This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for Contract No. HW551, Task Assignment DC006H. The contract is between the State of Florida and AECOM Technical Services, Inc. (AECOM), with Mark Rasberry serving as the contractor representative and Ben Grubbs as the FDEP Contract Manager. The work is being performed at the Artcraft Cleaners site located at 18405 NW 7th Avenue in Miami, Miami-Dade County (FDEP Site No. ERIC_4413). The task assignment was executed on March 18, 2021, with a performance period extending through July 16, 2021.
The task authorizes AECOM to conduct groundwater monitoring activities in accordance with the March 16, 2021 Scope of Work and Cost Estimate. The scope consists of three subtasks: Project Management (2.5 labor hours), 2021 Annual NAM Sampling (25 labor hours involving collection of groundwater samples from monitoring well MW021, field parameter recording, low-flow sampling methods, and analysis for volatile organic compounds), and GIS & ADaPT Deliverables (2 labor hours for submitting data tables and electronic files to FDEP). The total task assignment value is $4,257.43 on a fixed-price basis with no retainage. Final deliverables include an Annual Groundwater Monitoring Report and ADaPT/GIS update due on May 17, 2021, with invoicing authorized upon submittal and FDEP approval of the deliverables. The cost estimate includes 29.5 total labor hours, laboratory analytical costs of $261.00, field expenses of $194.98, travel costs of $97.00, and a completion fee of $331.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW551
D000 N/ADC006H
AECOM Technical Services, Inc. (AECOM)
Mark Rasberry
(850) 245-8992Ben Grubbs
ERIC_4413
Artcraft Cleaners
18405 NW 7th Ave, Miami, Miami-Dade
Monitoring
This Task Assignment authorizes AECOM to conduct groundwater monitoring activities in accordance with the March 16, 2021, Scope of Work and Cost Estimate.
Annual Groundwater Monitoring Report and ADaPT/GIS update
05/17/2021
07/16/2021
$ 4,257.43 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.03.18 08:18:55 -04'00'
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.03.18 08:19:11 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.03.18 13:54:05 -04'00'
Herring, Gina Digitally signed by Herring, Gina Date: 2021.03.25 11:43:16 -04'00'
$ 4,257.43
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 2-3: Annual Groundwater Monitoring Report and ADaPT/GIS update 05/17/2021
Subtasks 1-3: Submittal and FDEP approval of the Annual Groundwater Monitoring Report and ADaPT/GIS update $ 4,257.43
$ 4,257.43
HW551
DC006H
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: HW551 Contract Negotiation File Artcraft Cleaners Miami, Miami-Dade County
ERIC_4413
From: Ben Grubbs, Project Manager Date: March 18, 2021 Subject: Negotiation Summary
HW551 DC006H
This Task Assignment authorizes AECOM to conduct groundwater monitoring activities in accordance with the March 16, 2021, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: 2021 NAM Sampling AECOM will collect a groundwater samples from monitoring well MW021. Prior to sampling, depth-to-water will be measured. The well will then be purged, and field parameters will be recorded. The groundwater sample will be collected using low flow sampling methods and analyzed for volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in 55-gallon drums, while a sample from the drums is being analyzed for VOCs. IDW will be disposed of on site after receiving laboratory confirmation that the IDW is below Groundwater Cleanup Target Levels (GCTLs).
Subtask 3: GIS & ADaPT Deliverables AECOM will submit the ADaPT and GIS deliverables to FDEP.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $4,257.43 with 29.5 labor hours.
AECOM may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: AECOM Technical Services, Inc.
Date: 16-Mar-21
Task #: HW551 DC006H SubTask 1 Project Management SubTask 6
Site: Artcraft Cleaners SubTask 2 2021 Annual NAM SubTask 7
Activity/Phase: Annual NAM SubTask 3 GIS - ADaPT SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$56.30 Project Manager (Rasberry) 2.5 2.5 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$56.30 Sr. Geologist (Rasberry) 12.0 10.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Engineer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$34.50 CAD Designer (Barron) 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Engineering Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$26.00 Field Technician (Slater) 10.0 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 29.5 2.5 25.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $1,269.65 $141.08 $1,015.97 $112.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 38.57% $489.70 $54.41 $391.86 $43.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $1,550.62 $172.30 $1,240.80 $137.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,309.97 $367.79 $2,648.63 $293.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $63.48 $7.05 $50.80 $5.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 1
FDEP COST ESTI MATEContractor: AECOM Technical Services, Inc.
Date: 16-Mar-21
Task #: HW551 DC006H SubTask 1 Project Management SubTask 6
Site: Artcraft Cleaners SubTask 2 2021 Annual NAM SubTask 7
Activity/Phase: Annual NAM SubTask 3 GIS - ADaPT SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $198.00 $198.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $261.00 $261.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $104.28 $104.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $194.98 $194.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $3,926.43 $374.84 $3,252.41 $299.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $331.00 $36.78 $264.86 $29.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,257.43 $411.62 $3,517.27 $328.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 2
SITE : Artcraft Cleaners SUBTASK: 2 2021 Annual NAM
DATE: 3/16/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Geologist Annual NAM / Soil Sampling 10 (Rasberry) Order/ receive & inspect sample containers
Prepare field request Coordinate site access Review field data documentation Update tables Review updated figures Prepare GW Sample Report Characterize & Manifest IDW Sign and Seal Report subtotal 10
Sr. Engineer Annual NAM / Soil Sampling 1 (Joyal) Review Report subtotal 1
Field Technician Annual NAM / Soil Sampling 5 (Slater) Locate and water table elevation gauging (20 MWs)
Calibrate equipment Collect GW samples (1 MW) Collect one QC sample Preparation of Chain-of-Custody Manage IDW Packing the samples Deliver samples for shipping Travel/ Mob/ Demob 5 subtotal 10
CAD Designer Annual NAM / Soil Sampling (Barron) Complete report figures 3 subtotal 3
Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo) subtotal 1
TOTAL LABOR 25
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Truck $97.00 day 1 $97.00 subtotal $97.00
TOTAL TRAVEL $97.00
C:\Users\Grubbs_B\Desktop\Grubbs_B\HW551_AECOM\ERIC_4413_Artcraft\DC006H\TA\ CEFLOE_HW551_DC006H Page 3 of 5
SUBTASK: 2 2021 Annual NAM
DATE: 3/16/2021
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
IDW
TBD Non-Haz Liquid Disposal $0.00 drum 0 $0.00
(Will be added by a TACO, as needed) subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QA/QC TOTALS
Analytical Costs (Fixed Lab) VOH - 8260 groundwater (1 sample, 1 duplicate, 1 IDW) 66.00$ 2 1 $198.00 subtotal $198.00 Analytical Costs (Fixed Lab) Shipping (small cooler overnight) 63.00$ 1 $63.00 subtotal $63.00
TOTAL LABORATORY $261.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Expendables Expendables $32.50 day 1 $32.50 subtotal $32.50
IDW Related Drum $58.20 each 1 $58.20 subtotal $58.20 Other Shallow GW Sampling kit $208.55 day 0.5 $104.28 subtotal $104.28
TOTAL FIELD EXPENSES $194.98
CEFLOE_HW551_DC006H Page 4 of 5
SUBTASK: 3 GIS - ADaPT
DATE: 3/16/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Geologist Prepare & Submit GIS Data Tables 2 (Rasberry) Task 2: 2 samples @ 8 min = 16 min
Task 2: 20 - 1 = 19 WLs @ 5 min = 95 min Total: 111 min
Rename & Submit ADaPT Data Report & Error Logs
TOTAL LABOR 2
TRAVEL
TYPE RATE UNIT USAGE TOTALS
subtotal $0.00
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (SERVICES) $0.00
CEFLOE_HW551_DC006H Page 5 of 5
AECOM
150 N Orange Ave.
Orlando, Florida 32801 www.aecom.com
407 843 6552 tel 407 839 1789 fax
March 16, 2021
Mr. Ben Grubbs State of Florida Department of Environmental Protection Bureau of Waste Cleanup, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Artcraft Cleaners – 2021 Natural Attenuation Monitoring Proposal 18405 NW 7th Avenue Miami, Florida Facility ID # 139502146, ERIC_4413 Proposed Task Assignment HW551 DC006H
Dear Mr. Grubbs:
AECOM is pleased to submit this scope of services and the attached Level of Effort/Cost Estimate Forms (LOE/CEF) to perform annual Natural Attenuation Monitoring (NAM) groundwater sampling at the above referenced site. The most recent groundwater sampling event, conducted on June 1, 2020, indicated concentrations of vinyl chloride exceeding Groundwater Cleanup Target Levels (GCTLs) in on-site monitor well MW021. The proposed tasks will be performed as follows:
TASK 1 Project Management
Project management is calculated at 12.5 percent of the direct labor and includes associated fringe, overhead, ODC and completion fees.
TASK 2 2021 NAM Sampling
Based on recommendations in the June 26, 2020 NAM report and deliverable approval letter, AECOM proposes annual sampling of one monitoring well for evidence of natural attenuation.
The well will be analyzed for volatile organic halocarbons (VOHs) by EPA Method 8260, and screened for other NAM parameters in the field according to the following table:
Sample Location (screen interval) VOHs Field Screening (Temp, pH, SpC, redox, DO, turbidity)
MW021 (110 - 120 ft bls) X X
Artcraft Cleaners – 2021 NAM Proposal March 16, 2021
Sampling will be conducted in accordance with DEP-SOP-002/01 FS 2200, and a duplicate sample will be collected from for quality control purposes. Well purge water will be containerized pending laboratory results. No IDW disposal costs are included in this proposal;
however, they can be added by a change order, if required. Water levels will be measured in all existing and accessible monitoring wells (20 wells) to help evaluate groundwater flow patterns.
The well locations and previous sampling results are illustrated on Figure 3 provided in Attachment 1.
AECOM will prepare and submit a NAM Report, which will provide the analytical results for the proposed groundwater sampling event and include copies of field notes, the groundwater sampling logs and the laboratory analytical report. The report will provide a recommendation for future activities at the site, as appropriate.
TASK 3 GIS & ADaPT Deliverables
AECOM will update the GIS data tables to include all new analytical, field screening and water level gauging data. The laboratory ADaPT electronic files will be submitted, as required.
AECOM proposes the following invoice and deliverable schedule:
Task Cost Estimate Deliverable Date Task 1 - Project Management $411.62 NA Task 2 –Annual NAM $3,517.27 60 days after tasking Task 3 – GIS & ADaPT $328.54 60 days after tasking
TOTAL $4,257.43 120 days after tasking
The LOE/CEF is included as Attachment 2. Should you have any questions, or require additional information, please contact me at 407-513-8241, or by email at mark.rasberry@aecom.com.
Sincerely, AECOM Technical Services,Inc.
Mark Rasberry, PG Jennifer Joyal, P.E.
Project Manager Associate Vice President
Enc:
Attachment 1 – Figure 3, Well Locations & 2020 Analytical Results Attachment 2 - LOE/CEF
FORMER ARTCRAFT
CLEANERS
6/1/20
0.2 U
0.2 U
0.2 U
0.2 U
3.99
6/16/2020
FIGURE 3
GROUNDWATER CONTAMINATION MAP
JUNE 2020
ARTCRAFT CLEANERS
18405 NW 77th Ave., Miami, FL
FDEP FACILITY ID NO.: ERIC_4413
60631232
LEGEND
DATE
TETRACHLOROETHENE
TRICHLOROETHENE
cis-1,2-DICHLOROETHENE trans-1,2-DICHLOROETHENE
7/8/2019
VINYL CHLORIDE
MONITORING WELL
NOTES:
· RESULTS SHOWN IN µg/L
· U = INDICATES THAT THE CHEMICAL OF CONCERN WAS UNDETECTED
· I = INDICATES THE CHEMICAL WAS DETECTED BUT BELOW THE
REPORTING LIMIT; THEREFORE, AN ESTIMATED VALUE
· D = DATA REPORTED FROM A DILUTION
· GCTL = GROUNDWATER CLEANUP TARGET LEVELS AS PROVIDED IN
62-777, F.A.C.
· BOLD INDICATES ANALYTE DETECTED
· BOLD BLUE INDICATES CONCENTRATION GREATER THAN GCTLs
ABANDONED MONITOR WELL
DEEP MONITOR WELL
APPROXIMATE EXTENT OF CONTAMINATION
GREATER THAN GCTLs
AutoCAD SHX Text
MW019
AutoCAD SHX Text
MW018
AutoCAD SHX Text
MW017
AutoCAD SHX Text
MW020
AutoCAD SHX Text
MW023
AutoCAD SHX Text
MW021
AutoCAD SHX Text
MW002
AutoCAD SHX Text
MW003R
AutoCAD SHX Text
MW004
AutoCAD SHX Text
MW008
AutoCAD SHX Text
MW013
AutoCAD SHX Text
MW005
AutoCAD SHX Text
MW014
AutoCAD SHX Text
MW024
AutoCAD SHX Text
MW015
AutoCAD SHX Text
MW010
AutoCAD SHX Text
MW009
AutoCAD SHX Text
MW011
AutoCAD SHX Text
MW012
AutoCAD SHX Text
MW016
AutoCAD SHX Text
MW022
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REVISED BY:
AutoCAD SHX Text p:\dcs\projects\env\fdep\hw551\dc\artcraft\dc006g 2020 nam_60631232\900-cad- gis\910-cad\cad\f3_gw_contam map june 2020.dwg
AutoCAD SHX Text
MAR
AutoCAD SHX Text N
AutoCAD SHX Text 0'
AutoCAD SHX Text 50'
AutoCAD SHX Text
SCALE
AutoCAD SHX Text 25'
AutoCAD SHX Text 100'
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .