CN-370000-GC717-T14V.pdf
PDF 699 KB Posted
- Contract number
- GC717
- Issued by
- Florida
About this file
This document is a Petroleum Preapproval Program Task Assignment issued by the Florida Department of Environmental Protection, Division of Waste Management, Bureau of Petroleum Storage Systems. The task assignment is under FDEP Contract Number GC717, with the facility located at 84 Ready Avenue NW, Fort Walton Beach, Florida in Okaloosa County. The contractor is AECOM Technical Services, Inc. (formerly Earth Tech Inc.), located in Orlando, Florida, with contractor representative Suzanne Schomer, PE. The FDEP/LP Site Manager is Jeff Bush, and the FDEP Contract Manager is Grant Willis.
This task assignment covers Operation and Maintenance activities for the Okaloosa County Road Department South site during the remedial action cleanup phase. The assignment includes two events: the first event is the Third Quarter 2012 Operations and Maintenance (July-September 2012), and the second event is the second annual O&M Quarter 4 (October-December 2012). Work includes quarterly groundwater sampling of monitoring wells, analysis per the PSPT, field activities such as well installations and abandonment, soil screening, and various reporting requirements. The total contract cost is $76,175.76 with no retainage. The period of task performance extends from the last signature date to July 30, 2013, with the first event due October 31, 2012, and final deliverable due January 31, 2013. The first event total cost is $35,447.57, and the second event total cost is $40,728.19. All work requires preapproval by the Department prior to performance or cost incurrence per Florida Statute 376.30711(1)(b).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .