Document Summary

This document is Amendment No. 10 to the DEP Restated Agency Term Contract No. GC801, executed between the Florida Department of Environmental Protection (FDEP) and ECOTECH ENVIRONMENTAL SERVICES, INC., effective June 4, 2021. The contract pertains to petroleum contamination site response action services in the North Region of Florida. The amendment modifies rates previously established under the original contract dated February 24, 2014, and updates the Rate Schedule (Attachment D) to Version 3.3.

Amendment No. 10 implements rate adjustments for 173 pay items covering petroleum restoration and environmental remediation services. The revisions include both rate increases and decreases, with increases not exceeding the maximum 5% threshold permitted under contract provision 11.B.ii. Rate increases range from +0.81% to +5.00% across items such as file reviews ($483.00 to $505.00), mobilization services, drilling and boring operations, well installation, sample collection, laboratory analysis, soil excavation, debris removal, equipment rental, and professional services. Rate decreases apply to specific items including water analysis services (decreasing from $250.00 to $200.00 for certain priority pollutant analyses) and petroleum storage tank removal services. All rate changes apply exclusively to new work assignments offered on or after the Rate Change Date of June 4, 2021, while pre-existing work assignments continue under the prior Rate Schedule (V3.2). Pre-Rate Change Date work assignments remain unaffected by these modifications.

View the file

Other files

File Type Posted
CN-370000-GC801-A16.pdf PDF
PC-370000-GC801.pdf PDF
CN-370000-GC801-A11.pdf PDF
CN-370000-GC801-A3.pdf PDF
CN-370000-GC801-A4.pdf PDF
CN-370000-GC801-A5.pdf PDF
CN-370000-GC801-CMC3.pdf PDF
CN-370000-GC801-CMC5.pdf PDF
CN-370000-GC801-CMC8.pdf PDF
CN-370000-GC801-A15E1.pdf PDF
CN-370000-GC801-A17E2.pdf PDF
CN-370000-GC801-A19.pdf PDF
CN-370000-GC801-A2.pdf PDF
CN-370000-GC801-A7.pdf PDF
CN-370000-GC801-A8.pdf PDF
CN-370000-GC801-AR1.pdf PDF
CN-370000-GC801-CMC.pdf PDF
CN-370000-GC801-CMC2.pdf PDF
CN-370000-GC801-CMC6.pdf PDF
CN-370000-GC801-A12.pdf PDF
CN-370000-GC801-A13.pdf PDF
CN-370000-GC801-A14.pdf PDF
CN-370000-GC801-A18.pdf PDF
CN-370000-GC801-A6.pdf PDF
CN-370000-GC801-A9.pdf PDF
CN-370000-GC801-CMC4.pdf PDF
CN-370000-GC801-CMC7.pdf PDF
CN-370000-GC801-CO1.pdf PDF
CN-370000-GC801.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.2) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.2) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and

WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC801 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and ECOTECH

ENVIRONMENTAL SERVICES, INC. (hereinafter "Contractor") executed on February 24, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC801

RATE INCREASE AND DECREASE

AMENDMENT NO. 10

Amendment No. 10

DEP Agency Term Contract No. GC801

NOW THEREFORE, the parties agree as follows:

Amendment No. 10

DEP Agency Term Contract No. GC801

3.

4.

5.

6.

Attachment D, Rate Schedule (V3.3) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.3) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change

Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

Pre-existing

Rate

Agreed

New Rate (1)

483.00$ $ 505.00

285.00$ $ 290.00

345.00$ $ 360.00

360.00$ $ 375.00

480.00$ $ 500.00

240.00$ $ 250.00

660.00$ $ 690.00

480.00$ $ 500.00

785.00$ $ 820.00

920.00$ $ 960.00

5,785.00$ $ 6,050.00

9,920.00$ $ 10,000.00

24.00$ $ 25.00

27.80$ $ 29.00

33.50$ $ 35.00

38.50$ $ 40.00

31.20$ $ 32.75

33.50$ $ 35.00

42.25$ $ 44.25

54.30$ $ 57.00

26.25$ $ 27.00

+4.97%

+4.48%

+4.73%

+4.97%

+2.86%

+4.17%

+4.32%

+4.48%

+4.58%

+0.81%

5-6.

5-17.

5-20.

6-1.

5-12.

5-15.

5-16.

Pay

Item

No.

1-1.

1-3.

1-5.

3-14.a.

3-8.a.

File Review

Notice of Discovery of Contamination Package

(Initial or TPOC)

Off-Site Property Access Agreement

Receptor Survey and Exposure Pathway

Identification (excludes report)

Site Reconnaissance/Field Measurement Visit

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to

100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

Well Installation - 1 inch diameter

Description

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

2-1.

2-2.

3-1.

3-2.

3-3.

3-4.

5-9.

5-10.

Est %

Rate

Change (2)

+4.55%

+1.75%

+4.35%

+4.17%

+4.17%

+4.17%

+4.55%

+4.17%

+4.46%

+4.35%

+3.90%

42.00$ $ 44.00

96.50$ $ 101.30

46.20$ $ 48.50

151.50$ $ 159.00

575.00$ $ 600.00

365.00$ $ 380.00

575.00$ $ 600.00

160.00$ $ 168.00

230.00$ $ 240.00

57.75$ $ 60.00

60.60$ $ 63.50

29.50$ $ 30.00

42.00$ $ 44.00

55.00$ $ 57.75

42.00$ $ 44.00

250.00$ $ 200.00

250.00$ $ 200.00

23.00$ $ 24.00

23.00$ $ 24.00

47.00$ $ 48.00

93.70$ $ 94.00

10.00$ $ 9.00

+2.13%

+0.32%

-20.00%

-20.00%

+4.35%

+4.35%

+4.76%

+5.00%

+4.11%

+4.35%

+5.00%

+4.35%

+3.90%

+4.79%

+1.69%

+4.95%

+4.35%

+4.76%

+4.97%

+4.98%

9-34.

9-35.

9-27.

9-41.a.

9-44.a.

6-4.

6-3.a.

6-3.b.

Sheet Piling Rental for > 20 feet deep Excavation

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter (vertical)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA

8021 or EPA 8260)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA

8270)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Vapor/Ambient Air Sample Collection - Passive

Dosimeter, Sorbent Tube, Tedlar

TM

Bag (or

Equivalent)

Free Product Gauging & Bailing

Soil, Volatile Organic Halocarbons (EPA 8021 or

EPA 8260)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Above Grade Well Completion

Well Installation - 6 inch diameter

6-10.

6-11.

7-6.

8-1.

8-2.

Installation of Well Vault - 2 x 2 x 2 foot

7-5.

Free Product Sample Collection

Monitoring Well Sampling with Water Level, > 100 foot depth

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Removal of Well Vault - 4 x 4 x 2 foot

Removal of Well Vault - 2 x 2 x 2 foot

9-2.

9-3.

8-5.

8-8.

8-9.

9-79.

9-68.

10-2.c.

+4.76%

-10.00%

18.50$ $ 15.00

28.85$ $ 30.25

21.50$ $ 22.50

109.00$ $ 114.00

89.25$ $ 93.50

30.00$ $ 31.50

29.00$ $ 30.45

54.60$ $ 57.30

50.00$ $ 52.00

5,092.50$ $ 5,345.00

8,000.00$ $ 7,500.00

10,500.00$ $ 10,000.00

2.40$ $ 2.52

2.40$ $ 2.52

40.00$ $ 42.00

33.50$ $ 35.00

169.00$ $ 175.00

24.15$ $ 25.35

36.35$ $ 38.00

194.00$ $ 200.00

2.08$ $ 2.15

7.80$ $ 8.15

2.08$ $ 2.15

1.45$ $ 1.50

0.38$ $ 0.39

+4.97%

+4.54%

+3.09%

+3.37%

+4.49%

+3.37%

+3.45%

+2.63%

+4.96%

+4.00%

-6.25%

-4.76%

+5.00%

+5.00%

+5.00%

+4.48%

+3.55%

10-15.

10-16.

12-8.

11-3.

11-4.

12-1.

12-2.

12-15.

10-20.

13-2.

13-3.

13-4.

13-5.

13-7.

10-17.

10-14.

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Grass - Seed and Mulch

Crushed Lime Rock Cover - 2 inch thickness

Transport Petroleum Impacted Soil (bulk) > 100 miles

Transport and Disposal of Petroleum Product

(includes drum)

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport and Disposal of Petroleum Impacted Soil

(includes drum)

Transport and Disposal of Clean Concrete

Loading, Transport and Disposal/Recycle Clean

Overburden

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Removal and Loading of Asphalt and/or Concrete -up to 4 inch thickness

Remove and Dispose Petroleum Storage Tank - >

10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - >

5,000 to 10,000 gal. capacity

#57 Stone

Pea Gravel

Clean Backfill Material, Compaction and Testing

(includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) ≤ 300 cubic yards

Dewatering System, up to 12 well points (includes installation)

LDA Excavation and Loading Without Casing > 300 cubic yards

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

Conventional Soil Excavation and Loading > 300 cubic yards

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation10-2.d.

10-7.

10-8.

10-9.

10-10.

12-3.

12-4.

12-6.

12-7.

-18.92%

+4.85%

+4.65%

+4.59%

+4.76%

+5.00%

+5.00%

+4.95%

4,300.00$ $ 4,500.00

8,500.00$ $ 8,900.00

4,565.00$ $ 4,790.00

5,290.00$ $ 5,550.00

6,280.00$ $ 6,590.00

362.00$ $ 380.00

345.00$ $ 360.00

230.00$ $ 240.00

240.00$ $ 250.00

240.00$ $ 250.00

240.00$ $ 250.00

4,630.00$ $ 4,800.00

4,000.00$ $ 3,500.00

4,400.00$ $ 4,620.00

2,550.00$ $ 2,650.00

5,450.00$ $ 5,700.00

2,430.00$ $ 2,500.00

6,930.00$ $ 7,000.00

5,000.00$ $ 4,000.00

2,545.00$ $ 2,660.00

2,660.00$ $ 2,750.00

3,300.00$ $ 3,450.00

800.00$ $ 700.00

4,200.00$ $ 4,300.00

9,000.00$ $ 8,000.00

-12.50%

+2.38%

-11.11%

+5.00%

-12.50%

+3.92%

+4.59%

+2.88%

+1.01%

-20.00%

+4.52%

+3.38%

+4.55%

+4.65%

+4.71%

15-4.a.

15-4.b.

15-4.c.

Groundwater Treatment System - Stand Alone

Medium - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Small -

Long Term > 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity -

Long Term > 6 mos.

Air Sparging/Vapor Extraction Pilot Test -

Additional Time

System O&M Package - Extra Large

System O&M Package - Large

System O&M Package - Medium

AS/MPE System Package - Medium

MPE System Package - Medium

MPE System Package - Medium

AS/SVE System Package - Medium

AS/SVE System Package - Medium

Air Sparge System Package - Medium

Groundwater Treatment System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

Multi-Phase Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test - Additional

Time

Vapor Extraction Pilot Test - Additional Time

Air Sparging or Biosparging Pilot Test - Additional

Time

Groundwater Recovery System Pilot Test -

Additional Time

System Installation/Integration/Startup - 1

Technology Component - 21-30 Recovery/Treatment

Points

System Installation/Integration/Startup - 1

Technology Component - 11-20 Recovery/Treatment

Points

System Installation/Integration/Startup - 1

Technology Component - 1-10 Recovery/Treatment

Points

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)14-4.

14-5.

16-2.

16-4.

16-17.

16-6.

16-8.

16-10.

16-12.

16-13.

16-20.

16-21.

16-22.

16-23.

16-24.

16-25.

18-4.

18-6.

18-7.

17-2.

17-3.

17-4.

+4.97%

+4.35%

+4.35%

+4.17%

+4.17%

+4.17%

+3.67%

+4.93%

+4.91%

+4.94%

12,000.00$ $ 11,000.00

2,500.00$ $ 2,200.00

3,150.00$ $ 3,300.00

3,300.00$ $ 3,450.00

4,340.00$ $ 4,550.00

3,100.00$ $ 3,200.00

4,860.00$ $ 5,000.00

7,000.00$ $ 6,500.00

5,600.00$ $ 5,500.00

330.75$ $ 340.00

4,000.00$ $ 3,800.00

4,400.00$ $ 4,200.00

4,300.00$ $ 4,200.00

6,000.00$ $ 5,500.00

5,900.00$ $ 5,700.00

8,800.00$ $ 8,500.00

1,800.00$ $ 1,850.00

2,425.00$ $ 2,545.00

1,730.00$ $ 1,815.00

1,000.00$ $ 1,040.00

1,000.00$ $ 1,040.00

575.00$ $ 600.00

4,800.00$ $ 5,000.00

7,822.50$ $ 7,900.00

3,307.50$ $ 3,425.00

2,450.00$ $ 2,550.00

+0.99%

+3.55%

+4.08%

+4.17%

-5.00%

-4.55%

-2.33%

-8.33%

-3.39%

+2.80%

+2.78%

+4.95%

+4.91%

+4.00%

+4.00%

+4.35%

+4.84%

+3.23%

+2.88%

-7.14%

-1.79%

-8.33%

-12.00%

+4.76%

18-31.

18-24.

18-25.

18-27.

18-39.

Level 4 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP

Modification Plan

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Level 2 Natural Attenuation Monitoring Plan

Receptor and Exposure Pathway Report

Soil Vapor Extraction (SVE) System - Large - Short

Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Medium -

Long Term > 6 Months

Supplemental Site Assessment Report

General Site Assessment Report

Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Large - Long

Term > 6 Months

Soil Vapor Extraction (SVE) System - Medium -

Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small - Short

Term ≤ 6 Months

Carbon Off Gas Treatment - Add On - Medium -

Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Short

Term ≤ 6 mos.

MPE System - Large - Short Term ≤ 6 mos.

Air Sparge System - Small - Short Term ≤ 6 mos.

MPE System - Medium - Short Term ≤ 6 mos.

MPE System - Small - Long Term > 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Large -

Short Term ≤ 6 mos.

Construction Drawings and Specs Report

Remedial Action Startup Report

18-9.

18-22.

18-20.

18-11.

18-18.

18-57.

19-1.

19-3.

19-4.

19-5.

19-6.

19-7.

19-19.

18-47.

18-49.

18-50.

18-51.

18-52.

19-17.

19-15.

19-16.

+4.55%

-3.41%

1,650.00$ $ 1,700.00

2,940.00$ $ 3,000.00

565.00$ $ 590.00

350.00$ $ 360.00

275.00$ $ 285.00

1,200.00$ $ 1,100.00

120.00$ $ 125.00

115.00$ $ 120.00

40.00$ $ 42.00

115.15$ $ 120.90

115.15$ $ 120.90

700.00$ $ 500.00

650.00$ $ 680.00

625.00$ $ 600.00

455.00$ $ 475.00

498.75$ $ 450.00

475.00$ $ 400.00

415.00$ $ 435.00

1,145.00$ $ 1,200.00

+5.00%

+4.99%

+4.99%

-28.57%

-4.00%

+4.40%

21-2.

21-22.

21-23.

21-11.

21-17.

21-20.

21-7.a.

21-9.

21-10.

P.E. Design and Certification of Plans and Project

Oversight of Installation for Engineering Controls

(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA

Project Manager (Key)

Program Manager (Key)

Interim Assessment Report

Well Abandonment/Site Restoration Report

Free Product Recovery Report

Remedial Action Interim Report

Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or Non-

Annual

P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report

P.G. Review and Certification of Sufficiency of

Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Review and Certification of Sufficiency of

Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations

Required for a Conditional NFA

P.E. Project Oversight for Short Term or Episodic

Remediation System Operation - Daily Basis

P.E. Review, Evaluation and Certification of a Level

1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a Pilot

Test Report

P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report

Professional Geologist (Key)

Professional Engineer (Key)

Administrative

19-21.

19-22.

19-24.

19-25.

20-10.

21-1.

19-26.

19-27.

20-1.

20-2.

+4.82%

+4.80%

+3.03%

+2.04%

+4.42%

+2.86%

+3.64%

-8.33%

+4.17%

+4.35%

+4.62%

-9.77%

-15.79%

915.00$ $ 960.00

570.00$ $ 500.00

570.00$ $ 500.00

570.00$ $ 595.00

455.00$ $ 475.00

415.00$ $ 435.00

625.00$ $ 650.00 +4.00%

21-24.

21-25.

21-26.

21-27.

21-28.

P.E. Review, Evaluation and Certification of a Level

4 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

3 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

2 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

1 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

2 Remedial Action Plan

P.E. Review, Evaluation and Certification of an

Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Non-

Annual Operation and Maintenance Report That

Includes Significant Proposed Changes to the

Approved RAP

Notes:

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

21-31.

21-32.

+4.92%

-12.28%

-12.28%

+4.39%

+4.40%

+4.82%

John Truitt Digitally signed by John Truitt Date: 2021.05.27 15:49:43 -04'00'

John Truitt Deputy Secretary (see signature block)

6/4/2021

Jamie Lopez 6/4/2021 Jamie Luten Lopez

Digitally signed by Jamie Luten Lopez Date: 2021.06.04 13:04:07 -04'00'

PAY

ITEM

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

1.

1-1. Per Review $ 400.00 $ 483.00 $ 505.00

1-2. Per Site $ 300.00 $ 300.00 $ 300.00

1-2.a. Per Site Not Applicable $ - $ -

1-3. Per Package $ 250.00 $ 285.00 $ 290.00

1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-5. Per Agreement $ 300.00 $ 345.00 $ 360.00

1-5.a. Per Agreement Not Applicable $ - $ -

1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-7. % Surcharge Not Applicable $ 0.06 $ 0.06

2.

2-1. Per Visit $ 300.00 $ 360.00 $ 375.00

2-2. Per Survey $ 400.00 $ 480.00 $ 500.00

2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

2-4. Per Day $ 600.00 $ 661.50 $ 661.50

3.

3-1. Per Round Trip $ 200.00 $ 240.00 $ 250.00

3-2. Per Round Trip $ 600.00 $ 660.00 $ 690.00

3-3. Per Round Trip $ 400.00 $ 480.00 $ 500.00

3-4. Per Round Trip $ 650.00 $ 785.00 $ 820.00

3-5. Per Round Trip $ 200.00 $ 210.00 $ 210.00

3-6. Per Round Trip $ 300.00 $ 315.00 $ 315.00

DESCRIPTION

OFFICE ACTIVITIES

File Review

Site Health & Safety Plan

Site Health & Safety Plan for Continued Work at no cost to FDEP

Notice of Discovery of Contamination Package (Initial or TPOC)

Site Reconnaissance/Field Measurement Visit

Receptor Survey and Exposure Pathway Identification (Excludes report)

Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)

Contractor Oversight for Non-Price Schedule Activities

MOBILIZATION

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items

Off-Site Property Access Agreement

Site Property Access Agreement for Source Property at no cost to FDEP

Project Specific Financial Guarantee Bond (if required by DEP)

6% Handling Fee for Cost Reimbursable Items

FIELD ACTIVITIES - GENERAL

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Work Trailer - > 100 miles each way

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

3-7. Per Round Trip $ 500.00 Not Applicable Not Applicable

3-7.a. Per Round Trip Not Applicable $ 660.00 $ 660.00

3-8. Per Round Trip $ 600.00 Not Applicable Not Applicable

3-8.a. Per Round Trip Not Applicable $ 920.00 $ 960.00

3-9. Per Round Trip $ 525.00 Not Applicable Not Applicable

3-9.a. Per Round Trip Not Applicable $ 945.00 $ 945.00

3-10. Per Round Trip $ 625.00 Not Applicable Not Applicable

3-10.a. Per Round Trip Not Applicable $ 1,575.00 $ 1,575.00

3-11. Per Round Trip $ 450.00 $ 540.00 $ 540.00

3-12. Per Round Trip $ 700.00 $ 840.00 $ 840.00

3-13. Per Round Trip $ 4,000.00 Not Applicable Not Applicable

3-13.a. Per Round Trip Not Applicable $ 5,785.00 $ 6,050.00

3-14. Per Round Trip $ 8,000.00 Not Applicable Not Applicable

3-14.a. Per Round Trip Not Applicable $ 9,920.00 $ 10,000.00

3-15. Per Round Trip $ 400.00 $ 460.00 $ 460.00

3-16. Per Round Trip $ 500.00 $ 575.00 $ 575.00

3-17. Per Round Trip $ 400.00 $ 400.00 $ 400.00

3-18. Per Round Trip $ 650.00 $ 600.00 $ 600.00

3-19. Per Round Trip Not Applicable $ 400.00 $ 400.00

3-20. Per Round Trip Not Applicable $ 650.00 $ 650.00

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

DPT Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

Drill Rig Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤

100 miles each way

Drill Rig Mobilization - > 100 miles each way

DPT Rig Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - ≤ 100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - > 100 miles each way

Drum Compactor mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - >

100 miles each way

Excavator Mobilization - ≤ 100 miles each way

Excavator Mobilization - > 100 miles each way

LDA Rig Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

LDA Rig Mobilization - > 100 miles each way

Drum Compactor mobilization - > 100 miles each way

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

4.

4-1.a.

Per Person, Per Day $ 80.00 $ 80.00 $ 80.00

4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00

5.

5-1.a. Per Spoon $ 35.00 Not Applicable Not Applicable

5-1.a.1. Per Spoon Not Applicable $ 36.75 $ 36.75

5-1.a.2. Per Spoon Not Applicable $ 47.25 $ 47.25

5-1.a.3. Per Spoon Not Applicable $ 57.75 $ 57.75

5-1.b. Per Core $ 110.00 $ 125.00 $ 125.00

5-1.c. Per Core $ 16.00 Not Applicable Not Applicable

5-2. Per Boring $ 150.00 $ 181.00 $ 181.00

5-3. Per Foot $ 10.00 Not Applicable Not Applicable

5-3.a. Full Day Not Applicable $ 2,700.00 $ 2,700.00

5-4. Per Foot $ 14.00 Not Applicable Not Applicable

5-5. Per Foot $ 24.00 Not Applicable Not Applicable

5-5.a. Full Day Not Applicable $ 1,730.00 $ 1,730.00

5-6. Per Foot $ 20.00 $ 24.00 $ 25.00

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet

Split Spoon Sampling – 2 foot (during boring) > 100 feet

Sonic Core Sampling - 5 or 10 foot (during boring)

DPT Core Sampling - 4 or 5 foot (during boring)

Hand Auger Boring ≤ 10 foot total depth

MEALS AND LODGING

Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current

State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with

Section 112.061, F.S.

DRILLING AND BORING

Split Spoon Sampling - 2 foot (during boring)

Direct Push Boring

Direct Push Technology (DPT) Rig and Equipment

Direct Push Boring with Cone Penetrometer Test Probe (CPT)

Direct Push Boring with Membrane Interface Probe (MIP)

DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT

Base Rate)

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

5-7. Per Foot $ 25.00 $ 30.15 $ 30.15

5-8. Per Foot $ 28.00 $ 33.50 $ 33.50

5-9. Per Foot $ 23.00 $ 27.80 $ 29.00

5-10. Per Foot $ 28.00 $ 33.50 $ 35.00

5-11. Per Foot $ 30.00 $ 34.50 $ 34.50

5-12. Per Foot $ 32.00 $ 38.50 $ 40.00

5-13. Per Foot $ 35.00 $ 42.00 $ 42.00

5-14. Per Foot $ 40.00 $ 44.00 $ 44.00

5-15. Per Foot $ 26.00 $ 31.20 $ 32.75

5-16. Per Foot $ 28.00 $ 33.50 $ 35.00

5-17. Per Foot $ 35.00 $ 42.25 $ 44.25

5-18. Per Foot $ 36.00 $ 43.30 $ 43.30

5-19. Per Foot $ 44.00 $ 48.00 $ 48.00

5-20. Per Foot $ 45.00 $ 54.30 $ 57.00

5-21. Per Foot $ 55.00 $ 63.50 $ 63.50

5-22. Per Foot $ 65.00 $ 71.50 $ 71.50

5-23. Per Foot $ 85.00 $ 95.00 $ 95.00

6.

6-1. Per Foot $ 22.00 $ 26.25 $ 27.00

6-2. Per Foot $ 27.00 Not Applicable Not Applicable

6-2.a. Per Foot Not Applicable $ 36.75 $ 36.75

6-2.b. Per Foot Not Applicable $ 80.00 $ 80.00

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

WELL INSTALLATION

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Well Installation - 1 inch diameter

Well Installation - 2 inch diameter

Well Installation - 2 inch diameter (Vertical)

Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

6-3. Per Foot $ 35.00 Not Applicable Not Applicable

6-3.a. Per Foot Not Applicable $ 42.00 $ 44.00

6-3.b. Per Foot Not Applicable $ 96.50 $ 101.30

6-4. Per Foot $ 40.00 $ 46.20 $ 48.50

6-5. Per Foot $ 36.00 $ 39.65 $ 39.65

6-6. Per Foot $ 38.00 $ 43.00 $ 43.00

6-7. Per Foot $ 48.00 $ 54.00 $ 54.00

6-8. Per Foot $ 53.00 $ 58.00 $ 58.00

6-9.a. Per Foot $ 5.00 $ 6.00 $ 6.00

6-9.b. Per Foot $ 6.00 $ 7.20 $ 7.20

6-9.c. Per Foot $ 8.00 $ 9.60 $ 9.60

6-9.d. Per Foot $ 10.00 $ 12.10 $ 12.10

6-10. Per Well $ 125.00 $ 151.50 $ 159.00

6-11. Per Vault $ 500.00 $ 575.00 $ 600.00

6-12. Per Vault $ 1,000.00 $ 1,150.00 $ 1,150.00

6-13. Per Well Not Applicable $ 155.00 $ 155.00

6-14. Per Well Not Applicable $ 300.00 $ 300.00

6-15. Per Well Not Applicable $ 350.00 $ 350.00

7.

7-1. Per Foot $ 16.00 $ 17.50 $ 17.50

Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling)

Well Installation - 6 inch diameter

Surface Casing - 6 inch diameter

Surface Casing - 8 inch diameter

Surface Casing - 10 inch diameter

Surface Casing - 12 inch diameter

Well Installation - 4 inch diameter

Well Installation - 4 inch diameter (Vertical)

Installation of Well Vault - 4 x 4 x 2 foot

Well Redevelopment

Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

WELL ABANDONMENT

Grout and Abandon Well, 1 to 2 inch diameter

Additional Well Screen > 20 feet - 1 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 6 inch diameter

Above Grade Well Completion

Installation of Well Vault - 2 x 2 x 2 foot

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

7-2. Per Foot $ 18.00 $ 19.50 $ 19.50

7-3. Per Foot $ 22.00 $ 24.00 $ 24.00

7-4. Per Foot $ 24.00 $ 27.00 $ 27.00

7-5. Per Vault $ 325.00 $ 365.00 $ 380.00

7-6. Per Vault $ 500.00 $ 575.00 $ 600.00

7-7. Per Well Not Applicable $ 160.00 $ 160.00

8.

8-1. Per Well $ 140.00 $ 160.00 $ 168.00

8-2. Per Well $ 200.00 $ 230.00 $ 240.00

8-3. Per Well $ 95.00 $ 99.75 $ 99.75

8-4. Per Sample $ 100.00 $ 105.00 $ 105.00

8-5. Per Sample $ 50.00 $ 57.75 $ 60.00

8-6. Per Sample $ 80.00 $ 84.00 $ 84.00

8-7. Per Well $ 20.00 $ 22.00 $ 22.00

8-8. Per Well $ 50.00 $ 60.60 $ 63.50

8-9. Per Sample $ 25.00 $ 29.50 $ 30.00

8-10. Per Sample $ 50.00 $ 60.00 $ 60.00

8-11. Per Sampling Event Not Applicable $ 125.00 $ 125.00

8-12. Per Well Not Applicable $ 42.00 $ 42.00

8-13. Per Well Not Applicable $ 42.00 $ 42.00

SAMPLE COLLECTION AND FIELD TESTING

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Monitoring Well Sampling with Water Level, > 100 foot depth

Domestic Water Well Sampling

Other Water Sampling

Free Product Sample Collection

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 6 inch diameter

Removal of Well Vault - 2 x 2 x 2 foot

Removal of Well Vault - 4 x 4 x 2 foot

Removal of Well Pad and Manhole

Survey Latitude/Longitude of Existing Monitor Wells

Survey Latitude/Longitude of New Monitor Wells

Soil/Sediment Sample Collection

Water Level or Free Product Gauging

Free Product Gauging & Bailing

Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, Tedlar

TM

Bag

(or Equivalent)

Vapor/Ambient Air Sample Collection - SUMMA

TM

Canister (or Equivalent)

Electronic Data Deliverables (EDD)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

8-14. Per Sample Not Applicable $ 19.00 $ 19.00

9.

9.A.

9-1. Per Sample $ 521.00 $ 450.00 $ 450.00

9-2. Per Sample $ 35.00 $ 42.00 $ 44.00

9-3. Per Sample $ 50.00 $ 55.00 $ 57.75

9-4. Per Sample $ 72.00 $ 79.00 $ 79.00

9-5. Per Sample $ 82.00 $ 90.00 $ 90.00

9-6. Per Sample $ 100.00 $ 84.00 $ 84.00

9-7. Per Sample $ 280.00 $ 250.00 $ 250.00

9-8. Per Sample $ 66.00 $ 72.00 $ 72.00

9-8.a. Per Sample Not Applicable $ 250.00 $ 250.00

9-9. Per Sample $ 60.00 $ 60.00 $ 60.00

9-10. Per Sample $ 95.00 $ 80.00 $ 80.00

9-11. Per Sample $ 11.50 $ 12.50 $ 12.50

9-12. Per Sample $ 11.50 $ 12.50 $ 12.50

Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing

(discarded).

LABORATORY ANALYSIS

SOIL/SEDIMENT ANALYSIS

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-

Priority Pollutant Organics (Multiple Methods)

Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)

Soil, PCBs [or Aroclors] (EPA 8082)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA

8270 list [e.g., EPA 8081/8082 + EPA 8270])

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

9-13. Per Sample $ 11.50 $ 12.50 $ 12.50

9-14. Per Sample $ 11.50 $ 12.50 $ 12.50

9-15. Per Sample $ 55.00 $ 45.00 $ 45.00

9-16. Per Sample $ 65.00 $ 45.00 $ 45.00

9-17. Per Sample $ 50.00 $ 45.00 $ 45.00

9-18. Per Sample $ 30.00 $ 34.50 $ 34.50

9-19. Per Sample $ 15.00 $ 10.00 $ 10.00

9-20. Per Sample $ 30.00 $ 31.50 $ 31.50

9-21. Per Sample $ 170.00 $ 175.00 $ 175.00

9-22. Per Sample $ 170.00 $ 175.00 $ 175.00

9-23. Per Sample $ 85.00 $ 70.00 $ 70.00

9-24. Per Sample $ 150.00 $ 157.50 $ 157.50

9.B.

9-25. Per Sample $ 288.00 $ 260.00 $ 260.00

9-26. Per Sample $ 470.00 $ 420.00 $ 420.00

9-27. Per Sample $ 35.00 $ 42.00 $ 44.00

Soil, Moisture Content (ASTM D2216-10)

Soil, Texture, (See Gee 7 Bauder [1966])

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)

Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)

Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312)

Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -

96e1 or ASTM D2937-10)

WATER ANALYSIS

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple

Methods)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-

Priority Pollutant Organics (Multiple Methods)

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

9-28. Per Sample $ 50.00 $ 57.50 $ 57.50

9-29. Per Sample $ 50.00 $ 60.00 $ 60.00

9-30. Per Sample $ 82.00 $ 90.00 $ 90.00

9-31. Per Sample $ 37.00 $ 42.00 $ 42.00

9-31.a. Per Sample Not Applicable $ 52.50 $ 52.50

9-32. Per Sample $ 100.00 $ 80.00 $ 80.00

9-33. Per Sample $ 100.00 $ 80.00 $ 80.00

9-34. Per Sample $ 315.00 $ 250.00 $ 200.00

9-35. Per Sample $ 315.00 $ 250.00 $ 200.00

9-36. Per Sample $ 66.00 $ 72.50 $ 72.50

9-37. Per Sample $ 60.00 $ 63.00 $ 63.00

9-38. Per Sample $ 10.00 $ 11.00 $ 11.00

9-39. Per Sample $ 10.00 $ 11.00 $ 11.00

9-40. Per Sample $ 10.00 $ 11.00 $ 11.00

9-41. Per Sample $ 10.00 $ 11.00 $ 11.00

9-41.a. Per Sample Not Applicable $ 23.00 $ 24.00

9-42. Per Sample $ 20.00 $ 20.00 $ 20.00

9-43. Per Sample $ 10.00 $ 10.50 $ 10.50

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)

Water, Priority Pollutant Volatile Organics (EPA 8260)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for

NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)

Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA

8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)

Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

9-44. Per Sample $ 10.00 $ 10.50 $ 10.50

9-44.a. Per Sample Not Applicable $ 23.00 $ 24.00

9-45. Per Sample $ 10.00 $ 11.00 $ 11.00

9-46. Per Sample $ 10.00 $ 11.00 $ 11.00

9-47. Per Sample $ 10.00 $ 11.00 $ 11.00

9-48. Per Sample $ 10.00 $ 11.00 $ 11.00

9-49. Per Sample $ 15.00 $ 13.00 $ 13.00

9-50. Per Sample $ 13.50 $ 15.00 $ 15.00

9-51. Per Sample $ 13.50 $ 15.00 $ 15.00

9-52. Per Sample $ 13.50 $ 15.00 $ 15.00

9-53. Per Sample $ 13.50 $ 15.00 $ 15.00

9-54. Per Sample $ 13.50 $ 15.00 $ 15.00

9-55. Per Sample $ 13.50 $ 15.00 $ 15.00

9-56. Per Sample $ 20.00 $ 22.00 $ 22.00

9-57. Per Sample $ 13.50 $ 15.00 $ 15.00

9-58. Per Sample $ 10.00 $ 11.00 $ 11.00

9-59. Per Sample $ 12.00 $ 12.60 $ 12.60

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI

C or SM 4500CI E)

Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or

SM 4500-NO3 F)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)

Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)

Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA

9056, SM 4500-PE or SM 4500-PF)

Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

9-60. Per Sample $ 13.50 $ 14.50 $ 14.50

9-61. Per Sample $ 30.00 $ 33.00 $ 33.00

9-62. Per Sample $ 750.00 $ 735.00 $ 735.00

9-63. Per Sample $ 750.00 $ 735.00 $ 735.00

9-64. Per Sample $ 200.00 $ 185.00 $ 185.00

9-65. Per Sample $ 400.00 $ 300.00 $ 300.00

9-66. Per Sample $ 150.00 $ 84.00 $ 84.00

9-67. Per Sample $ 300.00 $ 200.00 $ 200.00

9-78. Per Sample Not Applicable $ 68.25 $ 68.25

9-79. Per Sample Not Applicable $ 47.00 $ 48.00

9-80. Per Sample Not Applicable $ 80.00 $ 80.00

9.C.

9-68. Per Sample $ 85.00 $ 93.70 $ 94.00

9-69. Per Sample $ 225.00 $ 210.00 $ 210.00

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:

Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]

(EPA 2006.0/2007.0)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA

9038, EPA 9056 or SM 4500-SO4 C)

Water, Heterotrophic Plate Count (SM 9215 B)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:

Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA

2000.0/2002.0)

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, Methane (EPA SOP RSK-175)

AIR ANALYSIS

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Air, Volatile Organic Aromatics (EPA Method TO-15)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

9-70. Per Sample $ 225.00 $ 220.00 $ 220.00

9-71. Per Sample $ 275.00 $ 260.00 $ 260.00

9.D.

9-72. Per Sample $ 300.00 $ 250.00 $ 250.00

9-73. Per Sample $ 500.00 $ 425.00 $ 425.00

9.E.

9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable

9-75.

Percent

Surcharge

9-76.

Percent

Surcharge $ 0.50 $ 0.52 $ 0.52

9-77.

Percent

Surcharge $ 1.00 $ 1.05 $ 1.05

10.

10-1. Per Sq. Foot/Day $ 3.00 Not Applicable Not Applicable

10-1.a. Per Sq. Foot Not Applicable $ 27.50 $ 27.50

10-1.b. Per Sq. Foot/Day Not Applicable $ 4.40 $ 4.40

10-1.c. Per Sq. Foot/Week Not Applicable $ 9.00 $ 9.00

10-1.d. Per Sq. Foot/Month Not Applicable $ 16.00 $ 16.00

Air, Volatile Organic Compounds (EPA Method TO-17)

PRODUCT ANALYSIS

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High

Resolution GC/FID)

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)

OTHER ANALYSIS

Other Analysis, Not Otherwise Specified

Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.

SOIL SOURCE REMOVAL RELATED

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling Installation for ≤ 20 feet deep Excavation

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

10-2. Per Sq. Foot/Week $ 11.00 Not Applicable Not Applicable

10-2.a. Per Sq. Foot Not Applicable $ 36.75 $ 36.75

10-2.b. Per Sq. Foot/Day Not Applicable $ 5.00 $ 5.00

10-2.c. Per Sq. Foot/Week Not Applicable $ 10.00 $ 9.00

10-2.d. Per Sq. Foot/Month Not Applicable $ 18.50 $ 15.00

10-3. Per Sq. Foot/Month $ 20.00 Not Applicable Not Applicable

10-4. Per Sq. Foot/Day $ 4.00 Not Applicable Not Applicable

10-5. Per Sq. Foot/Week $ 12.00 Not Applicable Not Applicable

10-6. Per Sq. Foot/Month $ 30.00 Not Applicable Not Applicable

10-7. Per Cubic Yard $ 24.00 $ 28.85 $ 30.25

10-8. Per Cubic Yard $ 18.00 $ 21.50 $ 22.50

10-9. Per Cubic Yard $ 95.00 $ 109.00 $ 114.00

10-10. Per Cubic Yard $ 78.00 $ 89.25 $ 93.50

10-11.a. Per Cubic Yard $ 125.00 $ 143.00 $ 143.00

10-11.b. Per Cubic Yard $ 250.00 $ 270.00 $ 270.00

10-12.a. Per Cubic Yard $ 120.00 $ 134.00 $ 134.00

10-12.b. Per Cubic Yard $ 200.00 $ 230.00 $ 230.00

10-13. Per Cubic Yard $ 95.00 $ 109.00 $ 109.00

10-14. Per Cubic Yard $ 25.00 $ 30.00 $ 31.50

10-15. Per Cubic Yard $ 24.00 $ 29.00 $ 30.45

10-15.a. Per Cubic Yard Not Applicable $ 24.00 $ 24.00

10-15.b. Per Cubic Yard Not Applicable $ 22.00 $ 22.00

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling Installation for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Conventional Soil Excavation and Loading > 300 cubic yards

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

LDA Excavation and Loading Without Casing > 300 cubic yards

LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards

LDA Excavation and Loading With Driven Casing < 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling for > 20 feet deep excavation (per square foot)

Sheet Piling for > 20 feet deep excavation (per sqyuare foot)

Sheet Piling for > 20 feet deep excavation (per square foot)

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

LDA Excavation and Loading With Surface Casing > 300 cubic yards

LDA Excavation and Loading With Driven Casing > 300 cubic yards

Flowable Fill Concrete and Installation

Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

10-16. Per Ton $ 48.00 $ 54.60 $ 57.30

10-17. Per Ton $ 44.00 $ 50.00 $ 52.00

10-18. Per Day $ 2,500.00 $ 3,020.00 $ 3,020.00

10-19. Per Day $ 100.00 $ 121.26 $ 121.26

10-20. Per Week $ 4,400.00 $ 5,092.50 $ 5,345.00

10-21. Per Week $ 300.00 $ 341.24 $ 341.24

10-22. Per Month $ 12,000.00 $ 13,800.00 $ 13,800.00

10-23. Per Month $ 500.00 $ 525.00 $ 525.00

11.

11-1. Per Tank $ 4,000.00 $ 4,200.00 $ 4,200.00

11-2. Per Tank $ 4,500.00 $ 4,200.00 $ 4,200.00

11-3. Per Tank $ 8,500.00 $ 8,000.00 $ 7,500.00

11-4. Per Tank $ 10,000.00 $ 10,500.00 $ 10,000.00

12.

12-1. Per Square Foot $ 2.00 $ 2.40 $ 2.52

12-2. Per Square Foot $ 2.00 $ 2.40 $ 2.52

12-3. Per Ton $ 35.00 $ 40.00 $ 42.00

12-4. Per Ton $ 28.00 $ 33.50 $ 35.00

12-5. Per Ton $ 52.00 $ 50.00 $ 50.00

12-6. Per Drum $ 140.00 $ 169.00 $ 175.00

12-7. Per Ton $ 20.00 $ 24.15 $ 25.35

12-8. Per Ton $ 30.00 $ 36.35 $ 38.00

Pea Gravel

#57 Stone

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2) (includes installation)

Dewatering System, up to 12 well points (includes installation)

Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity

DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Loading, Transport and Disposal/Recycle Clean Overburden

Additional Dewatering System Well Points (2) (includes installation)

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2) (includes installation)

PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL

Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity

Transport and Disposal of Clean Concrete

Transport and Disposal of Mixed Debris

Transport and Disposal of Petroleum Impacted Soil (includes drum)

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport Petroleum Impacted Soil (bulk) > 100 miles

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V3.2)

REVISED

CONTRACTED

ITEM PRICE (V3.3)

DESCRIPTION

Region:

Contractor:

Contract #:

North

ECOTECH ENVIRONMENTAL SERVICES, INC.

GC801

DEP Restated Agency Term Contract No. GC801

Amendment No. 10

Attachment D (V3.3) - Rate Schedule

12-9. Per Ton $ 33.00 $ 34.65 $ 34.65

12-10. Per Ton $ 30.00 $ 33.00 $ 33.00

12-11. Per Ton $ 30.00 $ 33.00 $ 33.00

12-12. Per Ton $ 28.00 $ 31.00 $ 31.00

12-13. Per Drum $ 195.00 $ 185.00 $ 185.00

12-14. Per Gallon $ 1.00 $ 1.20 $ 1.20

12-15. Per Drum $ 185.00 $ 194.00 $ 200.00

12-16. Per Gallon $ 1.10 $ 1.20 $ 1.20

12-17. Per Week Not Applicable $ 750.00 $ 750.00

12-18. Per Week Not Applicable $ 260.00 $ 260.00

13.

13-1. Per Square Foot $ 6.50 $ 7.80 $ 7.80

13-2. Per Square Foot $ 1.75 $ 2.08 $ 2.15

13-3. Per Square Foot $ 6.50 $ 7.80 $ 8.15

13-4. Per Square Foot $ 1.75 $ 2.08 $ 2.15

13-5. Per Square Foot $ 1.25 $ 1.45 $ 1.50

13-6. Per Square Foot $ 1.25 $ 1.40 $ 1.40

13-7. Per Square Foot $ 0.35 $ 0.38 $ 0.39

14.

14-1. Per Foot $ 25.00 Not Applicable Not Applicable

14-1.a. Per Day Not Applicable $ 4,800.00 $ 4,800.00

14-2. Per Injection Point $ 300.00 Not Applicable Not Applicable

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons

Transport and Disposal of Petroleum Contact Water (includes drum)

Transport and Disposal of Petroleum Contact Water (bulk)

Transport and Disposal of Petroleum Product (includes drum)

Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons

Concrete Paving - 4 inch thickness (includes sub-base)

Concrete Paving - additional 1 inch thickness

Crushed Lime Rock Cover - 2 inch thickness

Grass - Sod

Grass - Seed and Mulch

IN-SITU INJECTION

Transport and Disposal of Petroleum Product (bulk)

Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container

Additional Rental of 20 Cubic Yard Roll-Off Container

RESURFACING

Asphalt Paving - 2 inch thickness (includes sub-base)

Asphalt…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .