 1 Project Management SubTask 6
Site: Artcraft Cleaners SubTask 2 2020 Annual NAM SubTask 7
Activity/Phase: Annual NAM SubTask 3 GIS - ADaPT SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$56.30 Project Manager (Rasberry) 2.4 2.4 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$56.30 Sr. Geologist (Rasberry) 12.0 10.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Engineer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 CAD Designer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Engineering Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$26.00 Field Technician (Slater) 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 28.4 2.4 24.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $1,211.71 $134.64 $964.47 $112.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 38.57% $467.36 $51.93 $372.00 $43.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $1,479.87 $164.44 $1,177.91 $137.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,158.94 $351.01 $2,514.38 $293.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $60.58 $6.73 $48.22 $5.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 1
FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.
Date: 31-Mar-20
Task #: HW551 DC006G SubTask 1 Project Management SubTask 6
Site: Artcraft Cleaners SubTask 2 2020 Annual NAM SubTask 7
Activity/Phase: Annual NAM SubTask 3 GIS - ADaPT SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $132.00 $132.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $195.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $3,810.77 $357.74 $3,153.85 $299.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $315.90 $35.10 $251.44 $29.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,126.67 $392.84 $3,405.29 $328.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 2
SITE : Artcraft Cleaners SUBTASK: 2 2020 Annual NAM
DATE: 3/31/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Geologist Annual NAM / Soil Sampling 10 (Rasberry) Order/ receive & inspect sample containers
Prepare field request Review field data documentation Update Figures and Tables Prepare GW Sample Report Sign and Seal Report subtotal 10
Sr. Engineer Annual NAM / Soil Sampling 1 (Joyal) Review Report subtotal 1
Field Technician Annual NAM / Soil Sampling 12 (Slater) Locate and water table elevation gauging (22 MWs)
Calibrate equipment Collect GW samples (1 MW) Collect one QC sample Preparation of Chain-of-Custody Manage IDW Packing the samples Deliver samples for shipping Travel/ Mob/ Demob subtotal 12
Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo) subtotal 1
TOTAL LABOR 24
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Truck $97.00 day 1 $97.00 subtotal $97.00
Vehicle Rental Hotel $0.00 day 0 $0.00 Per Diem $36.00 day 0 $0.00 subtotal $0.00
TOTAL TRAVEL $97.00
P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\Artcraft\DC006G 2020 NAM_XXXXXXXX\000-Pre-Contract\040 Proposal\ Artcraft 2020 NAM Proposal LOECEF.xlsx Page 1 of 3
SUBTASK: 2 2020 Annual NAM
DATE: 3/31/2020
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
subtotal $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Utility Locate
$200.00 hour 0 $0.00 subtotal $0.00
Drilling (Non-Conventional) subtotal $0.00
IDW
TBD Non-Haz Liquid Disposal $0.00 drum 0 $0.00
(Will be added by a TACO, as needed) subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QA/QC TOTALS
Analytical Costs (Fixed Lab) VOH - 8021 groundwater (1 sample + 1 duplicate) 66.00$ 1 1 $132.00 subtotal $132.00 Analytical Costs (Fixed Lab) Shipping (large cooler overnight) 104.00$ 0 $0.00 Shipping (small cooler overnight) 63.00$ 1 $63.00 subtotal $63.00
TOTAL LABORATORY $195.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Expendables Expendables $32.50 day 1 $32.50 subtotal $32.50
IDW Related Drum $58.20 each 1 $58.20 subtotal $58.20 Other Shallow GW Sampling kit $208.55 day 1 $208.55 subtotal $208.55
TOTAL FIELD EXPENSES $299.25
P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\Artcraft\DC006G 2020 NAM_XXXXXXXX\000-Pre-Contract\040 Proposal\ Artcraft 2020 NAM Proposal LOECEF.xlsx Page 2 of 3
SUBTASK: 3 GIS - ADaPT
DATE: 3/31/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Geologist Prepare & Submit GIS Data Tables 2 (Phillips) Task 2: 2 samples @ 8 min = 16 min
Task 2: 23 - 1 = 22 WLs @ 5 min = 110 min Total: 126 min
Rename & Submit ADaPT Data Report & Error Logs
TOTAL LABOR 2
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental subtotal $0.00
Mileage Costs subtotal $0.00
Air Fare subtotal $0.00
Per Diem + Hotel subtotal $0.00 subtotal $0.00
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional) subtotal $0.00 Drilling (Non-Conventional) subtotal $0.00 Mobile Laboratory subtotal $0.00 Surveying subtotal $0.00
IDW
subtotal $0.00 Other subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\Artcraft\DC006G 2020 NAM_XXXXXXXX\000-Pre-Contract\040 Proposal\ Artcraft 2020 NAM Proposal LOECEF.xlsx Page 3 of 3
AECOM
150 N Orange Ave.
Orlando, Florida 32801 www.aecom.com
407 843 6552 tel 407 839 1789 fax
March 31, 2020
Mr. Billy Hessman State of Florida Department of Environmental Protection Bureau of Waste Cleanup, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Artcraft Cleaners – 2020 Natural Attenuation Monitoring Proposal 18405 NW 7th Avenue Miami, Florida Facility ID # 139502146, ERIC_4413 Proposed Task Assignment HW551 DC006G
Dear Mr. Hessman:
AECOM is pleased to submit this scope of services and the attached Level of Effort/Cost Estimate (LOE/CEF) forms to perform an annual Natural Attenuation Monitoring (NAM) groundwater sampling event at the above referenced site. The most recent groundwater sampling took place on April 23, 2019.
TASK 1 Project Management
Project management is calculated at 12.5 percent of the direct labor and includes associated fringe, overhead, ODC and completion fees.
TASK 2 2020 NAM Sampling
Based on recommendations in the August 12, 2019 NAM report and the September 16, 2019 approval letter, AECOM proposes annual sampling of one monitoring well for evidence of natural attenuation. The well will be analyzed for volatile organic halocarbons (VOHs) by EPA Method 8260, and screened for other NAM parameters in the field according to the following table:
Sample Location (screen interval) VOHs Field Screening (Temp, pH, SpC, redox, DO, turbidity)
MW021 (110 - 120 ft bls) X X
Sampling will be conducted in accordance with DEP-SOP-002/01 FS 2200, and a duplicate sample will be collected from for quality control purposes. Well purge water will be
Artcraft Cleaners – 2020 NAM Proposal March 31, 2020 containerized pending laboratory results. No IDW disposal costs are included in this proposal;
however, they can be added by a change order, if required. Water levels will be measured in all existing and accessible monitoring wells (23 wells) to help evaluate groundwater flow patterns.
The well locations and previous sampling results are illustrated on Figure 3 provided in Attachment 1. AECOM will prepare a letter report to document the results of the annual groundwater sampling event.
TASK 3 GIS & ADaPT Deliverables
AECOM will update the GIS data tables to include all new analytical, field screening and water level gauging data. The laboratory ADaPT electronic files will be submitted, as required.
AECOM proposes the following invoice and deliverable schedule:
Task Cost Estimate Deliverable Date Task 1 - Project Management $392.84 NA Task 2 –Annual NAM $3,405.29 6/30/2019 Task 3 – GIS & ADaPT $328.54 6/30/2019
TOTAL $4,126.67 TA End date: 9/30/2020
The LOE/CEF is included as Attachment 2. Should you have any questions, or require additional information, please contact me at 407-513-8241, or by email at mark.rasberry@aecom.com.
Sincerely, AECOM Technical Services,Inc.
Mark Rasberry, PG Jennifer Joyal, P.E.
Project Manager Associate Vice President
Enc:
Attachment 1 – Figure 3, Well Locations & 2019 Analytical Results Attachment 2 - LOE/CEF
FORMER ARTCRAFT
CLEANERS
4/23/19
1.8
0.2 U
0.2 U
0.2 U
0.2 U
4/23/19
0.2 U
0.2 U
0.2 U
0.2 U
3.9
4/23/19
0.2 U
0.2 U
0.2 U
0.2 U
0.2 U
8/5/2019
FIGURE 3
GROUNDWATER CONTAMINATION MAP
APRIL 2019
ARTCRAFT CLEANERS
18405 NW 77th Ave., Miami, FL
FDEP FACILITY ID NO.: ERIC_4413
60603020
LEGEND
DATE
TETRACHLOROETHENE
TRICHLOROETHENE
cis-1,2-DICHLOROETHENE trans-1,2-DICHLOROETHENE
7/8/2019
VINYL CHLORIDE
MONITORING WELL
NOTES:
· RESULTS SHOWN IN µg/L
· U = INDICATES THAT THE CHEMICAL OF CONCERN WAS UNDETECTED
· I = INDICATES THE CHEMICAL WAS DETECTED BUT BELOW THE
REPORTING LIMIT; THEREFORE, AN ESTIMATED VALUE
· D = DATA REPORTED FROM A DILUTION
· GCTL = GROUNDWATER CLEANUP TARGET LEVELS AS PROVIDED IN
62-777, F.A.C.
· BOLD INDICATES ANALYTE DETECTED
· BOLD BLUE INDICATES CONCENTRATION GREATER THAN GCTLs
ABANDONED MONITOR WELL
DEEP MONITOR WELL
APPROXIMATE EXTENT OF CONTAMINATION
GREATER THAN GCTLs
| ERIC_4413 Artcraft Cleaners 2020 NAM Proposal.pdf |
| Sheets and Views |
| F3_GW_CONTAM MAP-Layout1 |
File details come from the government source that posted it. Updated .