This document is a Task Assignment Notification Form (Attachment C) for the Florida Department of Environmental Protection (DEP) Contract No. GC892, specifically Task Assignment #5, involving the City of Jacksonville Environmental and Compliance Department as the Local Program. The contract is between the DEP and the City of Jacksonville, with David G. Warfel serving as the DEP Contract Manager and Allene Rachal as the Local Program Contract Manager.
The task assignment covers petroleum cleanup site management for fiscal year 2020-2021, with a total value of $1,600,168.50. The contract provides compensation for managing 580 non-Low Score Assessment (LSA) source properties, with varying rates based on the site's phase (planning, remediation, or monitoring). Compensation ranges from $1,890 to $6,300 per source property annually, depending on the site's status and complexity. The contract includes performance incentives, such as a $1,000 bonus for obtaining a Site Rehabilitation Completion Order, with a maximum annual performance incentive payment of 5% of the total non-LSA source property compensation. The task assignment period runs from July 1, 2020, to June 30, 2021, and includes a detailed list of 580 source properties requiring inspection during the fiscal year.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN819-T2.pdf | ||
| CN-370000-CN819-T3.pdf | ||
| CN-370000-GC921.pdf | ||
| CN-370000-CN819-T1.pdf | ||
| CN-370000-CN819.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
DEP Contract No. GC892, Attachment C, Page 1 of 4
TASK ASSIGNMENT NOTIFICATION FORM
DEP Agreement Number: GC892 Task Assignment #: GC892-05
Local Program Name: City of Jacksonville Environmental and Compliance Department
LP Contract Manager: Allene Rachal Phone #: (904) 255-7139
DEP Contract Manager: David G. Warfel Phone #: (850) 245-8891
Task Description: (use additional pages if necessary)
See attached .
Deliverables: See Attachment A, Paragraphs A, B, C and E.
Task Assignment Type Amount not to Exceed
Fixed Cost: $ 1,600,168.50 Task Performance Period July 1, 2020 to June 30, 2021
Total Task Assignment Value: $ 1,600,168.50
Organization Code E.O. Object Code Module Category Fiscal Year GAA Line Item # Budget Representative Approval
37450401002 JN 131545 4713 104138 00 GAA TBD
DEP Contract Manager Date
Cost Center Administrator Date
Program Administrator Date
Division Director Date
Deputy Secretary Date
Secretary Date
Contractor Representative Date
6/12/2020
David G. Warfel Digitally signed by David G. Warfel Date: 2020.06.18 14:57:49 -04'00'
Susan Fields Digitally signed by Susan Fields Date: 2020.06.18 15:40:36 -04'00'
Natasha Lampkin Digitally signed by Natasha Lampkin Date: 2020.06.18 16:30:45 -04'00'
Tim J. Bahr Digitally signed by Tim J. Bahr Date: 2020.06.29 16:32:38 -04'00'
John Truitt Digitally signed by John Truitt Date: 2020.06.29 17:07:32 -04'00'
Justin Wolfe Digitally signed by Justin Wolfe Date: 2020.07.02 11:18:20 -04'00'
Melissa M. Long Digitally signed by Melissa M. Long Date: 2020.06.12 10:48:57 -04'00'
Monica J. Brady Digitally signed by Monica J. Brady Date: 2020.06.29 15:19:08 -04'00'
Allene M. Rachal, P.G.
Digitally signed by Allene M. Rachal, P.G.
Date: 2020.06.12 10:36:11 -04'00'
Brady_MJ Line
Brady_MJ Typewritten Text
DEP Contract No. GC892, Attachment C, Page 2 of 4
Task Assignment No. 5 (07/01/2020 – 06/30/2021) A. Tasks
Local Program performs all work as specified in Attachment A of the Contract GC892.
B. Performance Measures
Department Contract Manager shall review deliverable documentation to ensure that work has been performed as specified in the Scope. The Department Contract Manager will notify the Local Program of acceptance or any deficiencies in the work and/or deliverables. The Local Program will be given an opportunity to remedy deficiencies at no additional cost to the Department. In addition, the Department Contract Manager will perform a detailed performance analysis to determine retainage release on a monthly basis, per Paragraph D below.
C. Compensation
Fixed costs include all expenses associated with vehicle operation and maintenance, lease, or rental (including vehicle maintenance cost for field visits and operation and maintenance (O&M) inspections; all travel costs associated with Department training and/or meetings with Department representative(s) within Florida) all costs for staffing, including salaries, fringe benefits, rent, utilities, any overhead and indirect expenses; general administrative expenses and all other costs related to the performance of the work specified in the Attachment A of the Contract and this Task Assignment.
1. Level of Effort.
If the Local Program has been assigned more than one site (discharge) at a source property, the Local Program will only be compensated for the site with the highest level of effort.
Retainage will be withheld as specified in Paragraph D for the following activities:
a. The Local Program will be compensated at a rate of $3,150.00 per source property per year in planning phase
(site assessment (SA), including interim source removal, and remedial action plan (RAP)).
b. Remediation phase (remedial action construction (RAC), operation and maintenance (O&M) and source removal (SR)); because more effort is expected and required in managing sites in these phases, source properties with sites in remediation phase will be compensated at a rate of $6,300.00 per year for the first two
(2) years after a RAP Approval Order, UIC Approval Order, or County-issued approval letter, if no Order is required, is issued for a Level 1 or Level 2 RAP or a Level 4 Limited Scope RAP or RAP Modification Plan (as defined in Attachment B of the Contract), and $3,150.00 after the first two (2) years. For a Level 1, 2 or 3 Limited Scope RAP or RAP Modification Plan (as defined in Attachment B of the Contract) the source property will be compensated at a rate of $6,300.00 for one (1) year after a RAP Approval Order, UIC Approval Order or County-issued approval letter if no Order is required, is issued, and $3,150.00 for subsequent years. This includes SRs (not interim source removals under SA) which will be paid at $6,300.00 for one (1) year and $3,150.00 for subsequent years.
c. Sites in monitoring phase (natural attenuation monitoring (NAM), post active remediation monitoring (PARM), long term natural attenuation monitoring (LTNAM), and well abandonment for site closure (WASC)); because minimal effort is expected and required for sites in this phase, the Local Program will be compensated at a rate of $1,890.00 per year.
d. Non-Program and Voluntary Cleanup sites: The Local Program will be compensated at 75% of the level of effort cost as described above.
Retainage will not be withheld for the following activities:
a. Sites that are low score assessments (LSAs): for LSA sites, the Local Program will receive a one-time payment of $3,150.00 per source property once the first LSA purchase order is issued.
DEP Contract No. GC892, Attachment C, Page 3 of 4
b. Once an LSA is complete, and if the Local Program determines that the site may qualify for conditional closure without remediation, either because a Conditional Closure Application or a No Further Action Proposal with Conditions has been submitted, the site may be paid at a rate of $3,150.00 on an annual basis until the Conditional Site Rehabilitation Completion Order or LSSI No Further Action Order is issued, or it is determined that conditional closure is not achievable without remediation.
2. Performance Incentives
a. In order to encourage more efficient site cleanup, and in addition to the fixed cost payments, the Local
Program shall be paid an additional target payment of $1000.00, when the following is completed at a site:
i. A Site Rehabilitation Completion Order (SRCO) per Chapter 62-780.680, F.A.C., or Low Score Site
Initiative No Further Action Approval Order per Section 376.3071(12), F.S., is issued, but only if the order is submitted to the Department within 60 days of the approval of the no further action proposal or well abandonment report, whichever is later. The number of discharges listed in a SRCO should correspond with the number of discharges listed in the no further action proposal. For example, if multiple discharges were proposed for no further action in a report, only one SRCO shall be submitted.
b. 5% PERFORMANCE INCENTIVE PAYMENT MAXIMUM -The maximum amount that can be paid annually is 5% of the total non-LSA source property compensation amount, even if more performance incentives are met. Performance incentives must be billed for on the invoice for the month they are achieved.
3. Cost reimbursement: No cost reimbursement will be made under this Task Assignment.
D. Financial Consequences
No payment will be made for unsatisfactory work. In addition, retainage will be withheld in the amount of 5% of 1/12 of the total non-LSA source property compensation.
Retainage
1. 5% of 1/12 of total non-LSA source property compensation will be withheld as retainage each month.
2. Based on the level to which performance measures are met, up to eighty percent (80%) of the retainage will be released the month after the invoice is submitted. Performance for purposes of obtaining the eighty percent (80%) retainage is based on the following four (4) performance measures:
a. Performance Measure 1: Turnaround times for deliverable reviews – Percentage of deliverable reviews that met turnaround times (Attachment T of Contract) will be self-reported in the monthly invoice and a percentage of those will be verified by the Department;
b. Performance Measure 2: Turnaround times for requests for change – Percentage of requests for change that met turnaround times will be self-reported in the monthly invoice and a percentage of those will be verified by the Department;
c. Performance Measure 3: Data entry correctly and timely completed in the Storage Tank Contamination Monitoring (STCM) database – based on a review by the Department of a percentage of documents reported on the invoice and correctly and timely updated in STCM (Paragraphs A.1.a., A.1.e, A.1.i., and A.1.l. of Attachment A). The overall percentage of data correctly and timely updated or entered in STCM will be extrapolated from the Department’s review; and
d. Performance Measure 4: Document correctly and timely inserted into OCULUS – based on a review by the Department of a percentage of documents reported on the invoice and correctly and timely inserted into STCM (Paragraphs A.1.e., A.1.f, A.1.g.iii, A.1.h, A.1.i., and A.1.m. of Attachment A). The overall percentage will be extrapolated from the Department’s review.
DEP Contract No. GC892, Attachment C, Page 4 of 4
3. Performance Measures: Monthly Retainage Release Schedule
a. The percentage calculated for each of the above four performance metrics will be averaged, and that average will be used to determine how much retainage will be released;
b. If the average of the four monthly performance metrics is 90% or above, then 80% of withheld retainage will be released the following month;
c. If the average of the four monthly performance metrics is at least 80%, but less than 90%, then 60% of withheld retainage will be released the following month and 20% of the withheld retainage will be forfeited.
d. If the average of the four monthly performance metrics is at least 70%, but less than 80%, then 40% of withheld retainage will be released the following month and 40% of the withheld retainage will be forfeited.
e. If the average of the four monthly performance metrics is below 70%, then 0% of the withheld retainage will be released the following month and 80% of the withheld retainage will be forfeited.
4. The remaining twenty percent (20%) of retainage will be withheld from each monthly payment and shall be released at the end of the Task Assignment if 98% of all assigned source properties were visited or inspected during the fiscal year pursuant to Paragraph A.1.g of Attachment A of the Contract, based on self-reporting by the Local Program and a percentage of those will be verified by the Department. See attached List of Source Properties Requiring Inspection in FY 20/21 for list of source properties that are assigned to be visited inspected.
Failure to meet the 98% target shall result in forfeiture of this retainage.
E. Budget Summary
The total Task Assignment (TA) amount for TA #5 of DEP Contract No. GC892 is $1,600,168.50. The Local Program will be paid an annual fixed cost base rate of $1,523,970.00 for petroleum cleanup site management, $1,523,970.00 of which will be for petroleum cleanup site management of 580 non-Low Score Assessment (LSA) source properties. Additional funds are considered in this Task Assignment for compensation associated with the completion of Performance Incentives (see Paragraph C.2., above). However, the actual payment amount may be less than the Task Assignment amount, based on the Local Program’s performance.
1. Payments for each month can range from 95% to 104% of 1/12 of the total non-LSA source property compensation amount, plus LSA costs (per Paragraph C.1.e above). An additional 1% of 1/12 of the total non- LSA source property compensation amount could be paid at the end of the Task Assignment.
2. SRCOs that are issued do not reduce the total non-LSA source property compensation amount for this Task Assignment.
3. If an additional number of source properties (increase of 5% or 15 sites, whichever is greater) are assigned to the
Local Program during a Task Assignment period, a Task Assignment Change Order may be issued to provide compensation for the increased number of source properties if the Local Program makes a written request.
List of Source Properties Requiring Inspection in FY 20/21
*Note - Per TA Attachment A Section A.1.g.i: "If a site will receive a site rehabilitation completion Order (SRCO) or if a low-score assessment (LSA) will be generally characterized for risk within the first two months of the fiscal year, a field visit or O&M inspection will not be required"
8506968 8507331 8507597 8521558 8507264 8506686 8507422 8507442 8507690 8515843 8629580 8631037 8732797 8842024 9813296 8521408 8628639 9101758 8507344 8507302 8507091 9806307 8518062 8521404 8521554 8625942 9101078 8628609 8506737 8506957 8507097 8507530 8626802 8506852 8500333 8506650 8507075 8507349 8507663 8507684 8515927 8516008 8733628 8837527 9600088 8625943 8943514 8507243 8506903 8944274 8506662 8629729 8507037
8506711 8521339 8733832 8736164 8842544 8506757 8506786 8506924 8506946 8506961 8506964 8506984 8506998 8507007 8507014 8507092 8507225 8507246 8507333 8507347 8507354 8507384 8507424 8507433 8507520 8507538 8507639 8507653 8507675 8512082 8512090 8512167 8521378 8521449 8521451 8521563 8521713 8521773 8625956 8626794 8629477 8629515 8629533 8629563 8629669 8629690 8629714 8731857 8732368 8732878 8734918 8838122 8838124
8842321 8942853 8943991 8944079 8945212 9100673 9100830 9101190 9201875 9401375 9502859 9810814 8506756 8506654 8506952 8507110 8507164 8507239 8507648 8512105 8512162 8515938 8521459 8629569 8734838 8839408 9101613 8500355 8500359 8500378 8500395 8506593 8506599 8506646 8506656 8506657 8506659 8506660 8506691 8506698 8506708 8506719 8506730 8506733 8506758 8506763 8506766 8506788 8506793 8506800 8506834 8506850 8506862
8506869 8506906 8506918 8506936 8506960 8506966 8506981 8506993 8507004 8507108 8507109 8507118 8507143 8507161 8507186 8507192 8507237 8507273 8507290 8507308 8507343 8507350 8507366 8507389 8507411 8507423 8507427 8507435 8507446 8507469 8507485 8507506 8507529 8507536 8507546 8507561 8507578 8507580 8507586 8507593 8507606 8507627 8507704 8512055 8512068 8512120 8515855 8515949 8516004 8521123 8521383 8521385 8521471
8521492 8521499 8521504 8521533 8521541 8521661 8521679 8521682 8521737 8521751 8521794 8521818 8521831 8627645 8629427 8629524 8629555 8629601 8629675 8629695 8629812 8631095 8731761 8731824 8732017 8732453 8732634 8732800 8732813 8736302 8840543 8840682 8840710 8840937 8840939 8841061 8841109 8841189 8841747 8842118 8842173 8842542 8942746 8942876 8942963 8942966 8942967 8943229 8943903 8944422 8944646 8944667 8944899
*Note - Per TA Attachment A Section A.1.g.i: "If a site will receive a site rehabilitation completion Order (SRCO) or if a low-score assessment (LSA) will be generally characterized for risk within the first two months of the fiscal
9045693 9045727 9046078 9047253 9100125 9100463 9100727 9100758 9101281 9101491 9101733 9102483 9201269 9201749 9201814 9202062 9202448 9300211 9300250 9400173 9400263 9400982 9401784 9402044 9501886 9502543 9502621 9600048 9602122 9701042 9804591 9810388 9812599 9814674 9816060 8507428 8507565 8521733 9400180 8735411 8521738 9400088 8507033 8521405 8629627 8733500 9101711 9103249 9804656 9811340 8944150 8507147 9202470
9802568 8506725 8506770 8506818 8506959 8506965 8506978 8507105 8507179 8507191 8507194 8507221 8507361 8507380 8507381 8507391 8507585 8521384 8521546 8521584 8521650 8625987 8629473 8629586 8629589 8733763 8838445 8944522 9047478 9103536 9201815 9400119 9502639 9701158 9701164 9801006 9802237 9803223 9803693 9803742 9804579 9804596 9804728 9806781 9806901 9807068 9808114 9808572 9808878 9810299 9810399 9811022 9814744
9816265 9816438 8521656 8506774 8521481 8629506 9401867 8500386 8506591 8506645 8506663 8506665 8506710 8506713 8506714 8506760 8506785 8506791 8506804 8506825 8506835 8506905 8506922 8506969 8507008 8507009 8507082 8507087 8507121 8507178 8507196 8507201 8507208 8507285 8507314 8507340 8507377 8507387 8507399 8507429 8507440 8507448 8507471 8507472 8507473 8507474 8507519 8507566 8507635 8507645 8507698 8507700 8512088
8512100 8512104 8515904 8515996 8518379 8521507 8521590 8521660 8521668 8521725 8521728 8521762 8521795 8521824 8626796 8626826 8629529 8629539 8629577 8629583 8629591 8629636 8629728 8631410 8731711 8733045 8737286 8837585 8837923 8840542 8840706 8841958 8842010 8842266 8942799 8942843 8943628 8943656 8943973 8944784 9045921 9047226 9100686 9103477 9200020 9201020 9201459 9401365 9401469 9500006 9501887 9502692 9701043
9800055 9801172 9806973 8507636 8500380 8506653 8506704 8506885 8506931 8506942 8506947 8506958 8507025 8507107 8507139 8507297 8507319 8507376 8507397 8507590 8507592 8512151 8518622 8521321 8521409 8521476 8521671 8625952 8628578 8629424 8629618 8736446 8842007 8945208 9046029 9046750 9100169 9100831 9201872 9100729 8506715 8506868 8506948 8507589 8507595 8521407 8628644 8629644 8733465 8733758 8733768 8841864 8942719
*Note - Per TA Attachment A Section A.1.g.i: "If a site will receive a site rehabilitation completion Order (SRCO) or if a low-score assessment (LSA) will be generally characterized for risk within the first two months of the fiscal
9101804 9201140 9201766 9806454 9807018 9063911 8506945 9600846 8506855 8507378 8507532 8507657 8521807 8629574 8629599 8629655 8731874 8842174 9100077 9102500 9401106 9802517 9804572 9814568 9815044 8507129 8943560 8944566 8944570 9101869 9802861 9803055 9804732 9805835 9806729 9806984 9810863 9811994 9812243 8507163 8521761 8625949 8629689 9046704 9700935 9802448 9808711 9809484 9810717 9811446 9813962 9815362 8507481
8507711 8515908 8628615 9700589 9804525