This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, for Stantec Consulting Services Inc. The task assignment is associated with Contract Number CN819, Project Number 61561, and specifically relates to the Fakahatchee Strand Preserve State Park Onsite Potable Water Well Installation and Abandonment project.

The task assignment outlines 14 specific subtasks for construction administration and support services, with a total fixed price cost of $67,937.46. The project is scheduled to run from the date of execution through September 30, 2026, and includes activities such as responding to Request for Additional Information (RAI), pre-bid and pre-construction meetings, permit support, shop drawing reviews, site visits, construction response management, and project closeout. The subtasks are priced individually, ranging from $1,569.75 to $10,268.79, and cover various engineering and administrative functions throughout the project lifecycle. Payment will be made upon approval of deliverables for each subtask by the FDEP.

View the file

Other files

File Type Posted
CN-370000-CN819-T2.pdf PDF
CN-370000-GC921.pdf PDF
CN-370000-CN819-T1.pdf PDF
CN-370000-CN819.pdf PDF
CN-370000-GC892-T5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDivision oof RRecreation aand PParks

CConsultant’s TTask AAssignment NNotification

FFLORIDA DEPARTMENT OF

EENVIRONMENTAL PPROTECTION

DRP-084

Rev. 0 /2025 of 2

FDEP Contract No: Project Number: Task Assignment No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Task Description:

Project Manager:

Schedule:

Start Date: Completion Date:

Fixed Price Cost: Cost Reimbursement (Not to Exceed):

Total Task Amount:

Signatures and Date:

1.

Budget Representative, FDEP Signature Date

2.

Project Manager, FDEP Signature Date

3.

Contract Manager, FDEP Signature Date

4.

Consultant Signature Date

5.

Contract Authority, FDEP Signature Date

CN819 61561 03

Fakahatchee Strand Preserve State Park Onsite Potable Water Well

Stantec Chris Brockmeier, PE

(239) 220-1460 chris.brockmeier@stantec.com

Vu Nguyen

(850) 245-2630 vu.nguyen@floridadep.gov

Moving from expired CN222 construction administration, and additional construction support services per the attached proposal dated March 11, 2025. Subtasks using CN222 rates are indicated by *.

Theresa Carron

Upon Execution 09/30/2026

$67,937.46 $67,937.46

Tamika Bass

Theresa Carron

Vu Nugyen

Chris E. Brockmeier, PE

Michael W. Foster Jr., PE

Tamika Bass Digitally signed by Tamika Bass Date: 2025.03.18 14:53:55 -04'00' 03/ /2025

T.Carron Digitally signed by T.Carron Date: 2025.03.18 15:35:58 -04'00' 03/ /2025

Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.03.20 09:58:25 -04'00' 03/20/2025

Brockmeier, Chris Digitally signed by Brockmeier, Chris Date: 2025.03.20 11:49:16 -04'00' 03/20/2025

Michael W. Foster Jr., P.E.

Digitally signed by Michael W. Foster Jr., P.E.

Date: 2025.03.25 16:19:50 -04'00'

DDivision oof RRecreation aand PParks

CConsultant’s TTask AAssignment NNotification

FFLORIDA DEPARTMENT OF

EENVIRONMENTAL PPROTECTION

DRP-084

Rev. /2025 2 of 2

Encumbrance Information:

Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount

Total:

61561 37504000114 080039/24 675002 U3200 131500 XR $67,937.46

$67,937.46

Stantec Consulting Services Inc.

3510 Kraft Road, Suite 200, Naples FL 34105-5029

March 11, 2025 File: 215618436

Attention: Ms. Theresa Carron, Project Manager Bureau of Design and Construction, Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520, Tallahassee, FL 32399

Dear Teri, Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

For your review, Stantec Consulting Services Inc. (Stantec), has provided a proposal summary and man-hour documentation for the service tasks identified below:

• Subtask 1: RAI Response #1

• Subtask 2: RAI Response #2

• Subtask 3: Pre-Bid Meeting

• Subtask 4: Bid Support/RFIs

• Subtask 5: Pre-Construction Meeting

• Subtask 6: Permit Support-Local & AHJ Coordination

• Subtask 7: Shop Drawing Review

• Subtask 8: Construction RFI Responses

• Subtask 9: Site Visit #1 - Well Install

• Subtask 10: Site Visit #2 - Equipment Placement

• Subtask 11: Site Visit #3 – Prior to Equipment Start-up

• Subtask 12: Substantial Site Visit with Punch List

• Subtask 13: Final Completion Site Visit

• Subtask 14: Permit & Project Closeouts and Certifications – Including O & M info /vendor discussions

Please review the attached Proposal Summary and deliverables.

Regards, Stantec Consulting Services Inc.

Kevin Yue PE, CEP Senior Environmental Engineer Mobile: 239-409-1323 Kevin.Yue@stantec.com

Chris E. Brockmeier PE Senior Principal Mobile: 239-220-1460 Chris.Brockmeier@stantec.com

Brockmeier, Chris

Digitally signed by Brockmeier, Chris DN: CN="Brockmeier, Chris", OU=Internal, OU=users, OU=stantec, DC=corp, DC=ads Date: 2025.03.11 14:28:56-04'00'

Task Assignment 03

Ms. Theresa Carron, Project Manager

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment Contract Number 819, Task Assignment TBD

Subtask 1: RAI Response #1

Description: Stantec anticipates that additional information may be requested to obtain approval for the installation of the system. Stantec will review and provide responses to the Request for Additional Information (RAI) #1 to the FDEP South District. Subtask 1 includes submission of RAI response to comments from the FDEP South District permit filed under previous CN222TA14. Rates listed below are carried over from the previous TA to continue the pricing commitment from Stantec.

Deliverable:

A PDF copy of the RAI Response #1 to FDEP South District.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 1: RAI Response #1 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 1 $ 232.11 Stantec Senior Project Engineer $ 166.05 4 $ 664.20 Stantec Project Engineer $ 118.68 18 $ 2,136.24 Stantec CADD Designer $ 64.50 6 $ 387.00 Stantec Administrative Assistant $ 53.16 8 $ 425.28 $3,844.83

Total for Subtask 1: $ 3,844.83

Subtask 2: RAI Response #2

Description: Stantec anticipates that additional information may be requested to obtain approval for the installation of the system. Stantec will review and provide responses to the Request for Additional Information (RAI) #2 to the FDEP South District. Subtask 2 includes submission of RAI response to comments from the FDEP South District permit filed under previous CN222TA14. Rates listed below are carried over from the previous TA to continue the pricing commitment from Stantec.

Deliverable:

A PDF copy of the RAI Response #2 to FDEP South District.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

TA3

TA3

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Fixed Price Cost:

Subtask 2: RAI Response #2 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 1 $ 232.11 Stantec Senior Project Engineer $ 166.05 2 $ 332.10 Stantec Project Engineer $ 118.68 8 $ 949.44 Stantec CADD Designer $ 64.50 4 $ 258.00 Stantec Administrative Assistant $ 53.16 2 $ 106.32 $1,877.97

Total for Subtask 2: $ 1,877.97

Subtask 3: Pre-Bid Meeting

Description: This task is to assist the DEP Project Manager with professional services during the construction bidding phase of the Project. These services shall include those efforts necessary to assist the DEP Project Manager during the competitive bid process to select a qualified construction contractor for the Project. The Consultant shall assist the DEP Project Manager with the following tasks during the competitive bid process:

The Consultant will attend one (1) pre-bid meeting during which the Consultant will be responsible for providing a brief overview of the Project’s Construction for providing a brief overview of the Project’s construction drawings, technical specifications, and permits.

If practical, the Consultant or DEP Project Manager will verbally respond to questions or comments from prospective bidders; however, any responses from the Consultant or DEP Project Manager to not become official until posted in an addendum.

The Consultant will keep notes of questions and comments presented by prospective bidders and provide written responses on the questions and comments presented during the meeting to the DEP Project Manager.

The mandatory pre-bid meeting will be held at the park at a time and place agreed upon with the Consultant and DEP Project Manager.

FDEP will advertise the bid and provide all bid documents to prospective Contractors. FDEP will take responsibility for the receipt of and opening of bids; reviewing bids received, including legal review and evaluation of bidders’ financial condition, business licenses or authorizations, bonding, and contractual requirements; and providing a final recommendation for Contractor selection.

Deliverable:

The Consultant shall provide to the DEP Project Manager the pre-bid meeting summary.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

TA3

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 3: Pre-Bid Meeting Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 2 $ 464.22 Stantec Senior Project Engineer $ 166.05 6 $ 996.30 Stantec Project Engineer $ 118.68 8 $ 949.44 Stantec Administrative Assistant $ 53.16 4 $ 212.64 $2,622.60

Total for Subtask 3: $ 2,622.60

Subtask 4: Bid Support/RFI

Description: Respond in writing to any bidding questions or comments. Revise and re-issue any sheets or specifications that were modified based upon those questions or comments.

Deliverables: Responses to comments, revisions to drawings, or revisions to specifications will be issued electronically in pdf format. Electronic signatures, where required, will be provided.

Performance Measures: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely, and that the scope has not exceeded DEP’s original intent (unless mandated by the permitting officials).

Fixed Price Cost:

Subtask 4 – Bid Support/RFI Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 4 $ 928.44 Stantec Senior Project Engineer $ 166.05 12 $1,992.60 Stantec Project Engineer $ 118.68 20 $2,373.60 Stantec CADD Designer $ 64.50 16 $1,032.00 Stantec Administrative Assistant $ 53.16 8 $ 425.28 $6,751.92

Total for Subtask 4: $6,751.92

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 5 – Pre-Construction Meeting

Description: This Sub Task includes the following work efforts/understandings:

Preparing for and presenting at the pre-construction meeting on the plans, technical specifications, construction methodology, specific conditions and monitoring requirements of the regulatory permits and verifying construction access and work areas.

The DEP Project Manager will attend the on-site meeting in addition to representatives from DEP’s, Park staff, Contractor’s project manager, project foreman and any sub-contractors so directed by the Contractor.

The DEP Project Manager shall prepare the pre-construction meeting agenda and coordinate with the

Consultant in responding to the Contractor’s questions concerning the technical aspects of the work and discuss issues including lines of communication between the DEP Project Manager, Consultant, park staff and Contractor, authority of each party, contract general and specific conditions, mobilization/demobilization activities, contract administration, correspondence procedures, project schedule, labor requirements, construction progress meetings and general site safety. The Consultant will provide a summary of the pre-construction conference discussions.

Providing follow-up information and drawings resulting from the pre-construction meeting.

The Consultant will coordinate the DEP Project Manager regarding the DEP Notice to Proceed and will submit the required Notice of Commencements to the regulatory agencies at least 48 hours prior to construction (as typically required by regulatory permits); and

The DEP and/or park staff will perform any environmental monitoring (e.g., turtle nesting, Dune Mouse, gopher tortoise, shorebird, or other protected species, etc.) that may be required by regulatory authorizations and will also be responsible for preparing and providing this information to regulatory agencies. Park staff will provide daily monitoring of construction activities and maintain detailed daily records of all work recorded. Copies of these records will be provided for review to the Consultant.

Deliverables: The Consultant shall provide to the DEP Project Manager the following documents:

Pre-construction meeting attendance log and summary of meeting (PDF Format).

Copy of Notice of Commencement to the regulatory agency (PDF Format).

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 5 – Pre-Construction Meeting Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 1 $ 232.11 Stantec Senior Project Engineer $ 166.05 8 $ 1,328.40 Stantec Project Engineer $ 118.68 4 $ 474.72 Stantec Staff Engineer $ 87.78 2 $ 175.56 Stantec Administrative Assistant $ 53.16 4 $ 212.64 $2,423.43

Total For Subtask 5: $2,423.43

Subtask 6: Permit Support-Local & AHJ Coordination

Description: The Consultant shall prepare, submit, and support the following:

Provide one set of Permit drawings Signed and Sealed for submittal by Contractor.

Update Permit drawings per Building Department RAIs and provide to Contractor for resubmittal.

Respond/answer RAI questions from permit agency.

Stantec has assumed that all permit fees will be paid for through the Construction Contract.

Deliverable: The Consultant shall provide the Subtask 6 Deliverables to the DEP Project Manager as follows:

E-copy (pdf format) of Permit drawings and RAI Response(s).

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 6 – Permit Support-Local & AHJ Coordination Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 5 $1,160.55 Stantec Senior Project Engineer $ 166.05 16 $2,656.80 Stantec Project Engineer $ 118.68 32 $3,797.76 Stantec CADD Designer $ 64.50 16 $1,032.00 Stantec Administrative Assistant $ 53.16 10 $ 531.60 $9,178.71

Total For Subtask 6: $9,178.71

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 7: Shop Drawing Review

Review the product submittals for Compliance with Contract Documents and return to the Contractor with acknowledgement of Acceptance/Rejection.

Coordinate with the Contractor to review questions that will arise through the review process.

Response to Shop Drawings (PDF format)

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, Fixed Price Cost:

Subtask 7 – Shop Drawing Review Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 231.11 2 $ 462.22 Stantec Senior Project Engineer $ 166.05 16 $2,656.80 Stantec Project Engineer $ 118.68 32 $3,797.76 Stantec Staff Engineer $ 87.78 8 $ 702.24 Stantec CADD Designer $ 64.50 6 $ 387.00 Stantec Administrative Assistant $ 53.16 12 $ 637.92 $8,643.94

Total For Subtask 7: $8,643.94

Subtask 8: Construction RFI Responses

Description: The Consultant will provide the following services during Project Construction Phase:

Respond to RFIs from the Contractor during construction.

Review construction testing results.

The Consultant will provide responses to Contractor’s RFI. (PDF format) The Consultant will provide review of construction testing results. (PDF format)

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, TA3

232.11 464.22

8,645.94

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 8 – Construction RFI Responses Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 1 $ 232.11 Stantec Senior Project Engineer $ 166.05 8 $1,328.40 Stantec Project Engineer $ 118.68 16 $1,898.88 Stantec Staff Engineer $ 87.78 10 $ 877.80 Stantec CADD Designer $ 64.50 8 $ 516.00 Stantec Administrative Assistant $ 53.16 6 $ 318.96 $5,172.15

Total For Subtask 8: $5,172.15

Subtask 9: Site Visit #1 – Well Install Description: The Consultant will conduct a Site Visit to the Project to review and document progress of construction activities.

Submit a Well Installation Observation Report (PDF format)

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, Fixed Price Cost:

Subtask 9 – Site Visit #1 – Well Install Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 1 $ 232.11 Stantec Senior Project Engineer $ 166.05 4 $ 664.20 Stantec Project Engineer $ 118.68 8 $ 949.44 Stantec Staff Engineer $ 87.78 2 $ 175.56 Stantec Administrative Assistant $ 53.16 4 $ 212.64 $1,569.75

Total For Subtask 9: $1,569.75

2,233.95

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 10: Site Visit #2 – Equipment Placement

Description: The Consultant will conduct a Site Visit to the Project to review and document progress of construction activities.

Submit a Equipment Placement Observation Report (PDF format)

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, Fixed Price Cost:

Subtask 10 – Site Visit #2 – Equipment Placement Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 1 $ 232.11 Stantec Senior Project Engineer $ 166.05 4 $ 664.20 Stantec Project Engineer $ 118.68 8 $ 949.44 Stantec Staff Engineer $ 87.78 2 $ 175.56 Stantec Administrative Assistant $ 53.16 4 $ 212.64

Total For Subtask 10: $1,569.75

Subtask 11: Site Visit #3 – Prior to Equipment Start-up

Description: The Consultant will conduct a Site Visit to the Project to review and document progress of construction activities.

Submit an Observation Report prior to equipment start-up (PDF format).

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, 2,233.95

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 11 – Site Visit #3 – Prior to Equipment Start-up Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 1 $ 232.11 Stantec Senior Project Engineer $ 166.05 4 $ 664.20 Stantec Project Engineer $ 118.68 8 $ 949.44 Stantec Staff Engineer $ 87.78 2 $ 175.56 Stantec Administrative Assistant $ 53.16 4 $ 212.64

Total For Subtask 11: $1,569.75

Subtask 12: Substantial Site Visit with Punch List

Description: The Consultant will conduct a Site Visit to the Project to review and document Substantial Completion of project.

Submit a Substantial site visit notes with associated Punch List (PDF format).

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, Fixed Price Cost:

Subtask 12 – Substantial Site Visit with Punch List Firm Name Position Classification Hourly Rate Ho2urs Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 2 $ 464.22 Stantec Senior Project Engineer $ 166.05 16 $2,656.80 Stantec Project Engineer $ 118.68 16 $1,898.88 Stantec Staff Engineer $ 87.78 20 $1,755.60 Stantec Administrative Assistant $ 53.16 2 $ 212.64 $6,988.14

Total for Subtask 12: $6,988.14

2,233.95

106.32

6,881.82

6,881.82

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 13 – Final Completion Site Visit

Description: The Consultant will conduct a Site Visit to the Project to review and document Final Completion of project.

Submit a Final Completion Site Observation Report (PDF format).

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, Fixed Price Cost:

Subtask 13 – Final Completion Site Visit Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 1 $ 232.11 Stantec Senior Project Engineer $ 166.05 6 $ 996.30 Stantec Project Engineer $ 118.68 12 $1,424.16 Stantec Staff Engineer $ 87.78 8 $ 702.24 Stantec Administrative Assistant $ 53.16 4 $ 212.64 $3,567.45

Total For Subtask 13: $3,567.45

Subtask 14 – Permit & Project Closeouts and Certifications – Including O & M info/vendor discussions

Description: The Consultant will prepare any completion notices required to be submitted to regulatory agencies as a condition of the permit.

The Consultant will also review the Construction Contractor provided “As Built” survey prepared by and Signed and Sealed by a Florida licensed Professional Surveyor and Mapper, depicting all the project improvements. The final survey of the Project will be required of the Construction Contractor as a part of the construction contract. The Contractor provided “As Built” drawing shall be submitted to the Consultant at least one (1) week prior to the substantial completion field visit. The Consultant will also review a O & M document for the Department to review.

The Consultant will submit the final Permit Certifications and provide a PDF format copy to the department.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Subtask 14 - Permit & Project Closeouts and Certifications – Including O & M info/vendor discussions Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Principal Engineer $ 232.11 7 $ 1,624.77 Stantec Senior Project Engineer $ 166.05 16 $ 2,656.80 Stantec Project Engineer $ 118.68 24 $ 2,848.32 Stantec Staff Engineer $ 87.78 16 $ 1,404.48 Stantec CADD Designer $ 64.50 17 $ 1,096.50 Stantec Administrative Assistant $ 53.16 12 $ 637.92 $10,268.79

Total For Subtask 14: $10,268.79

Project Schedule:

Activity Duration (Calendar Days) from NTP Subtask 1: RAI Response #1 90 days

Subtask 2: RAI Response #2 150 days

Subtask 3: Pre-Bid Meeting TBD- Based on Construction Schedule

Subtask 4: Bid Support/RFIs TBD- Based on Construction Schedule

Subtask 5: Pre-Construction Meeting TBD- Based on Construction Schedule

Subtask 6: Permit Support-Local & AHJ Coordination TBD- Based on Construction Schedule

Subtask 7: Shop Drawing Review TBD- Based on Construction Schedule

Subtask 8: Construction RFI Responses TBD- Based on Construction Schedule

Subtask 9: Site Visit #1 - Well Install TBD- Based on Construction Schedule

Subtask 10: Site Visit #2 - Equipment Placement TBD- Based on Construction Schedule

Subtask 11: Site Visit #3 - Prior to Equipment Start-up TBD- Based on Construction Schedule

Subtask 12: Substantial Site Visit with Punch List TBD- Based on Construction Schedule

Subtask 13: Final Completion Site Visit TBD- Based on Construction Schedule

Subtask 14: Permit & Project Closeouts and Certifications – Including O & M info/vendor discussions

Completed 60 day after construction contract set to expire

Duration (Calendar Days)

Reference: CN-819, Task Assignment, TBD, Fakahatchee Strand Preserve State Park Ground Water Well Installation and Abandonment

Summary of Fees:

Subtask Subtask Fixed Price

Cost Subtask Reimbursable

Subtask 1: RAI Response #1 $ 3,844.83 $ 0.00

Subtask 2: RAI Response #2 $ 1,877.97 $ 0.00

Subtask 3: Pre-Bid Meeting $ 2,622.60 $ 0.00

Subtask 4: Bid Support/RFIs $ 6,751.92 $ 0.00

Subtask 5: Pre-Construction Meeting $ 2,423.43 $ 0.00

Subtask 6: Permit Support-Local & AHJ Coordination $ 9,178.71 $ 0.00

Subtask 7: Shop Drawing Review $ 8,643.94 $ 0.00

Subtask 8: Construction RFI Responses $ 5,172.15 $ 0.00

Subtask 9: Site Visit #1 - Well Install $ 1,569.75 $ 0.00

Subtask 10: Site Visit #2 - Equipment Placement $ 1,569.75 $ 0.00

Subtask 11: Site Visit #3 - Prior to Equipment Start-up $ 1,569.75 $ 0.00

Subtask 12: Substantial Site Visit with Punch List $ 6,988.14 $ 0.00

Subtask 13: Final Completion Site Visit $ 3,567.45 $ 0.00

Subtask 14: Permit & Project Closeouts and Certifications – Including O & M info/vendor discussions $ 10,268.79 $ 0.00

Total Fixed Price Cost: $ 66,049.18

Overall Total Cost: $ 66,049.18

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.

2,233.95

6,881.82

67,937.46

67,937.46