CN-370000-GC801-A14.pdf
PDF 710 KB Posted
- Contract number
- GC801
- Issued by
- Florida
About this file
Document Summary
This is Amendment No. 14 to Agency Term Contract No. GC801, executed between the Florida Department of Environmental Protection (FDEP) and ECOTECH Environmental Services, Inc. The original contract, dated February 24, 2014, provides petroleum contamination site response action services in Florida's North Region under the Petroleum Restoration Program. This amendment modifies rates only and does not add, delete, or modify any line items contained in the original contract.
The amendment establishes rate increases and decreases effective for new work assignments on or after the Rate Change Date of June 1, 2023, while all pre-Rate Change Date work assignments continue under the prior rate schedule. The rate changes are specified across 21 categories of pay items encompassing mobilization services, drilling and boring operations, sampling and analytical testing, soil and water analysis, excavation and disposal, remediation system packages, operations and maintenance, and professional services. Estimated percentage rate changes range from -13.04% to +8.00%, with most increases between 4% and 8%. The contract continues in effect up to twelve months after the renewal term expiration for completion of any purchase order or task assignment issued during the renewal term. A new requirement specifies that photo documentation of drum interiors is required to ensure compliance with the industry-wide standard of 75% full capacity.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
NOW THEREFORE, the parties agree as follows:
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.4) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.C of the Contract; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, The Agency Term Contract No. GC801 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and ECOTECH
ENVIRONMENTAL SERVICES, INC. (hereinafter "Contractor") executed on February 24, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC801
LANGUAGE AMENDMENT WITH
RATE INCREASE AND DECREASE
AMENDMENT NO. 14
Amendment No. 14
DEP Agency Term Contract No. GC801
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Amendment No. 14
DEP Agency Term Contract No. GC801
4.
5.
6.
C.
7.
8.
The following provision is hereby added to paragraph 4, Term of Contract:
This amendment shall include an update to ATTACHMENT A (V2.0), SCOPE OF SERVICES, V.
Technical Specification, B. Schedule of Pay Items, Section 12. DEBRIS, WASTE AND
PRODUCT REMOVAL AND DISPOSAL, as follows:
No new Purchase Orders or Task Assignments shall be issued or executed after renewal term. However, the Restated Contract shall continue in effect up to twelve months after expiration of the renewal term for completion of any Purchase Order or Task Assignment issued/executed during the renewal term. Purchase Orders or Task Assignments, completion of which that extends beyond the renewal term shall continue to be subject to change, as appropriate.
Photo documentation of the inside of the drums is required to ensure drums meet the industry wide standard of being 75% full.
Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.5) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change
Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate(1)
530.00$ $ 572.00
375.00$ $ 400.00
390.00$ $ 421.00
525.00$ $ 567.00
690.00$ $ 745.00
285.00$ $ 307.00
790.00$ $ 850.00
550.00$ $ 590.00
900.00$ $ 970.00
240.00$ $ 259.00
360.00$ $ 388.00
720.00$ $ 777.00
1,100.00$ $ 1,188.00
1,035.00$ $ 1,117.00
1,690.00$ $ 1,825.00
620.00$ $ 669.00
965.00$ $ 1,042.00
6,950.00$ $ 7,506.00
11,500.00$ $ 12,420.00
660.00$ $ 710.00
Est %
Rate
Change(2)
+7.92%
+6.67%
+7.95%
+8.00%
+7.97%
+7.72%
+7.59%
+7.27%
+7.78%
+7.92%
+7.78%
+7.92%
+8.00%
2-1.
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
3-16.
Description
3-12.
3-13.a.
Table 1. Listed Schedule of Pay Items with Rate Changes
Drill Rig and Support Vehicles Mobilization
(hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way
DPT Rig and Support Vehicles Mobilization - >
100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤
100 miles each way
Work Trailer - > 100 miles each way
Work Trailer - ≤ 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Contractor Oversight for Non-Price Schedule
Activities
LDA Rig and Support Vehicles Mobilization - ≤
100 miles each way
Excavator Mobilization - > 100 miles each way
Excavator Mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization
(hollow stem auger, mud rotary or sonic) - > 100 miles each way
File Review
Off-Site Property Access Agreement
Receptor Survey and Exposure Pathway
Identification (excludes report)
Site Reconnaissance/Field Measurement Visit
Loader/Backhoe Mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - >
100 miles each way
Pay Item No.
1-1.
1-5.
3-14.a.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
3-11.
+7.92%
+7.99%
+7.90%
+7.98%
+8.00%
+8.00%
+7.58%
460.00$ $ 450.00
51.30$ $ 54.30
140.00$ $ 150.00
205.00$ $ 220.00
3,000.00$ $ 3,200.00
1,985.00$ $ 2,100.00
28.75$ $ 31.00
34.65$ $ 37.00
38.50$ $ 41.00
33.35$ $ 36.00
40.25$ $ 43.00
39.65$ $ 42.00
46.00$ $ 49.00
48.30$ $ 52.00
50.60$ $ 54.00
37.65$ $ 40.00
40.25$ $ 43.00
50.85$ $ 54.00
49.75$ $ 52.00
55.20$ $ 58.00
65.55$ $ 70.00
+5.93%
3-17.
5-9.
5-10.
5-11.
Hand Auger Boring ≤ 10 foot total depth
Sonic Core Sampling - 5 or 10 foot (during boring)
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)
Direct Push Technology (DPT) Rig and
Equipment
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, >
100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, <
50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, >
100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, <
50 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth
Split Spoon Sampling – 2 foot (during boring)
50 to 100 feet
Mini Excavator/Loader (Bobcat
TM
) Mobilization
- ≤ 100 miles each way
5-1.a.2.
5-1.b.
5-2.
5-3.a.
5-5.a.
5-6.
5-7.
5-17.
5-18.
5-19.
5-20.
5-12.
5-13.
5-14.
5-15.
5-16.
5-8.
-2.17%
+5.85%
+7.14%
+7.32%
+6.67%
+5.79%
+7.83%
+6.78%
+6.49%
+7.95%
+6.83%
+6.52%
+7.66%
+6.72%
+6.24%
+6.83%
+6.19%
+4.52%
+5.07%
+6.79%
73.00$ $ 75.00
82.20$ $ 87.00
102.60$ $ 110.00
31.05$ $ 33.00
42.25$ $ 45.00
92.00$ $ 99.00
50.60$ $ 54.00
116.45$ $ 125.00
55.75$ $ 60.00
45.55$ $ 49.00
49.45$ $ 53.00
62.10$ $ 62.00
66.70$ $ 62.00
6.90$ $ 7.40
8.25$ $ 8.90
11.00$ $ 11.80
13.90$ $ 15.00
182.00$ $ 196.00
690.00$ $ 745.00
178.00$ $ 190.00
345.00$ $ 370.00
400.00$ $ 430.00
20.10$ $ 21.00
22.40$ $ 24.00
27.60$ $ 29.00
31.05$ $ 33.00
435.00$ $ 465.00
690.00$ $ 745.00
6-5.
Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Removal of Well Vault - 4 x 4 x 2 foot
Removal of Well Vault - 2 x 2 x 2 foot
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
6-6.
6-7.
6-8.
Well Redevelopment
Installation of Well Vault - 2 x 2 x 2 foot
6-9.a.
7-2.
7-3.
7-4.
7-5.
7-1.
6-9.b.
6-9.c.
6-9.d.
6-10.
6-11.
6-13.
6-14.
6-15.
7-6.
Surface Casing - 8 inch diameter
Surface Casing - 6 inch diameter
Well Installation - 1 inch diameter
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to
100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Above Grade Well Completion
Additional Well Screen > 20 feet - 6 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter
Surface Casing - 12 inch diameter
Surface Casing - 10 inch diameter
Well Installation - 6 inch diameter
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter (vertical)
Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
6-3.a.
6-3.b.
6-4.
6-2.b.
5-21.
5-22.
5-23.
6-1.
6-2.a.
+7.34%
+7.62%
+7.57%
+7.18%
-0.16%
-7.05%
+7.25%
+7.88%
+7.27%
+7.91%
+7.69%
+7.97%
+6.74%
+2.74%
+5.84%
+7.21%
+6.28%
+6.51%
+7.61%
+6.72%
+7.25%
+7.50%
+4.48%
+7.14%
+5.07%
+6.28%
+6.90%
+7.97%
184.00$ $ 195.00
193.00$ $ 205.00
275.00$ $ 290.00
114.70$ $ 120.00
120.75$ $ 120.00
69.00$ $ 74.00
92.00$ $ 95.00
25.30$ $ 27.00
73.00$ $ 78.00
34.00$ $ 35.00
69.00$ $ 70.00
21.85$ $ 23.00
450.00$ $ 486.00
48.40$ $ 52.00
58.00$ $ 62.50
80.00$ $ 86.00
100.00$ $ 108.00
90.00$ $ 97.00
250.00$ $ 265.00
80.00$ $ 86.00
8-14.
9-1.
9-2.
9-3.
9-4.
9-5.
9-6.
8-3.
8-4.
8-5.
8-6.
8-7.
8-8.
8-9.
8-10.
9-7.
9-8.
Free Product Sample Collection
Other Water Sampling
Domestic Water Well Sampling
Monitoring Well Sampling with Water Level, >
100 foot depth
Monitoring Well Sampling with Water Level, ≤
100 foot depth
Removal of Well Pad and Manhole7-7.
8-1.
8-2.
Soil, Total Recoverable Petroleum
Hydrocarbons (FL-PRO)
Soil, Priority Pollutant Extractable Organics-
Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Vapor/Ambient Air Sample Collection -
SUMMATM Canister (or equivalent)
Vapor/Ambient Air Sample Collection - Passive
Dosimeter, Sorbent Tube, Tedlar
TM
Bag (or
Equivalent)
Free Product Gauging & Bailing
Water Level or Free Product Gauging
Soil/Sediment Sample Collection
Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority
Pollutant Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample
Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram
Encore samples collected in the field but not submitted to the laboratory for testing
(discarded).
Soil, Priority Pollutant Volatile Organics (EPA
8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA
8270 or EPA 8310)
Soil, BTEX + MTBE + VOHs (EPA 8021 or
EPA 8260)
+5.26%
+8.00%
+7.44%
+7.76%
+7.50%
+8.00%
+7.78%
+6.00%
+7.50%
+5.98%
+6.22%
+5.45%
+4.62%
-0.62%
+7.25%
+3.26%
+6.72%
+6.85%
+2.94%
+1.45%
260.00$ $ 270.00
80.00$ $ 86.00
13.50$ $ 14.50
13.50$ $ 14.50
13.50$ $ 14.50
13.50$ $ 14.50
38.00$ $ 40.00
31.50$ $ 32.00
260.00$ $ 280.00
420.00$ $ 453.00
50.00$ $ 54.00
58.00$ $ 62.00
60.00$ $ 64.80
100.00$ $ 108.00
46.00$ $ 49.50
55.00$ $ 57.00
80.00$ $ 85.00
85.00$ $ 90.00
200.00$ $ 216.00
+5.26%
+1.59%
+7.69%
+7.86%
+8.00%
+6.90%
+8.00%
+8.00%
+7.61%
+3.64%
+7.41%
+7.41%
+7.41%
+7.41%
9-18.
9-20.
9-8.a.
9-10.
9-11.
9-12.
9-13.
9-14.
Soil, TRPH Fractionation (MADEP-EPH/VPH
Method or TPHCWG Direct Method)
Soil, Texture, (See Gee 7 Bauder [1966])
Water, Priority Pollutant Volatile Organics [for
NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Volatile Organic Halocarbons, except
EDB (EPA 8021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, Priority Pollutant Extractable Organics-
Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 +
EPA 625])
Water, Priority Pollutant Volatile Organics (EPA
8260)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -
96e1 or ASTM D2937-10)
Water, Used Oil/Unknown Product Group-Table
D of Ch. 62-780, F.A.C., except for non-Priority
Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-
Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020
[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471
[Mercury])
9-32.
9-25.
9-26.
9-27.
9-28.
9-29.
9-30.
9-31.
9-31.a.
9-33.
9-34.
+3.85%
+7.50%
+8.00%
+6.25%
+5.88%
220.00$ $ 236.00
80.00$ $ 85.00
63.00$ $ 60.00
27.00$ $ 29.00
27.00$ $ 29.00
13.00$ $ 14.00
15.00$ $ 16.00
15.00$ $ 16.00
15.00$ $ 16.00
15.00$ $ 16.00
15.00$ $ 16.00
15.00$ $ 16.00
22.00$ $ 23.75
16.00$ $ 17.00
12.00$ $ 12.95
12.60$ $ 13.00
14.50$ $ 15.00
9-57.
9-58.
9-59.
9-60.
9-49.
9-50.
9-51.
9-52.
9-53.
9-54.
9-55.
9-56.
Water, PCBs [or Aroclors] (EPA 608 or EPA
8082)
Water, Total Recoverable Petroleum
Hydrocarbons (FL-PRO)
Water, Priority Pollutant Extractable Organics-
Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA
608 + EPA 8270)
Water, Residue-nonfilterable [Total Suspended
Solids] (SM 2540 D)
Water, Residue-filterable [Total Dissolved
Solids] (SM 2540 C)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM
4500-PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM
5310 C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA
353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA
9251, EPA 9053, SM 4500CI B, SM 4500CI C
or SM 4500CI E)
Water, Ammonia [as N] (EPA 350.1, SM 4500-
NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or
SM 4500-NH3 H)
Water, Alkalinity [as CaCO3] (EPA 310.2 or
SM 2320 B)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Sulfate (ASTM D516-02, ASTM D516-
90, EPA 300.0, EPA 300.1, EPA 375.2, EPA
9038, EPA 9056 or SM 4500-SO4 C)
9-41.a.
9-44.a.
9-35.
9-36.
9-37.
+7.27%
+6.25%
-4.76%
+7.41%
+7.41%
+7.69%
+6.67%
+6.67%
+6.67%
+6.67%
+6.67%
+6.67%
+7.95%
+6.25%
+7.92%
+3.17%
+3.45%
35.00$ $ 37.80
810.00$ $ 870.00
810.00$ $ 870.00
84.00$ $ 75.00
75.00$ $ 80.00
50.00$ $ 54.00
85.00$ $ 90.00
100.00$ $ 108.00
210.00$ $ 200.00
220.00$ $ 200.00
260.00$ $ 250.00
425.00$ $ 400.00
34.75$ $ 37.50
25.85$ $ 27.90
131.10$ $ 140.00
107.50$ $ 116.00
164.45$ $ 175.00
+7.91%
+7.93%
+6.79%
+7.91%
+6.42%
-5.88%
10-7.
10-8.
10-9.
10-10.
9-66.
9-61.
9-62.
9-63.
9-73.
9-78.
9-79.
9-80.
9-68.
9-69.
9-70.
9-71.
Air, Polycyclic Aromatic Hydrocarbons (EPA
Method TO-13)
Air, Volatile Organic Aromatics (EPA Method
TO-15)
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High
Resolution GC/MS)
Air, Volatile Organic Compounds (EPA Method
TO-17)
Air, Total Petroleum Hydrocarbons (EPA
Method 18 or TO-3)
Water, Methane (EPA SOP RSK-175)
Water, EDC [1,2-dichloroethane] (EPA Method
8021 or 8260)
Water, BTEX/MTBE + Naphthalene (EPA
8260)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High
Resolution GC/MS)
Water, Acute Bioassay-96 Hour, Estuarine +
Marine, Vertebrate/Invertebrate [Vertebrate:
Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]
(EPA 2006.0/2007.0)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:
Ceriodaphnia dubia] (EPA 2000.0/2002.0)
Water, Heterotrophic Plate Count (SM 9215 B)
LDA Excavation and Loading With Surface
Casing ≤ 300 cubic yards
LDA Excavation and Loading Without Casing >
300 cubic yards
LDA Excavation and Loading Without Casing ≤
300 cubic yards
Conventional Soil Excavation and Loading >
300 cubic yards
Conventional Soil Excavation and Loading ≤
300 cubic yards
10-11.a.
+6.67%
+8.00%
+5.88%
+8.00%
-4.76%
-9.09%
-3.85%
+8.00%
+7.41%
+7.41%
-10.71%
310.50$ $ 335.00
154.00$ $ 150.00
250.00$ $ 240.00
125.00$ $ 130.00
36.20$ $ 39.00
35.00$ $ 37.00
65.85$ $ 71.00
59.80$ $ 64.00
3,020.00$ $ 3,000.00
121.26$ $ 120.00
6,145.00$ $ 6,635.00
392.40$ $ 400.00
525.00$ $ 500.00
4,800.00$ $ 4,500.00
4,800.00$ $ 4,500.00
8,000.00$ $ 7,500.00
2.85$ $ 3.07
2.85$ $ 3.07
48.30$ $ 52.00
40.25$ $ 43.00
57.20$ $ 60.00
200.00$ $ 216.00
29.15$ $ 31.45
43.70$ $ 47.15
+7.89%
-2.60%
-4.00%
+4.00%
+7.73%
+5.71%
+7.82%
-1.04%
+7.97%
12-3.
12-4.
12-5.
12-6.
12-7.
#57 Stone
Pea Gravel
Clean Backfill Material, Compaction and
Testing (includes transport) > 300 cubic yards
Clean Backfill Material, Compaction and
Testing (includes transport) ≤ 300 cubic yards
Flowable Fill Concrete and Installation
Additional Dewatering System Well Points (2)
(includes installation)
Dewatering System, up to 12 well points
(includes installation)
Additional Dewatering System Well Points (2)
(includes installation)
Dewatering System, up to 12 well points
(includes installation)
LDA Excavation and Loading With Driven
Casing > 300 cubic yards
LDA Excavation and Loading With Surface
Casing > 300 cubic yards
LDA Excavation and Loading With Driven
Casing < 300 cubic yards
Remove and Dispose Petroleum Storage Tank -
> 1,000 to 5,000 gal. capacity
Remove and Dispose Petroleum Storage Tank -
≤ 1,000 gal. capacity
Additional Dewatering System Well Points (2)
(includes installation)
Transport Petroleum Impacted Soil (bulk) > 100 miles
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport and Disposal of Petroleum Impacted
Soil (includes drum)
Transport and Disposal of Mixed Debris
Transport and Disposal of Clean Concrete
Loading, Transport and Disposal/Recycle Clean
Overburden
Additional Removal/Loading Cost for Concrete -
> 4 inch thickness
Removal and Loading of Asphalt and/or
Concrete - up to 4 inch thickness
Remove and Dispose Petroleum Storage Tank -
> 5,000 to 10,000 gal. capacity
10-18.
10-19.
10-20.
10-21.
10-23.
10-17.
10-11.b.
10-12.a.
10-12.b.
10-13.
10-14.
10-15.
10-16.
12-8.
11-3.
12-1.
12-2.
11-1.
11-2.
+1.94%
-4.76%
-6.25%
+7.02%
-0.66%
-6.25%
-6.25%
+7.72%
+7.72%
+7.66%
+6.83%
+4.90%
+8.00%
+7.89%
+7.89%
39.80$ $ 42.95
37.95$ $ 40.95
37.95$ $ 40.95
35.65$ $ 38.50
200.00$ $ 216.00
1.30$ $ 1.40
230.00$ $ 245.00
1.20$ $ 1.29
860.00$ $ 900.00
295.00$ $ 300.00
8.95$ $ 9.65
2.45$ $ 2.60
9.35$ $ 10.05
2.45$ $ 2.60
1.70$ $ 1.83
1.60$ $ 1.70
0.44$ $ 0.47
5,520.00$ $ 5,800.00
4,945.00$ $ 5,300.00
5,175.00$ $ 5,400.00
9,000.00$ $ 9,700.00
100.00$ $ 108.00
110.00$ $ 118.00
110.00$ $ 118.00
70.00$ $ 75.00
+7.27%
+7.27%
+7.14%
14-4.
14-5.
15-1.a.
15-1.b.
15-1.c.
In-Situ Injection Into Existing Well/Treatment
Point
Direct Push Boring with In-Situ Injection
Grass - Seed and Mulch
Grass - Sod
Crushed Lime Rock Cover - 2 inch thickness
Disposal of Petroleum Impacted Soil at a
Landfill (bulk) ≤ 450 tons
Asphalt Paving - 2 inch thickness (includes sub-base)
Additional Rental of 20 Cubic Yard Roll-Off
Container
Delivery, Pick Up and Rental of 20 Cubic Yard
Roll-Off Container
Transport and Disposal of Petroleum Product
(bulk)
Transport and Disposal of Petroleum Product
(includes drum)
Transport and Disposal of Petroleum Contact
Water (bulk)
Transport and Disposal of Petroleum Contact
Water (includes drum)
Disposal of Petroleum Impacted Soil at a
Thermal Treatment Facility (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a
Thermal Treatment Facility (bulk) ≤ 450 tons
Disposal of Petroleum Impacted Soil at a
Landfill (bulk) > 450 tons
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of 11 - 20 Lines
Trenching and Installation of Additional 1-10
Lines Greater Than 30 Lines
Trenching and Installation of 1-10 Plumbing
(and Electrical) Lines in Trench
Groundwater Injection System (not by direct push)
Groundwater Injection System (not by direct push)
14-1.a.
12-17.
12-18.
13-1.
13-2.
13-3.
13-4.
13-5.
13-6.
13-7.
15-1.d.
12-9.
12-10.
12-11.
12-12.
12-13.
12-14.
12-15.
12-16.
14-2.a.
+7.91%
+7.91%
+4.35%
+7.78%
+8.00%
+7.91%
+7.99%
+8.00%
+7.69%
+6.52%
+7.50%
+4.65%
+1.69%
+7.82%
+6.12%
+7.49%
+6.12%
+7.65%
+6.25%
+6.82%
+5.07%
+7.18%
5,505.00$ $ 5,945.00
6,380.00$ $ 6,890.00
7,575.00$ $ 8,180.00
4,600.00$ $ 4,000.00
3,040.00$ $ 3,280.00
4,600.00$ $ 4,000.00
435.00$ $ 465.00
4,000.00$ $ 4,300.00
410.00$ $ 440.00
3,500.00$ $ 3,700.00
250.00$ $ 270.00
250.00$ $ 270.00
4,600.00$ $ 4,965.00
285.00$ $ 300.00
5,430.00$ $ 5,850.00
285.00$ $ 300.00
5,500.00$ $ 5,940.00
2,530.00$ $ 2,500.00
5,310.00$ $ 5,700.00
3,045.00$ $ 3,200.00
6,555.00$ $ 7,075.00
2,875.00$ $ 2,500.00
8,050.00$ $ 8,000.00
4,600.00$ $ 4,500.00
-13.04%
+6.90%
+7.50%
+7.32%
+5.71%
+8.00%
+8.00%
+7.93%
+5.26%
+7.73%
+5.26%
+8.00%
-1.19%
+7.34%
+5.09%
+7.93%
-13.04%
-0.62%
-2.17%
+7.99%
+7.99%
+7.99%
-13.04%
+7.89%
16-24.
16-25.
16-5.
16-6.
16-8.
16-9.
16-10.
16-11.
16-12.
16-13.
16-19.
16-20.
16-21.
16-22.
16-23.
16-1.
16-2.
16-3.
16-4.
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test -
Additional Time
Vapor Extraction Pilot Test - Additional Time
Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test -
Additional Time
Air Sparging or Biosparging Pilot Test - 8 hours
Groundwater Recovery System Pilot Test -
Additional Time
Groundwater Recovery System Pilot Test - 8 hours
System Installation/Integration/Startup –
Addition of 1 Technology Component
System Installation/Integration/Startup - 1
Technology Component - 1-10 Additional
Recovery/Treatment Points greater Than 30
(This item is used in conjunction with 15.4.c when needed)
System Installation/Integration/Startup - 1
Technology Component - 21-30
Recovery/Treatment Points
System Installation/Integration/Startup - 1
Technology Component - 11-20
Recovery/Treatment Points
System Installation/Integration/Startup - 1
Technology Component - 1-10
Recovery/Treatment Points
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test -
Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
AS/MPE System Package - Medium
MPE System Package - Medium
MPE System Package - Medium
AS/SVE System Package - Medium
AS/SVE System Package - Medium
Air Sparge System Package - Medium
Air Sparge System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test -
8 hours
15-4.a.
15-4.b.
15-4.c.
15-4.d.
15-5.
11,500.00$ $ 10,000.00
3,795.00$ $ 3,500.00
8,280.00$ $ 7,500.00
2,760.00$ $ 2,980.00
3,055.00$ $ 3,290.00
3,160.00$ $ 3,410.00
3,965.00$ $ 4,280.00
540.00$ $ 580.00
380.00$ $ 350.00
1,050.00$ $ 1,000.00
2,530.00$ $ 2,730.00
2,400.00$ $ 2,500.00
3,015.00$ $ 3,250.00
2,600.00$ $ 2,800.00
4,600.00$ $ 4,800.00
3,565.00$ $ 3,700.00
3,595.00$ $ 3,880.00
3,795.00$ $ 4,050.00
3,860.00$ $ 4,160.00
3,965.00$ $ 4,280.00
5,290.00$ $ 5,700.00
5,200.00$ $ 5,610.00
3,900.00$ $ 4,000.00
3,600.00$ $ 3,800.00
6,300.00$ $ 6,000.00
+7.94%
+7.75%
-13.04%
-7.77%
-9.42%
+7.97%
+7.69%
+7.91%
18-3.
18-21.
18-22.
16-26.
16-27.
16-28.
17-1.
17-2.
17-3.
17-4.
17-5.
18-1.
18-20.
18-11.
18-12.
18-13.
18-14.
18-15.
18-16.
18-17.
18-18.
18-19.
Medium Holding Tank - 2,000 to 6,000 gal.
capacity - Short Term ≤ 6 mos.
Supplemental System O&M Package - Add
Thermox or Catox Treatment
Large Holding Tank > 6,000 to 10,000 gal.
capacity - Short Term ≤ 6 mos.
System O&M Package - Extra Large
System O&M Package - Large
System O&M Package - Medium
System O&M Package - Small
SVE System Package - Medium
SVE System Package - Medium
AS/MPE System Package - Medium
Groundwater Treatment - Add On - Large -
Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Medium -
Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Small -
Short Term ≤ 6 mos.
Air Sparge System - Medium - Short Term ≤ 6 mos.
Air Sparge System - Small - Long Term > 6 mos.
Air Sparge System - Small - Short Term ≤ 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
18-29.
18-30.
18-31.
+7.94%
+7.41%
-7.89%
-4.76%
+7.88%
+2.56%
+5.56%
-4.76%
+7.91%
+4.17%
+7.79%
+7.69%
+4.35%
+3.79%
+7.93%
+6.72%
+7.77%
4,800.00$ $ 5,000.00
6,900.00$ $ 7,000.00
730.00$ $ 780.00
730.00$ $ 780.00
1,100.00$ $ 1,180.00
380.00$ $ 410.00
390.00$ $ 420.00
3,700.00$ $ 3,900.00
4,300.00$ $ 4,500.00
6,000.00$ $ 6,400.00
3,300.00$ $ 3,500.00
3,900.00$ $ 4,200.00
5,200.00$ $ 5,500.00
4,350.00$ $ 4,600.00
3,750.00$ $ 4,000.00
4,830.00$ $ 5,200.00
4,830.00$ $ 5,200.00
6,300.00$ $ 6,800.00
6,300.00$ $ 6,500.00
6,900.00$ $ 7,400.00
6,700.00$ $ 7,200.00
18-43.
18-44.
18-45.
18-46.
18-47.
18.48.
18-49.
18-50.
18-51.
18-52.
18-53.
18-54.
Thermox/Catox Off Gas Treatment - Add On -
Small - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small-
Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Long
Term > 6 mos.
Groundwater Treatment - Add On - Medium -
Long Term > 6 mos.
Soil Vapor Extraction (SVE) System - Large -
Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Medium -
Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Small - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Small - Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Large -
Long Term > 6 Months
Carbon Off Gas Treatment - Add On - Large -
Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Medium -
Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Small -
Short Term ≤ 6 mos.
Soil Vapor Extraction (SVE) System - Medium -
Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Small -
Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Small -
Short Term ≤ 6 Months
Thermox/Catox Off Gas Treatment - Add On -
Large - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On -
Medium - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On -
Small - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On -
Large - Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On -
Medium - Short Term ≤ 6 mos.
18-38.
18-33.
18-34.
18-35.
18-36.
18-37.
18-39.
18-41.
18-42.
+4.17%
+1.45%
+6.85%
+6.85%
+7.27%
+7.89%
+7.69%
+5.41%
+4.65%
+6.67%
+6.06%
+7.69%
+5.77%
+5.75%
+6.67%
+7.66%
+7.66%
+7.94%
+3.17%
+7.25%
+7.46%
8,050.00$ $ 8,600.00
7,590.00$ $ 8,100.00
9,775.00$ $ 10,500.00
9,545.00$ $ 10,300.00
2,000.00$ $ 2,160.00
2,925.00$ $ 3,150.00
2,050.00$ $ 2,210.00
1,140.00$ $ 1,230.00
1,040.00$ $ 1,120.00
660.00$ $ 710.00
1,500.00$ $ 1,620.00
950.00$ $ 1,025.00
1,500.00$ $ 1,620.00
12,100.00$ $ 13,000.00
16,000.00$ $ 17,200.00
1,650.00$ $ 1,780.00
3,000.00$ $ 3,240.00
5,500.00$ $ 5,940.00
8,600.00$ $ 9,280.00
3,765.00$ $ 4,065.00
750.00$ $ 810.00
2,800.00$ $ 3,020.00
330.00$ $ 350.00
1,870.00$ $ 2,010.00
3,300.00$ $ 3,560.00
1,200.00$ $ 1,290.00
650.00$ $ 700.00
410.00$ $ 440.00
315.00$ $ 340.00
1,200.00$ $ 1,290.00
140.00$ $ 150.00
+6.72%
+7.42%
+6.06%
+7.49%
+7.88%
+7.50%
+7.69%
+7.32%
+7.94%
+7.50%
+7.14%
19-17.
19-8.
19-9.
19-10.
19-11.
19-12.
19-13.
19-14.
19-15.
19-16.
19-26.
19-27.
20-1.
19-20.
19-21.
19-22.
19-23.
19-24.
19-25.
18-57.
18-58.
19-1.
19-3.
19-4.
19-5.
19-6.
19-7.
19-18.
19-19.
18-56.
18-55.
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Construction Drawings and Specs Report
Level 1 Remedial Action Plan
Pilot Test Report
Pilot Test Plan
Natural Attenuation or Post RA Monitoring
Report, Annual
Natural Attenuation or Post RA Monitoring
Report, Quarterly or Non-Annual
Level 2 Natural Attenuation Monitoring Plan
Receptor and Exposure Pathway Report
Supplemental Site Assessment Report
General Site Assessment Report
Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE)
System - Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Large - Short Term ≤ 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE)
System - Medium - Short Term ≤ 6 Months
Level 4 Limited Scope Remedial Action Plan or
RAP Modification Plan
Level 3 Limited Scope Remedial Action Plan or
RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or
RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or
RAP Modification Plan
Level 2 Remedial Action Plan
Program Manager (Key)
Interim Assessment Report
Well Abandonment/Site Restoration Report
Free Product Recovery Report
Remedial Action Interim Report
Remedial Action General Report
Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or
Non-Annual
Letter/NPDES Report
+7.91%
+8.00%
+7.69%
+7.80%
+7.89%
+7.69%
+7.58%
+8.00%
+7.89%
+8.00%
+7.44%
+8.00%
+8.00%
+6.83%
+7.91%
+7.97%
+8.00%
+7.86%
+7.50%
+7.88%
130.00$ $ 140.00
115.00$ $ 124.00
115.00$ $ 124.00
105.00$ $ 110.00
95.00$ $ 102.00
90.00$ $ 95.00
81.00$ $ 87.00
45.00$ $ 48.00
130.00$ $ 140.00
130.00$ $ 140.00
800.00$ $ 864.00
1,000.00$ $ 1,080.00
1,675.00$ $ 1,805.00
2,310.00$ $ 2,490.00
2,625.00$ $ 2,835.00
500.00$ $ 540.00
2,500.00$ $ 2,700.00
800.00$ $ 864.00
750.00$ $ 810.00
520.00$ $ 560.00
+7.69%
+7.83%
+7.83%
+4.76%
+7.37%
+5.56%
+7.41%
+8.00%
20-10.
21-1.
20-8.
20-2.
20-3.
20-4.
20-5.
20-6.
20-7.
Professional Geologist (Key)
Professional Engineer (Key)
Administrative
Field Technician (Key)
P.E. Review and Certification of Sufficiency of
Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance
Recommendations Required for a Conditional
NFA
P.E. Project Oversight for Remediation System
Operation and Maintenance
P.E. Project Oversight for Short Term or
Episodic Remediation System Operation -
Weekly Basis
P.E. Project Oversight for Short Term or
Episodic Remediation System Operation - Daily
Basis
P.E. Project Oversight for Remediation System
Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Medium System
P.E. Project Oversight for Remediation System
Integration and Startup - Small System
P.E. Project Oversight for Remediation
Technology Pilot Testing
Assistant Scientist/Technical Specialist
Scientist/Technical Specialist (Key)
Hydrogeologist/Modeler (Key)
Geologist/Geoscientist (Key)
Engineer (Key)
Project Manager (Key)
P.G. Review, Evaluation and Certification of
Plans and Project Oversight for Installation of
Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean
Fill Required for a Conditional NFA
21-12.
21-6.a.
21-6.b.
21-6.c.
21-6.d.
21-7.a.
21-7.b.
21-8.
21-9.
21-2.
21-5.
+7.69%
+6.67%
+7.69%
+7.69%
+8.00%
+8.00%
+7.76%
+7.79%
+8.00%
+8.00%
+8.00%
+8.00%
450.00$ $ 486.00
600.00$ $ 648.00
500.00$ $ 540.00
450.00$ $ 485.00
380.00$ $ 410.00
570.00$ $ 615.00
400.00$ $ 430.00
400.00$ $ 430.00
500.00$ $ 540.00
1,350.00$ $ 1,450.00
1,100.00$ $ 1,185.00
500.00$ $ 540.00
550.00$ $ 590.00
680.00$ $ 730.00
545.00$ $ 585.00
+8.00%
+8.00%
+7.78%
+7.89%
+7.89%
+7.50%
+7.50%
+8.00%
+7.41%
+7.73%
+8.00%
+7.27%
+7.35%
+7.34%
P.E. Review, Evaluation and Certification of a
Level 1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a
Pilot Test Report
P.E. Review, Evaluation and Certification of a
Pilot Test Plan
P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring
Report
P.E. Review, Evaluation and Certification of a
Non-Annual Natural Attenuation or Post RA
Monitoring Report That Includes a
Recommendation for NFA or a
Recommendation to Modify the Approved
Monitoring Plan
P.E. Review, Evaluation and Certification of a
Level 2 Natural Attenuation Monitoring Plan
P.G. or P.E. Review, Evaluation and
Certification of a Receptor and Exposure
Pathway Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a Supplemental Site Assessment
Report
P.G. or Qualified P.E. Review, Evaluation and
Certification of a General Site Assessment
Report
P.G. or P.E. Review, Evaluation and
Certification of a Soil Source Removal Report
That Includes a Recommendation for NFA
P.E. Review, Evaluation and Certification of a
Level 4 Limited Scope Remedial Action Plan or
RAP Modification Plan
P.E. Review, Evaluation and Certification of a
Level 3 Limited Scope Remedial Action Plan or
RAP Modification Plan
P.E. Review, Evaluation and Certification of a
Level 2 Limited Scope Remedial Action Plan or
RAP Modification Plan
P.E. Review, Evaluation and Certification of a
Level 1 Limited Scope Remedial Action Plan or
RAP Modification Plan
P.E. Review, Evaluation and Certification of a
Level 2 Remedial Action Plan
21-13.
21-15.
21-16.
21-17.
21-18.
21-19.
21-20.
21-21.
21-22.
21-23.
21-24.
21-25.
21-26.
21-27.
21-28.
+8.00%
500.00$ $ 540.00
650.00$ $ 700.00
500.00$ $ 540.00
715.00$ $ 770.00
400.00$ $ 430.00
450.00$ $ 485.00
675.00$ $ 725.00
400.00$ $ 430.00
+8.00%
+7.69%
+8.00%21-31.
21-32.
21-33.
21-34.
21-35.
21-36.
P.E. Review, Evaluation, and Certification of
Annual PARM Report
P.E. Review, Evaluation, and Certification of
Construction Drawings
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That
Includes a Recommendation for System
Modification or Significant Change in the
Course of Action
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Notes:
P.G or P.E. Review, Evaluation and Certification of a Remedial Action General Report
P.E. Review, Evaluation and Certification of an
Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a
Non-Annual Operation and Maintenance Report
That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a
Remedial Action Startup Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of As-
Built Drawings (P.E. sealed red lined modifications)
21-29.
21-30.
+7.69%
+7.50%
+7.78%
+7.41%
+7.50%
6/1/2023
Justin Wolfe Digitally signed by Justin Wolfe Date: 2023.06.02 14:59:02 -04'00'
Jamie Lopez Digitally signed by Jamie Lopez Date: 2023.06.05 09:32:12 -04'00'
File details come from the government source that posted it. Updated .