CN-370000-GC717-T3AB.pdf

PDF 7 MB Posted

Attached to
Master Agreement FL|GC717|52dcde91b383a9a132055f258f372c48
Contract number
GC717
Issued by
Florida

About this file

Summary

This document package comprises a Petroleum Preapproval Program (PAPP) Task Assignment for Contract GC717 between the Florida Department of Environmental Protection (FDEP), Bureau of Petroleum Storage Systems and AECOM Technical Services, Inc. (formerly Firmly Earth Tech Inc.), with FDEP/LP Site Manager Donna Burmeister overseeing the Parker City Maintenance Yard facility (Facility ID 038518674) located at 1001 West Park Street in Parker, Bay County, Florida. The contract involves remedial well installation, remedial action construction, baseline sampling, electrical connections, trailer installation, and operation and maintenance activities for a petroleum contamination site designated as Imminent Threat status, with a fixed price total cost of $285,178.74 and a 10% retainage requirement.

The contract consists of six events spanning from June 2013 through June 2014, including Event One (Remedial Well Installation - 31 biosparging well clusters at 50 and 75 feet depths), Event Two (Remedial Action Construction), Event Three (Baseline Sampling), Event Four (Electrical Connections/Trailer Installation/Startup), Event Five (Quarter 1 O&M Activities), and Event Six (Quarter 2 O&M Activities). Supporting vendors include Southern Sonic Solutions for drilling services, Clark Environmental for drum disposal, Harrington Industrial Plastics and Ferguson for piping materials, Ready Mix for concrete, Amazon for sprinkler vaults, Home Depot for fencing, ENCO for laboratory analysis, GWTT for biosparging system rental and manifold, Sunbelt Rentals for equipment rental, Brady Bennett & Associates for electrical work, ABP Electric for additional electrical services, and ESD Waste2Water for compressor system leasing. The contract encompasses field activities, office work, subcontractor costs, equipment rental, and quarterly monitoring with specific deliverables and reporting requirements established throughout the performance period.

View the file

Other files

File Type Posted
CN-370000-GC716-T8E.pdf PDF
CN-370000-GC717-A2.pdf PDF
CN-370000-GC717-CO001.pdf PDF
CN-370000-GC717-T13I.pdf PDF
CN-370000-GC717-T14AF.pdf PDF
CN-370000-GC717-T14AG.pdf PDF
CN-370000-GC717-T14V.pdf PDF
CN-370000-GC717-T18AC.pdf PDF
CN-370000-GC717-T18AF.pdf PDF
CN-370000-GC717-T18K.pdf PDF
CN-370000-GC717-T19F.pdf PDF
CN-370000-GC717-T19I.pdf PDF
CN-370000-GC717-T25F.pdf PDF
CN-370000-GC717-T26E.pdf PDF
CN-370000-GC717-T2G.pdf PDF
CN-370000-GC717-T33B.pdf PDF
CN-370000-GC717-T34F.pdf PDF
CN-370000-GC717-T36C.pdf PDF
CN-370000-GC717-T36D.pdf PDF
CN-370000-GC717-T36E.pdf PDF
CN-370000-GC717-T38D.pdf PDF
CN-370000-GC717-T3AA.pdf PDF
CN-370000-GC717-T3T.pdf PDF
CN-370000-GC717-T3V.pdf PDF
CN-370000-GC717-T41A.pdf PDF
CN-370000-GC717-T44A.pdf PDF
CN-370000-GC717-T44C.pdf PDF
CN-370000-GC717-T4D.pdf PDF
CN-370000-GC717-T50A.pdf PDF
CN-370000-GC717-T51A.pdf PDF
CN-370000-GC717-T52A.pdf PDF
CN-370000-GC717-T5E.pdf PDF
CN-370000-GC717-T61A.pdf PDF
CN-370000-GC717-T63A.pdf PDF
CN-370000-GC717-T68A.pdf PDF
CN-370000-GC716.pdf PDF
CN-370000-GC717-A1.pdf PDF
CN-370000-GC717-CO002.pdf PDF
CN-370000-GC717-CO003.pdf PDF
CN-370000-GC717-T13G.pdf PDF
CN-370000-GC717-T13H.pdf PDF
CN-370000-GC717-T14Q.pdf PDF
CN-370000-GC717-T14T.pdf PDF
CN-370000-GC717-T14Z.pdf PDF
CN-370000-GC717-T18AB.pdf PDF
CN-370000-GC717-T18AG.pdf PDF
CN-370000-GC717-T18J.pdf PDF
CN-370000-GC717-T18M.pdf PDF
CN-370000-GC717-T18O.pdf PDF
CN-370000-GC717-T18S.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .