CN-370000-GC717-T18AG.pdf
PDF 2 MB Posted
- Contract number
- GC717
- Issued by
- Florida
About this file
Document Summary
This is a Petroleum Preapproval Program Task Assignment issued by the Florida Department of Environmental Protection, Division of Waste Management, Bureau of Petroleum Storage Systems. The contract involves FDEP Contract Number GC717, Facility ID 17850807 (Mocar Oil Company located in Pensacola, Florida), and contractor AECOM Technical Services, Inc. (formerly Earth Tech Inc.) based in Orlando, Florida. The task assignment is for remedial action post active remediation monitoring at the petroleum storage facility site.
The work scope consists of four quarterly events conducted between August 2013 and April 2014, involving installation of ten new 2-inch diameter groundwater monitor wells, soil screening, piezometer installation, well sampling, and quarterly Post-Remedial Action Monitoring (PARM) reports. The total contract cost is $43,030.06 with a fixed-price arrangement and 10% retainage. The FDEP reimburses 100% of costs with no cost-sharing by the facility owner. Laboratory analysis costs total $7,916.00 across four events, covering BTEX/MTBE, PAH, and VOH analytical testing per EPA methods. Deliverables include a General Remedial Action Report, quarterly PARM reports, and associated documentation, with a final delivery date of June 30, 2014. The contract was executed in June 2013 with signature authorization through December 2014.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .