CN-370000-GC717-T4C.pdf
PDF 754 KB Posted
- Contract number
- GC717
- Issued by
- Florida
About this file
This document is a Petroleum Preapproval Program Task Assignment issued by the Florida Department of Environmental Protection, Division of Waste Management, Bureau of Petroleum Storage Systems. The task assignment (GC717-004C) involves AECOM Technical Services, Inc. (formerly Earth Tech Inc.), a contractor based in Orlando, Florida, performing work at a Global Constructs Group facility located in Mulberry, Florida (Polk County). Michelle Roberts serves as the FDEP/LP Site Manager, and Grant Willis is the FDEP Contract Manager. The work is subject to preapproval requirements under Florida Statute Section 376.30711(1)(b), with all verbal change orders and costs requiring departmental authorization prior to execution.
The task assignment encompasses a Supplemental Site Assessment and groundwater monitoring activities conducted across two events. Event 1, valued at $3,325.30, includes groundwater sampling (YIQ2 monitoring) with associated field activities such as well installation, soil screening, piezometer installation, and mobilization costs, along with office activities including various reports and plans. Event 2, valued at $3,016.67, covers YIQ3 groundwater monitoring with similar field and office components. The total cost for both events is $6,341.97 on a fixed-price basis with a 10% retainage. The cumulative work order total reaches $6,341.97. Deliverables include quarterly reports due December 2, 2011, and the final deliverable due March 16, 2012, with a performance period extending through September 12, 2012. The contract contains no cost-plus provisions, option periods, or set-asides.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .