CN-370000-GC717-T18X.pdf
PDF 2 MB Posted
- Contract number
- GC717
- Issued by
- Florida
About this file
This is a Petroleum Preapproval Program Task Assignment document issued by the Florida Department of Environmental Protection, Division of Waste Management, Bureau of Petroleum Storage Systems. The contract involves AECOM Technical Services, Inc. (formerly Earth Tech Inc.) as the primary contractor, with FDEP as the contracting agency. The work is being performed at the MOCAR Oil Company facility located at 3088 Barrancas Avenue, Pensacola, Florida, in Escambia County. The task assignment is identified as GC717-018X under FDEP Contract GC717, with a facility ID of 178508072. The cleanup phase involves remedial action activities for contaminated soil removal, and work is being conducted by subcontractors including Cowin Heavy Equipment, Davis Marine, Holland Pump, and ENCO.
The task assignment has a fixed price total cost of $222,881.53 with a retainage of $22,288.15, resulting in a total encumbrance of $222,881.53. Work is divided into four separate events spanning from September 13, 2012, through June 28, 2013, with specific deliverables including field notes and laboratory reports due at defined intervals. Event costs include Month 3 construction oversight ($110,610.44), Month 3 dewatering and treatment ($37,945.60), Month 3 heavy equipment rental ($13,143.49), and Davis Marine sheet piling work ($61,182.00). All work must be preapproved by the Department prior to performance or cost incurrence, in accordance with Section 376.3071(1)(b), Florida Statutes. The contract is fully funded by FDEP with no cost sharing required from other parties.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .