CN-370000-GC790-A13.pdf

PDF 556 KB Posted

Attached to
Master Agreement FL|GC790|94246dcb36bcf3addbec2d51d8965cf3
Contract number
GC790
Issued by
Florida

About this file

Summary

This is Amendment No. 13 to the Florida Department of Environmental Protection (FDEP) Agency Term Contract No. GC790, executed between FDEP and AHS-GEAR LLC. The contract, originally executed on April 9, 2014, establishes an indefinite delivery vehicle for petroleum contamination site response action services in the North Region of Florida. The amendment was executed on May 13, 2024, by James D. Hirsch, President of AHS-GEAR LLC, and Jessica Kramer, Deputy Secretary of FDEP.

This amendment implements rate increases across 388 pay items in the contractor's rate schedule, with increases approved under contract provision 11.B and capped at the maximum allowable increase of 5 percent. The rate changes became effective June 10, 2024, for all new work assignments offered on or after the Rate Change Date, while pre-existing and previously offered work assignments continue under the prior rate schedule. The increases apply to mobilization fees, drilling and boring services, sampling and testing activities, well installation and management, environmental analysis and laboratory testing, excavation and removal services, remedial action systems, and professional services including engineering review and reporting. All other terms and conditions of the original contract remain in effect, with Amendment No. 13 superseding any conflicting provisions between the amendment and the base contract.

View the file

Other files

File Type Posted
CN-370000-GC790-A11.pdf PDF
CN-370000-GC790-A16.pdf PDF
CN-370000-GC790-A17.pdf PDF
CN-370000-GC790-A4.pdf PDF
CN-370000-GC790-A7.pdf PDF
CN-370000-GC790-CMC2.pdf PDF
CN-370000-GC790-A12E1.pdf PDF
CN-370000-GC790-AR1.pdf.crdownload CRDOWNLOAD file
CN-370000-GC790-CMC.pdf PDF
CN-370000-GC735-CO1.pdf PDF
CN-370000-GC790-A2.pdf PDF
CN-370000-GC790-A5.pdf PDF
CN-370000-GC790-A6.pdf PDF
CN-370000-GC790-AR1.pdf PDF
CN-370000-GC783-CMC3.pdf PDF
CN-370000-GC790-A10.pdf PDF
CN-370000-GC790-A14E2.pdf PDF
CN-370000-GC790-A3.pdf PDF
CN-370000-GC790-A8.pdf PDF
CN-370000-GC790-A9.pdf PDF
CN-370000-GC790-CMC1.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC790 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and AHS-GEAR

LLC (hereinafter "Contractor") executed on April 9, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC790

RATE INCREASE

AMENDMENT NO. 13

Amendment No. 13

DEP Agency Term Contract No. GC790

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 13

DEP Agency Term Contract No. GC790

4.

5.

6.

Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this

Amendment, Attachment D, Rate Schedule (V3.5) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate (1)

130.41$ $136.93

130.41$ $136.93

391.23$ $410.79

391.23$ $410.79

683.10$ $717.25

745.20$ $782.46

683.10$ $717.25

847.65$ $890.03

211.14$ $221.69

372.60$ $391.23

684.64$ $718.87

1,026.97$ $1,078.31

1,173.69$ $1,232.37

1,956.15$ $2,053.95

931.50$ $978.07

6,161.86$ $6,469.95

8,215.83$ $8,626.62

326.01$ $342.31

456.42$ $479.24

326.01$ $342.31

456.42$ $479.24

Est %

Rate

Change (2)

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

2-1.

2-2.

2-4.

3-2.

3-3.

3-4.

3-15.

3-16.

3-17.

3-18.

Description

3-12.

3-13.a.

Table 1. Listed Schedule of Pay Items with Rate Changes

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Work Trailer - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Contractor Oversight for Non-Price Schedule

Activities

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

Excavator Mobilization - > 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

File Review

Site Health & Safety Plan

Receptor Survey and Exposure Pathway Identification

(excludes report)

Site Reconnaissance/Field Measurement Visit

Mini Excavator/Loader (Bobcat

TM

) Mobilization - >

100 miles each way

Mini Excavator/Loader (Bobcat

TM

) Mobilization - ≤

100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Pay

Item No.

1-1.

1-2.

3-14.a.

3-5.

3-6.

3-7.a.

3-8.a.

3-9.a.

3-10.a.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

652.02$ $684.62

39.74$ $41.72

41.73$ $43.81

44.71$ $46.94

146.55$ $153.87

102.68$ $107.81

3,105.00$ $3,260.25

27.32$ $28.68

28.56$ $29.98

34.77$ $36.50

28.68$ $30.11

32.59$ $34.21

39.11$ $41.06

36.51$ $38.33

41.07$ $43.12

45.64$ $47.92

32.90$ $34.54

36.01$ $37.81

44.08$ $46.28

40.42$ $42.44

46.28$ $48.59

57.89$ $60.78

+4.99%

+4.98%

+4.99%

+5.00%

3-20.

5-9.

5-10.

5-11.

Hand Auger Boring ≤ 10 foot total depth

Sonic Core Sampling - 5 or 10 foot (during boring)

Split Spoon Sampling – 2 foot (during boring) > 100 feet

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

Direct Push Technology (DPT) Rig and Equipment

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, 50 to

100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to

100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

Split Spoon Sampling – 2 foot (during boring) 50 to

100 feet

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Drum Compactor mobilization - > 100 miles each way

5-1.a.1.

5-1.a.2.

5-1.a.3.

5-1.b.

5-2.

5-3.a.

5-6.

5-7.

5-17.

5-18.

5-19.

5-20.

5-12.

5-13.

5-14.

5-15.

5-16.

5-8.

+5.00%

+4.98%

+4.98%

+4.99%

+4.99%

+5.00%

+5.00%

+4.98%

+4.97%

+4.98%

+4.99%

+4.97%

+4.98%

+5.00%

+4.99%

+5.00%

+4.99%

+4.99%

71.06$ $74.61

84.09$ $88.29

104.94$ $110.18

24.63$ $25.86

41.73$ $43.81

167.67$ $176.05

45.64$ $47.92

39.74$ $41.72

30.11$ $31.61

39.74$ $41.72

52.16$ $54.76

64.58$ $67.80

124.20$ $130.41

260.82$ $273.86

310.50$ $326.02

15.04$ $15.79

17.43$ $18.30

22.57$ $23.69

29.41$ $30.88

136.62$ $143.45

202.13$ $212.23

223.56$ $234.73

62.10$ $65.20

65.19$ $68.44

24.84$ $26.08

74.52$ $78.24

65.19$ $68.44

8-3.

8-6.

8-7.

8-8.

8-11.

6-5.

Removal and Reinstallation of 12-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

Domestic Water Well Sampling

Monitoring Well Sampling with Water Level, > 100 foot depth

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Removal of Well Pad and Manhole

Removal and Reinstallation of 8-inch Manhole and

Well Pad (well pad/manhole has been damaged or destroyed)

6-6.

6-7.

6-8.

Well Redevelopment

7-2.

7-3.

7-4.

7-1.

6-13.

6-14.

6-15.

7-7.

8-1.

8-2.

Surface Casing - 8 inch diameter

Surface Casing - 6 inch diameter

Well Installation - 1 inch diameter

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Well Installation - 2 inch diameter (vertical)

Grout and Abandon Well, > 6 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, 1 to 2 inch diameter

Electronic Data Deliverables (EDD)

Free Product Gauging & Bailing

Water Level or Free Product Gauging

Soil/Sediment Sample Collection

Surface Casing - 12 inch diameter

Surface Casing - 10 inch diameter

Well Installation - 6 inch diameter

Well Installation - 4 inch diameter (vertical)

Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)

6-3.a.

6-4.

6-2.b.

5-21.

5-22.

5-23.

6-1.

6-2.a.

+4.98%

+4.98%

+4.98%

+4.98%

+4.99%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+4.98%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+4.96%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

+4.99%

21.50$ $22.57

562.62$ $590.75

62.59$ $65.71

75.20$ $78.96

109.77$ $115.25

195.60$ $205.38

273.24$ $286.90

84.75$ $88.98

15.43$ $16.20

15.43$ $16.20

15.43$ $16.20

15.43$ $16.20

32.59$ $34.21

412.09$ $432.69

74.32$ $78.03

55.19$ $57.94

68.31$ $71.72

+4.97%

+5.00%

+4.99%

+4.98%

+4.99%

+4.99%

+4.99%

+4.99%

+4.99%

8-14.

9-1.

9-2.

9-3.

9-5.

9-18.

9-7.

9-8.a.

9-10.

9-11.

9-12.

9-13.

9-14.

Soil, TRPH Fractionation (MADEP-EPH/VPH

Method or TPHCWG Direct Method)

Soil, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Soil, Volatile Organic Halocarbons (EPA 8021 or

EPA 8260)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Encore (25 gram) for SPLP Soil Sample Collection:

[Per Encore]. The cost will include the 25 gram

Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing

(discarded).

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, Volatile Organic Halocarbons, except EDB

(EPA 8021 or EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM

D2167-08, ASTM D2922-01, -04, -04e, -96e1 or

ASTM D2937-10)

Water, Used Oil/Unknown Product Group-Table D of

Ch. 62-780, F.A.C., except for non-Priority Pollutant

Organics (multiple methods)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020

[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471

[Mercury])

9-26.

9-28.

9-31.

9-31.a.

+4.98%

+5.00%

+4.98%

+5.00%

+4.99%

+5.00%

+5.00%

108.16$ $113.56

113.32$ $118.98

195.60$ $205.38

14.77$ $15.50

35.85$ $37.64

35.85$ $37.64

14.77$ $15.50

18.99$ $19.93

18.99$ $19.93

19.93$ $20.92

19.24$ $20.20

14.77$ $15.50

15.64$ $16.42

42.84$ $44.98

931.50$ $978.07

9-57.

9-58.

9-59.

9-61.

9-62.

9-49.

9-50.

9-54.

9-56.

Water, Priority Pollutant Volatile Organics [for

NPDES purposes only] (EPA 624)

Water, Priority Pollutant Extractable Organics-Base

Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, Priority Pollutant Volatile Organics (EPA

8260)

Water, Residue-nonfilterable [Total Suspended

Solids] (SM 2540 D)

Water, Residue-filterable [Total Dissolved Solids]

(SM 2540 C)

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-

PE or SM 4500-PF)

Water, Organic Carbon, Total (SM 5310 B, SM 5310

C or EPA 9060)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3

C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-

NH3 H)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM

2320 B)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA

6010 or EPA 6020)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate:

Ceriodaphnia dubia] (EPA 2000.0/2002.0)

Water, Heterotrophic Plate Count (SM 9215 B)

9-32.

9-41.

9-41.a.

9-44.a.

9-33.

9-34. +5.00%

+4.94%

+4.99%

+4.99%

+4.99%

+4.99%

+4.94%

+4.95%

+4.95%

+4.97%

+4.99%

+4.94%

+4.99%

+5.00%

931.50$ $978.07

186.30$ $195.61

186.30$ $195.61

74.52$ $78.24

186.30$ $195.61

64.54$ $67.76

50.19$ $52.69

81.97$ $86.06

113.02$ $118.67

329.13$ $345.58

186.30$ $195.61

186.30$ $195.61

12.42$ $13.04

8.69$ $9.12

37.26$ $39.12

+5.00%

+4.99%

+4.95%

+4.99%

9-66.

9-63.

9-64.

9-65.

10-2.a.

9-72.

9-73.

10-1.a.

10-1.d.

9-67.

9-78.

9-79.

9-80.

9-68.

9-71.

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution

GC/MS)

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline

PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328

High Resolution GC/FID)

Air, Volatile Organic Compounds (EPA Method TO-

17)

Sheet Piling Installation for ≤ 20 feet deep

Excavation

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Water, Methane (EPA SOP RSK-175)

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and

Isoalkanes (ASTM D3328 GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution

GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline

PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution

GC/MS)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and

Terpane Biomarkers (ASTM D5739 High Resolution

GC/MS)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA

2006.0/2007.0)

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Installation for > 20 feet deep Excavation

+4.99%

+4.98%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

1.54$ $1.61

2.78$ $2.91

7.75$ $8.13

32.59$ $34.21

28.68$ $30.11

159.84$ $167.83

198.86$ $208.80

356.01$ $373.81

186.48$ $195.80

45.64$ $47.92

45.64$ $47.92

14.34$ $15.05

13.03$ $13.68

81.36$ $85.42

71.66$ $75.24

3,129.84$ $3,286.33

130.41$ $136.93

9,389.52$ $9,858.99

163.00$ $171.15

15,101.47$ $15,856.54

272.54$ $286.16

1,242.00$ $1,304.10

+4.90%

+4.97%

+4.99%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.95%

+4.99%

+4.99%

+4.55%

+4.68%10-2.c.

10-2.d.

10-7.

10-8.

10-9.

10-2.b.

#57 Stone

Pea Gravel

Clean Overburden Used As Backfill, Compaction and

Testing > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and

Testing ≤ 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and Testing

(includes transport) ≤ 300 cubic yards

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2)

(includes installation)

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2)

(includes installation)

Dewatering System, up to 12 well points (includes installation)

LDA Excavation and Loading With Surface Casing >

300 cubic yards

LDA Excavation and Loading With Driven Casing <

300 cubic yards

LDA Excavation and Loading With Surface Casing ≤

300 cubic yards

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

Conventional Soil Excavation and Loading > 300 cubic yards

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Remove and Dispose Petroleum Storage Tank - ≤

1,000 gal. capacity

Additional Dewatering System Well Points (2)

(includes installation)

10-11.a.

10-18.

10-19.

10-20.

10-21.

10-22.

10-23.

10-17.

10-11.b.

10-12.a.

10-14.

10-15.

10-15.a.

10-15.b.

10-16.

11-1.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

2,484.00$ $2,608.20

3,726.00$ $3,912.30

4,968.00$ $5,216.40

3.90$ $4.09

41.77$ $43.85

43.35$ $45.51

47.06$ $49.41

239.24$ $251.20

33.17$ $34.82

52.16$ $54.76

45.23$ $47.49

45.42$ $47.69

43.77$ $45.95

41.69$ $43.77

236.52$ $248.34

1.24$ $1.30

260.82$ $273.86

1.46$ $1.53

164.31$ $172.52

9.76$ $10.24

3.41$ $3.58

11.72$ $12.30

1.24$ $1.30

12-3.

12-4.

12-5.

12-6.

12-7.

Grass - Sod

Remove and Dispose Petroleum Storage Tank - >

1,000 to 5,000 gal. capacity

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) ≤ 450 tons

Transport Petroleum Impacted Soil (bulk) > 100 miles

Asphalt Paving - 2 inch thickness (includes sub-base)

Additional Rental of 20 Cubic Yard Roll-Off

Container

Transport and Disposal of Petroleum Product (bulk)

Transport and Disposal of Petroleum Product

(includes drum)

Transport and Disposal of Petroleum Contact Water

(bulk)

Transport and Disposal of Petroleum Contact Water

(includes drum)

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal

Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a Landfill

(bulk) > 450 tons

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport and Disposal of Petroleum Impacted Soil

(includes drum)

Transport and Disposal of Mixed Debris

Transport and Disposal of Clean Concrete

Loading, Transport and Disposal/Recycle Clean

Overburden

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Remove and Dispose Petroleum Storage Tank - >

10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - >

5,000 to 10,000 gal. capacity

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

12-18.

13-1.

13-2.

13-3.

13-6.

12-8.

11-3.

11-4.

12-2.

11-2.

12-9.

12-10.

12-11.

12-12.

12-13.

12-14.

12-15.

12-16.

+5.00%

+5.00%

+5.00%

+4.87%

+4.98%

+4.98%

+4.99%

+5.00%

+4.97%

+4.98%

+5.00%

+5.00%

+4.98%

+4.99%

+5.00%

+4.84%

+5.00%

+4.79%

+5.00%

+4.92%

+4.99%

+4.95%

+4.84%

3,105.00$ $3,260.25

4,347.00$ $4,564.35

86.06$ $90.36

96.49$ $101.31

109.54$ $115.01

4,968.00$ $5,216.40

326.01$ $342.31

4,238.31$ $4,450.22

326.01$ $342.31

4,238.31$ $4,450.22

326.01$ $342.31

4,968.00$ $5,216.40

623.48$ $654.65

4,238.31$ $4,450.22

326.01$ $342.31

639.00$ $670.95

4,595.40$ $4,825.17

456.42$ $479.24

3,260.25$ $3,423.26

9,311.27$ $9,776.83

3,390.66$ $3,560.19

6,781.32$ $7,120.38

3,390.66$ $3,560.19

6,458.40$ $6,781.32

2,608.20$ $2,738.61

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+5.00%

16-24.

17-1.

16-5.

16-18.

16-17.

16-6.

16-7.

16-8.

16-9.

16-10.

16-12.

16-13.

16-14.

16-21.

16-22.

16-23.

14-4.

14-5.

15-1.a.

15-1.b.

15-1.c.

16-2.

16-3.

16-4.

Multi-Phase Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test - Additional

Time

Vapor Extraction/Aquifer Pumping Test - 8 hours

Vapor Extraction Pilot Test - Additional Time

Vapor Extraction Pilot Test - 8 hours

Air Sparging or Biosparging Pilot Test - Additional

Time

Air Sparging or Biosparging Pilot Test - 8 hours

Groundwater Recovery System Pilot Test - Additional

Time

Trenching and Installation of 21 - 30 Lines

Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup - 1 Technology

Component - 1-10 Additional Recovery/Treatment

Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)

Trenching and Installation of 1-10 Plumbing (and

Electrical) Lines in Trench

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)

Air Sparging/Vapor Extraction Pilot Test - Additional

Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

System O&M Package - Small

MPE System Package - Medium

MPE System Package - Medium

AS/SVE System Package - Medium

AS/SVE System Package - Medium

Groundwater Treatment System Package - Medium

Groundwater Treatment System Package - Medium

Air Sparging/Multiphase Extraction Pilot Test -

Additional Time

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

15-4.d.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

3,257.01$ $3,419.86

3,912.30$ $4,107.91

4,173.12$ $4,381.77

492.94$ $517.58

2,856.60$ $2,999.43

3,105.00$ $3,260.25

4,303.53$ $4,518.70

1,242.00$ $1,304.10

326.01$ $342.31

6,781.32$ $7,120.38

8,346.24$ $8,763.55

10,824.03$ $11,365.23

1,956.15$ $2,053.95

4,347.00$ $4,564.35

1,956.15$ $2,053.95

1,242.00$ $1,304.10

1,242.00$ $1,304.10

652.05$ $684.65

652.05$ $684.65

1,614.60$ $1,695.33

1,863.00$ $1,956.15

3,105.00$ $3,260.25

5,216.40$ $5,477.22

7,172.55$ $7,531.17

3,260.25$ $3,423.26

652.05$ $684.65

2,608.20$ $2,738.61

+5.00%

19-17.

19-8.

19-10.

19-13.

19-14.

19-15.

19-16.

18-58.

19-1.

19-3.

19-4.

19-5.

19-6.

19-7.

19-18.

19-19.

18-56.

18-54.

17-2.

17-3.

17-4.

17-5.

18-12.

18-14.

18-16.

Remedial Action Startup Report

As-Built Drawings (P.E. Sealed red lined modifications)

Construction Drawings and Specs Report

Supplemental System O&M Package - Add Thermox or Catox Treatment

System O&M Package - Extra Large

System O&M Package - Large

System O&M Package - Medium

Carbon Off Gas Treatment - Add On - Small- Long

Term > 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

Pilot Test Report

Natural Attenuation or Post RA Monitoring Report, Annual

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Level 2 Natural Attenuation Monitoring Plan

Receptor and Exposure Pathway Report

Supplemental Site Assessment Report

General Site Assessment Report

Soil Source Removal Report

Air Sparge/Multiphase Extraction (AS/MPE) System -

Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE) System -

Small - Long Term > 6 Months

Carbon Off Gas Treatment - Add On - Large - Short

Term ≤ 6 mos.

Level 4 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 3 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 2 Limited Scope Remedial Action Plan or RAP

Modification Plan

Level 1 Limited Scope Remedial Action Plan or RAP

Modification Plan

18-38.

18-37.

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

342.31$ $359.42

1,825.74$ $1,917.02

2,608.20$ $2,738.61

1,304.10$ $1,369.30

621.00$ $652.05

326.01$ $342.31

342.31$ $359.42

94.17$ $98.87

65.52$ $68.79

62.71$ $65.84

41.94$ $44.03

344.03$ $361.23

180.60$ $189.63

180.60$ $189.63

180.60$ $189.63

344.03$ $361.23

541.71$ $568.79

180.60$ $189.63

180.60$ $189.63

361.22$ $379.28

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+5.00%

+4.99%

+4.99%

+4.99%

21-31.

21-32.

21-33.

19-20.

19-21.

19-22.

19-23.

19-25.

20-11.

20-8.

19-26.

19-27.

20-6.

20-7.

Laborers and Security Guards

Field Technician (Key)

P.G or P.E. Review, Evaluation and Certification of a

Remedial Action General Report

P.E. Review, Evaluation and Certification of an

Annual Operation and Maintenance Report

P.E. Review, Evaluation and Certification of a Non-

Annual Operation and Maintenance Report That

Includes Significant Proposed Changes to the

Approved RAP

P.E. Review, Evaluation and Certification of a

Remedial Action Startup Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

Assistant Scientist/Technical Specialist

Scientist/Technical Specialist (Key)

Interim Assessment Report

Well Abandonment/Site Restoration Report

Free Product Recovery Report

Remedial Action General Report

Operation & Maintenance Annual Report

Operation & Maintenance Report, Quarterly or Non-

Annual

Letter/NPDES Report

P.E. Review, Evaluation and Certification of As-Built

Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a Level

4 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

3 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

2 Limited Scope Remedial Action Plan or RAP

Modification Plan

P.E. Review, Evaluation and Certification of a Level

1 Limited Scope Remedial Action Plan or RAP

Modification Plan

21-29.

21-30.

21-25.

21-26.

21-27.

21-28.

+5.00%

+5.00%

+4.98%

361.22$ $379.28

326.01$ $342.31

21-34.

21-36.

P.E. Review, Evaluation, and Certification of Annual

PARM Report

P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a

Recommendation for System Modification or

Significant Change in the Course of Action

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

Notes:

+5.00%

File details come from the government source that posted it. Updated .