This is Amendment No. 13 to Agency Term Contract No. GC861, a rate increase amendment executed between the Florida Department of Environmental Protection (FDEP) and AGUA LLC. The contract, originally executed on September 25, 2014, establishes an indefinite delivery vehicle for petroleum contamination site response action services in the South Region of Florida. The amendment was signed on May 13, 2024, by James D. Hirsch, President of AGUA LLC, and Jessica Kramer, Deputy Secretary of FDEP, with data entry processed on June 10, 2024.
The amendment implements a 5% rate increase across the contractor's rate schedule, effective for all new work assignments offered on or after June 10, 2024. The rate changes apply exclusively to new work assignments; all pre-existing work assignments continue under prior rates. Attachment D (V3.5), the updated Rate Schedule, contains comprehensive pricing for over 200 line items spanning site assessment, drilling and boring operations, well installation and abandonment, soil and water sampling and analysis, excavation and dewatering systems, remedial action systems, waste disposal and transportation, and engineering and professional services. All rate increases remain at or below the maximum 5% allowable threshold specified in contract provision 11.B.ii. The amendment does not modify contract line items, scope of work, or any other terms and conditions of the base contract, which remain in full effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC861-A12E1.pdf | ||
| CN-370000-GC861-A4.pdf | ||
| CN-370000-GC861-AR1.pdf | ||
| CN-370000-GC861.pdf | ||
| CN-370000-GC861-A10.pdf | ||
| CN-370000-GC861-A6.pdf | ||
| CN-370000-GC861-A8.pdf | ||
| CN-370000-GC861-CO1.pdf | ||
| PC-370000-GC861.pdf | ||
| CN-370000-GC861-A11.pdf | ||
| CN-370000-GC861-A15.pdf | ||
| CN-370000-GC861-A16.pdf | ||
| CN-370000-GC861-A2.pdf | ||
| CN-370000-GC861-A5.pdf | ||
| CN-370000-GC861-A9.pdf | ||
| CN-370000-GC861-CMC1.pdf | ||
| CN-370000-GC861-A14E2.pdf | ||
| CN-370000-GC861-A17.pdf | ||
| CN-370000-GC861-A3.pdf | ||
| CN-370000-GC861-A7.pdf | ||
| CN-370000-GC861-CMC.pdf | ||
| CN-370000-GC861-CMC2.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes
WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC861 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and AGUA LLC (hereinafter "Contractor") executed on September 25, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC861
RATE INCREASE
AMENDMENT NO. 13
Amendment No. 13 DEP Agency Term Contract No. GC861
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 13 DEP Agency Term Contract No. GC861
4.
5.
6.
Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.5) shall apply.
Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.
Pre-existing Rate
Agreed New Rate(1)
130.41$ $136.93 130.41$ $136.93 391.23$ $410.79
391.23$ $410.79
717.24$ $753.10
621.00$ $652.05
745.20$ $782.46
683.10$ $717.25
847.65$ $890.03
211.14$ $221.69 372.60$ $391.23
684.64$ $718.87
1,026.93$ $1,078.27
1,173.69$ $1,232.37
1,956.15$ $2,053.95
931.50$ $978.07
6,161.86$ $6,469.95
8,215.83$ $8,626.62
326.01$ $342.31
456.42$ $479.24
326.01$ $342.31
Est % Rate
Change(2)
+5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
2-1.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
3-15.
3-16.
3-17.
Description
3-12.
3-13.a.
Table 1. Listed Schedule of Pay Items with Rate Changes
Drill Rig and Support Vehicles Mobilization (hollow way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way miles each way
Work Trailer - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton
Contractor Oversight for Non-Price Schedule Activities miles each way
Excavator Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
File Review Site Health & Safety Plan
Receptor Survey and Exposure Pathway Identification (excludes report)
Site Reconnaissance/Field Measurement Visit
Mini Excavator/Loader (BobcatTM
100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Pay Item No.
1-1.
1-2.
3-14.a.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
456.42$ $479.24
652.05$ $684.65
39.74$ $41.72
41.73$ $43.81
44.71$ $46.94
146.55$ $153.87
102.68$ $107.81
3,105.00$ $3,260.25
27.32$ $28.68
28.56$ $29.98
34.77$ $36.50
28.68$ $30.11
32.59$ $34.21
39.11$ $41.06
36.51$ $38.33
41.07$ $43.12
45.64$ $47.92
32.90$ $34.54
36.01$ $37.81
44.08$ $46.28
40.42$ $42.44
46.28$ $48.59
+4.99%
+4.98%
+4.99%
+5.00%
3-18.
3-20.
5-9.
5-10.
5-11.
Sonic Core Sampling - 5 or 10 foot (during boring) feet total depth depth
Direct Push Technology (DPT) Rig and Equipment
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth depth depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth total depth
100 feet feet
Drum Compactor mobilization - > 100 miles each way
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way
5-1.a.1.
5-1.a.2.
5-1.a.3.
5-1.b.
5-2.
5-3.a.
5-6.
5-7.
5-17.
5-18.
5-19.
5-12.
5-13.
5-14.
5-15.
5-16.
5-8.
+5.00%
+5.00%
+4.98%
+4.98%
+4.99%
+4.99%
+5.00%
+5.00%
+4.98%
+4.97%
+4.98%
+4.99%
+4.97%
+4.98%
+5.00%
+4.99%
+5.00%
+4.99%
57.89$ $60.78
71.06$ $74.61
84.09$ $88.29
104.94$ $110.18
24.63$ $25.86 41.73$ $43.81
167.67$ $176.05
43.47$ $45.64
195.60$ $205.38
39.74$ $41.72 30.11$ $31.61 39.74$ $41.72 52.16$ $54.76 64.58$ $67.80
124.20$ $130.41
260.82$ $273.86
310.50$ $326.02
14.99$ $15.73
17.43$ $18.30
22.57$ $23.69
29.41$ $30.88 136.62$ $143.45
202.13$ $212.23
223.56$ $234.72
62.10$ $65.20 65.19$ $68.44 24.84$ $26.08 74.52$ $78.24 65.19$ $68.44
8-3.
8-6.
8-7.
8-8.
8-11.
6-5.
Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Domestic Water Well Sampling
Monitoring Well Sampling with Water Level, > 100 foot depth foot depth
Removal of Well Pad and Manhole
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
6-6.
6-7.
6-8.
Well Redevelopment
7-2.
7-3.
7-4.
7-1.
6-13.
6-14.
6-15.
7-7.
8-1.
8-2.
Surface Casing - 8 inch diameter Surface Casing - 6 inch diameter
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Well Installation - 1 inch diameter
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Electronic Data Deliverables (EDD) Free Product Gauging & Bailing Water Level or Free Product Gauging Soil/Sediment Sample Collection
Surface Casing - 12 inch diameter Surface Casing - 10 inch diameter
Well Installation - 6 inch diameter
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter (vertical)
Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
6-3.a.
6-3.b.
6-4.
6-2.b.
5-20.
5-21.
5-22.
5-23.
6-1.
6-2.a.
+5.00%
+4.98% +4.98% +4.98% +4.98% +4.99% +5.00%
+4.99%
+5.00%
+4.99%
+4.99%
+4.99% +4.98%
+5.00%
+4.99%
+5.00%
+5.00%
+4.94%
+4.99%
+4.96%
+5.00% +5.00%
+5.00%
+4.99%
+4.99% +4.99% +4.99% +4.99%
21.50$ $22.57
558.90$ $586.84
75.20$ $78.96
95.63$ $100.41
105.57$ $110.84
109.00$ $114.45
195.60$ $205.38
81.97$ $86.06
273.24$ $286.90
84.75$ $88.98
15.43$ $16.20 15.43$ $16.20 15.43$ $16.20 15.43$ $16.20
32.59$ $34.21
316.71$ $332.54
412.31$ $432.92
+4.97%
+5.00%
+5.00%
+4.99% +4.99% +4.99% +4.99%
8-14.
9-1.
9-3.
9-4.
9-5.
9-6.
9-18.
9-7.
9-8.
9-8.a.
9-10.
9-11.
9-12.
9-13.
9-14.
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Soil, Volatile Organic Halocarbons (EPA 8021 or
EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample Collection:
[Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or
ASTM D2937-10)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, Lead (EPA 6010 or EPA 6020) Soil, Chromium (EPA 6010 or EPA 6020) Soil, Cadmium (EPA 6010 or EPA 6020) Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
9-25.
9-26.
+4.98%
+5.00%
+5.00%
+5.00%
+4.99%
+5.00%
+5.00%
+4.99%
+5.00%
54.64$ $57.37
74.32$ $78.03
107.10$ $112.45
55.19$ $57.94
54.64$ $57.37
104.32$ $109.53
109.00$ $114.45
195.60$ $205.38
14.77$ $15.50
14.77$ $15.50
22.03$ $23.13
14.77$ $15.50
18.99$ $19.93
18.99$ $19.93
18.99$ $19.93
18.99$ $19.93
18.99$ $19.93
19.93$ $20.92
+5.00%
+4.99%
+5.00%
+4.98%
+5.00%
9-49.
9-50.
9-51.
9-53.
9-54.
9-55.
9-56.
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, Priority Pollutant Volatile Organics (EPA 8260)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-
NH3 H)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
9-32.
9-27.
9-28.
9-30.
9-31.
9-31.a.
9-41.
9-42.
9-33.
9-34.
9-38.
+5.00%
+4.94%
+4.94%
+4.99%
+4.99%
+5.00%
+4.94%
+4.95%
+4.95%
+4.95%
+4.95%
+4.95%
+4.97%
19.24$ $20.20
14.77$ $15.50
15.64$ $16.42
19.24$ $20.20
42.84$ $44.98
931.50$ $978.07
931.50$ $978.07
186.30$ $195.61
186.30$ $195.61
74.52$ $78.24
186.30$ $195.61
50.19$ $52.69
113.02$ $118.67
337.82$ $354.71
9-66.
9-57.
9-58.
9-59.
9-60.
9-61.
9-62.
9-63.
9-64.
9-65.
9-67.
9-79.
9-68.
9-71.
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved Solids]
(SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Air, Volatile Organic Compounds (EPA Method TO- 17)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA
9056 or SM 4500-SO4 C)
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution
GC/MS)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution
GC/MS)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:
Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Water, Heterotrophic Plate Count (SM 9215 B)
+4.98%
+5.00%
+5.00%
+4.99%
+4.94%
+4.99%
+4.99%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
186.30$ $195.61
186.30$ $195.61
12.42$ $13.04
8.69$ $9.12
43.47$ $45.64
1.54$ $1.61
2.78$ $2.91
7.75$ $8.13
32.59$ $34.21
28.68$ $30.11
45.64$ $47.92
45.64$ $47.92
14.34$ $15.05
13.03$ $13.68
81.36$ $85.42 71.72$ $75.30
3,129.84$ $3,286.33
130.41$ $136.93
9,389.52$ $9,858.99
163.00$ $171.15
+4.90%
+4.97%
+4.99%
+5.00%
+5.00%
+4.95%
+4.99%
+4.99%
+5.00%
+4.99%
+4.95%
+4.99%
+4.55%
+4.68%10-2.c.
10-2.d.
10-7.
10-8.
10-2.a.
9-72.
9-73.
10-1.a.
10-1.d.
10-2.b.
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Excavation
#57 Stone Pea Gravel
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and
Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards
Clean Backfill Material, Compaction and Testing
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Conventional Soil Excavation and Loading > 300 cubic yards cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Installation for > 20 feet deep Excavation
10-18.
10-19.
10-20.
10-21.
10-17.
10-14.
10-15.
10-15.a.
10-15.b.
10-16.
+5.00%
+5.00%
+5.00%
+5.00%
+4.99%
15,101.47$ $15,856.54
272.54$ $286.16
1,242.00$ $1,304.10
2,484.00$ $2,608.20
3,726.00$ $3,912.30
4,968.00$ $5,216.40
41.77$ $43.85
43.35$ $45.51 47.06$ $49.41
239.24$ $251.20
33.17$ $34.82
52.16$ $54.76
45.23$ $47.49
45.42$ $47.69
43.77$ $45.95
41.69$ $43.77
236.52$ $248.34
1.24$ $1.30
280.22$ $294.23
1.46$ $1.53
164.31$ $172.52
10.55$ $11.07
12-3.
12-4.
12-5.
12-6.
12-7.
Dewatering System, up to 12 well points (includes installation)
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
1,000 gal. capacity
Additional Dewatering System Well Points (2) (includes installation)
Disposal of Petroleum Impacted Soil at a Landfill
Transport Petroleum Impacted Soil (bulk) > 100 miles
Asphalt Paving - 2 inch thickness (includes sub-base)
Additional Rental of 20 Cubic Yard Roll-Off Container
Transport and Disposal of Petroleum Product (bulk)
Transport and Disposal of Petroleum Product (includes drum)
Transport and Disposal of Petroleum Contact Water (bulk)
Transport and Disposal of Petroleum Contact Water (includes drum)
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons
Transport and Disposal of Petroleum Impacted Soil (includes drum)
Transport and Disposal of Mixed Debris Transport and Disposal of Clean Concrete
Loading, Transport and Disposal/Recycle Clean Overburden
Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity
10-22.
10-23.
12-18.
13-1.
12-8.
11-3.
11-4.
11-1.
11-2.
12-9.
12-10.
12-11.
12-12.
12-13.
12-14.
12-15.
12-16.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.98%
+4.98% +4.99%
+5.00%
+4.97%
+4.98%
+5.00%
+5.00%
+4.98%
+4.99%
+5.00%
+4.84%
+5.00%
+4.79%
+5.00%
+4.93%
11.79$ $12.37
1.24$ $1.30
3,105.00$ $3,260.25
4,347.00$ $4,564.35
93.89$ $98.58
106.93$ $112.27 117.36$ $123.22
4,968.00$ $5,216.40
326.01$ $342.31
4,238.31$ $4,450.22
326.01$ $342.31
4,238.31$ $4,450.22 326.01$ $342.31
4,968.00$ $5,216.40
623.48$ $654.65
4,238.31$ $4,450.22
326.01$ $342.31
639.00$ $670.95
4,595.40$ $4,825.17
456.42$ $479.24
3,260.25$ $3,423.26
9,311.27$ $9,776.83
3,390.66$ $3,560.19 6,781.32$ $7,120.38
+5.00%
+5.00%
+5.00%
+5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+4.99% +4.99%
+5.00%
16-5.
16-18.
16-17.
16-6.
16-7.
16-8.
16-9.
16-10.
16-12.
16-13.
16-14.
16-21.
16-22.
14-4.
14-5.
15-1.a.
15-1.b.
15-1.c.
16-2.
16-3.
16-4.
Grass - Sod
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - Additional Time
Air Sparging or Biosparging Pilot Test - 8 hours
Groundwater Recovery System Pilot Test - Additional Time
Concrete Paving - 4 inch thickness (includes sub-base)
Trenching and Installation of 21 - 30 Lines Trenching and Installation of 11 - 20 Lines
System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Groundwater Injection System (not by direct push)
Groundwater Injection System (not by direct push)
Air Sparging/Vapor Extraction Pilot Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
AS/SVE System Package - Medium AS/SVE System Package - Medium
Groundwater Treatment System Package - Medium
Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test - Additional Time
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
13-3.
13-6.
15-4.d.
+5.00%
+5.00%
+5.00%
+4.92%
+4.84%
+5.00%
+5.00%
+5.00%
3,390.66$ $3,560.19 6,458.40$ $6,781.32 2,608.20$ $2,738.61 3,260.25$ $3,423.26 3,912.30$ $4,107.91 4,173.12$ $4,381.77
492.93$ $517.57
2,869.02$ $3,012.47
3,105.00$ $3,260.25
4,303.53$ $4,518.70
1,242.00$ $1,304.10
326.01$ $342.31
6,781.32$ $7,120.38
8,346.24$ $8,763.55
10,824.03$ $11,365.23
1,956.15$ $2,053.95 4,347.00$ $4,564.35 1,956.15$ $2,053.95 1,242.00$ $1,304.10 1,242.00$ $1,304.10
652.05$ $684.65
978.06$ $1,026.96
1,614.60$ $1,695.33
1,863.00$ $1,956.15
3,105.00$ $3,260.25
5,216.40$ $5,477.22
7,172.55$ $7,531.17
3,260.25$ $3,423.26
+5.00%
19-17.
19-8.
19-10.
19-13.
19-14.
19-15.
19-16.
18-58.
19-1.
19-3.
19-4.
19-5.
19-6.
19-7.
18-56.
18-54.
16-24.
17-1.
17-2.
17-3.
17-4.
17-5.
18-12.
18-14.
18-16.
16-23.
Construction Drawings and Specs Report
Supplemental System O&M Package - Add Thermox or Catox Treatment
System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small MPE System Package - Medium MPE System Package - Medium
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Air Sparge System - Small - Long Term > 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
Pilot Test Report
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Level 2 Natural Attenuation Monitoring Plan Receptor and Exposure Pathway Report Supplemental Site Assessment Report General Site Assessment Report Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System - Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System - Small - Long Term > 6 Months
Carbon Off Gas Treatment - Add On - Large - Short
Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
18-38.
18-37.
+5.00% +5.00% +5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
652.05$ $684.65
2,608.20$ $2,738.61 342.31$ $359.42
1,825.74$ $1,917.02
2,608.20$ $2,738.61 1,304.10$ $1,369.30
621.00$ $652.05 326.01$ $342.31 342.31$ $359.42
94.17$ $98.87 65.52$ $68.79 62.71$ $65.84 41.94$ $44.03
688.06$ $722.46
344.03$ $361.23
180.60$ $189.63
180.60$ $189.63
180.60$ $189.63
344.03$ $361.23
541.71$ $568.79
180.60$ $189.63
180.60$ $189.63
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00% +5.00% +5.00% +5.00% +5.00% +4.99% +4.99% +4.99%
21-31.
21-32.
19-20.
19-21.
19-22.
19-23.
19-25.
20-11.
20-8.
19-26.
19-27.
20-6.
20-7.
19-18.
19-19.
P.E. Review, Evaluation and Certification of a Pilot Test Report
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Laborers and Security Guards Field Technician (Key)
P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
Assistant Scientist/Technical Specialist Scientist/Technical Specialist (Key) Interim Assessment Report Well Abandonment/Site Restoration Report Free Product Recovery Report Remedial Action General Report Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non- Annual
Letter/NPDES Report
P.E. Review, Evaluation and Certification of As-Built Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
21-29.
21-30.
21-22.
21-25.
21-26.
21-27.
21-28.
+5.00%
+5.00%
+5.00%
+4.98%
361.22$ $379.28
361.22$ $379.28
326.01$ $342.31
21-33.
21-34.
21-36.
P.E. Review, Evaluation, and Certification of Annual PARM Report
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report