About this file

This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection's Division of Recreation and Parks, involving Stantec Consulting Services, Inc. as the consultant for a project at Fakahatchee Strand Preserve State Park. The contract is specifically for the Big Cypress Boardwalk project, with Vu Nguyen as the FDEP Contract Manager and John Goss as the Project Manager. The document is identified with FDEP Contract No. CN819 and Project Number 61487C.

The task assignment covers Construction Administration services, including eight site visits (six renewals and two new visits) and a substantial inspection. The total fixed price for these services is $9,350.86, with no additional reimbursable costs. The contract runs from the execution date until August 31, 2026, and involves various engineering personnel from Stantec, including Senior Project Engineers, Project Engineers, and Staff Engineers. Payment will be made upon approval of deliverables for each subtask by the Florida Department of Environmental Protection, with rates carried over from a previous task assignment to maintain pricing consistency.

View the file

Other files

File Type Posted
CN-370000-CN819-T1.pdf PDF
CN-370000-CN819.pdf PDF
CN-370000-CN819-T3.pdf PDF
CN-370000-GC921.pdf PDF
CN-370000-GC892-T5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Recreation and Parks

Consultant’s Task Assignment Notification

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-084

Rev. 0 /2025 of 2

FDEP Contract No: Project Number: Task Assignment No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Task Description:

Project Manager:

Completion Date:

Cost Reimbursement (Not to Exceed):

Schedule:

Start Date:

Fixed Price Cost:

Total Task Amount:

Signatures and Date:

1.

Budget Representative, FDEP Signature Date

2.

Project Manager, FDEP Signature Date

3.

Contract Manager, FDEP Signature Date

4.

Consultant Signature Date

5.

Contract Authority, FDEP Signature Date

CN819 61487C 2

Fakahatchee Strand Preserve State Park Big Cypress Boardwalk

Stantec Consulting Services, Inc.

Chris Brockmeier, P.E.

(239) 220-1460 chris.brockmeier@stantec.com

Vu Nguyen

(850) 245-2630 vu.nguyen@floridadep.gov

This Task Assignment to transfer Construction Administration services from CN222, TA10 and adds two additional site visits, due to the length of the construction project. All subtasks using CN222 rates to finish this project, indicated by *. Per the attached proposal dated 2/25/2025.

John Goss

08/31/2026

$9,350.86 $0.00

$9,350.86

Tamika Bass

John Goss

Vu Nguyen

Chris Brockmeier, P.E.

Michael W. Foster, Jr., P.E.

03/18/2025

03/18/2025

03/18/2025

03/18/2025

03/18/2025

Division of Recreation and Parks

Consultant’s Task Assignment Notification

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-084

Rev. /2025 2 of 2

Encumbrance Information:

Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount

Total: $9,350.86

February 2025

John Goss Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399 941-882-7211 john.goss@floridadep.gov

RE: CN-819

Fakahatchee Strand Preserve SP Boardwalk Improvements

Dear John, For your review, Stantec Consulting Services Inc., has provided a proposal summary and man-hour documentation for the service tasks identified below:

Subtask 1: Site Visit #1 (Renewal) Subtask 2: Site Visit #2 (Renewal) Subtask 3: Site Visit #3 (Renewal) Subtask 4: Site Visit #4 (Renewal) Subtask 5: Site Visit #5 (Renewal) Subtask 6: Site Visit #6 (Renewal) Subtask 7: Site Visit #7 (NEW) Subtask 8: Site Visit #8 (NEW) Subtask 9: Substantial Inspection (Renewal) Subtask 10: Agency Certification (Renewal)

Please review the attached Proposal Summary and deliverables.

Sincerely, Chris E. Brockmeier, P.E.

Stantec Consulting Services Inc.

Boardwalk Replacement Big Cypress Bend Boardwalk

Contract Number CN81 , Task Assignment Number TBD

Construction Administrative Services Rates listed below are carried over from the previous TA to continue the pricing commitment from Stantec.

Subtask 1: Site Visit #1 (Renewal) Description:

Subtask 1: Site Visit #1

Deliverable:

Subtask 1: Site Visit #1 Observation Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 1 –Construction Observation – Site Visit #1 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 .25 $ 41.51 Stantec Project Engineer $ 118.68 1 $ 118.68 Stantec Staff Engineer $ 87.78 7.5 $ 658.35

Total For Subtask 1: $818.54

Subtask 2: Site Observation – Site Visit #2 (Renewal) Description:

Subtask 2: Site Visit #2

Deliverable:

Subtask 2: Site Visit #2 Observation Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 2 – Construction Observation – Site Visit #2 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 .25 $ 41.51 Stantec Project Engineer $ 118.68 1 $ 118.68 Stantec Staff Engineer $ 87.78 7.5 $ 658.35

Total For Subtask 2: $818.54

Subtask 3: Site Observation – Site Visit #3 (Renewal) Description:

Subtask 3: Site Visit #3

Deliverable:

Subtask 3: Site Visit #3 Observation Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 3 – Construction Observation – Site Visit #3 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 .25 $ 41.51 Stantec Project Engineer $ 118.68 1 $ 118.68 Stantec Staff Engineer $ 87.78 7.5 $ 658.35

Total For Subtask 3: $818.54

Subtask 4 – Site Visit #4 (Renewal) Description:

Subtask 4: Site Visit #4

Deliverable:

Subtask 4: Site Visit #4 Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 4 –Construction Observation - Site Visit #4 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 .25 $ 41.51 Stantec Project Engineer $ 118.68 1 $ 118.68 Stantec Staff Engineer $ 87.78 7.5 $ 658.35

Total For Subtask 4: $818.54

Subtask 5: Site Observation Visit #5 (Renewal) Description:

Subtask 5: Site Visit #5

Deliverable:

Subtask 5: Site Visit #5 Observation Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 5 –Construction Observation Site Visit #5 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 .25 $ 41.51 Stantec Project Engineer $ 118.68 1 $ 118.68 Stantec Staff Engineer $ 87.78 7.5 $ 658.35

Total For Subtask 5: $818.54

Subtask 6: Site Observation – Site Visit #6 (Renewal) Description:

Subtask 6: Site Visit #6

Deliverable:

Subtask 6: Site Visit #6 Observation Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 6 –Construction Observation – Site Visit #6 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 .25 $ 41.51 Stantec Project Engineer $ 118.68 1 $ 118.68 Stantec Staff Engineer $ 87.78 7.5 $ 658.35

Total For Subtask 6: $818.54

Subtask 7: Site Observation – Site Visit #7 (NEW) Description:

Subtask 7: Site Visit #7

Deliverable:

Subtask 7: Site Visit #7 Observation Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 7 –Construction Observation – Site Visit #7 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 .25 $ 41.51 Stantec Project Engineer $ 118.68 1 $ 118.68 Stantec Staff Engineer $ 87.78 7.5 $ 658.35

Total For Subtask 7: $818.54

Subtask 8: Site Observation – Site Visit #8 (NEW) Description:

Subtask 8: Site Visit #8

Deliverable:

Subtask 8: Site Visit #8 Observation Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 8 –Construction Observation – Site Visit #8 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 .25 $ 41.51 Stantec Project Engineer $ 118.68 1 $ 118.68 Stantec Staff Engineer $ 87.78 7.5 $ 658.35

Total For Subtask 8: $818.54

Subtask 9: Substantial Inspection (Renewal) Deliverable:

Subtask 9 Substantial Inspection Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 9 – Substantial Inspection Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 5 $ 830.25 Stantec Project Engineer $ 118.68 3 $ 356.04 Stantec Staff Engineer $ 87.78 12 $ 1,053.36

Total for Subtask 9: $2,239.65

Subtask 10: Agency Certification (Renewal) Deliverable:

Subtask 10: Agency Certification

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 10 – Agency Certification Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Stantec Senior Project Engineer $ 166.05 1 $ 166.05 Stantec Project Engineer $ 118.68 2 $ Stantec Administrative Assistant $ 53.16 3 $ 159.48

Total for Subtask 10: $5

Summary of Fees:

Subtask Subtask Fixed Price

Cost Subtask Reimbursable

Subtask 1: Construction Observation Site Visit #1 $ 818.54 $0.00 Subtask 2: Construction Observation Site Visit #2 $ 818.54 $0.00 Subtask 3: Construction Observation Site Visit #3 $ 818.54 $0.00 Subtask 4: Construction Observation Site Visit #4 $ 818.54 $0.00 Subtask 5: Construction Observation Site Visit #5 $ 818.54 $0.00 Subtask 6: Construction Observation Site Visit #6 $ 818.54 $0.00 Subtask 7: Construction Observation Site Visit #7 $ 818.54 $0.00 Subtask 8: Construction Observation Site Visit #8 $ 818.54 $0.00 Subtask 9: Substantial Inspection $ 2,239.65 $0.00 Subtask 10: Agency Certification $ 5 $0.00

Total Fixed Price Cost: $ 9 Total Reimbursable Cost: $ 0.00

Overall Total Cost: $ 9, Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.