CN-370000-CN818-T5.pdf

PDF 370 KB Posted

Attached to
Master Agreement FL|CN818|f80a64586864e81a5dff663bf259d494
Contract number
CN818
Issued by
Florida

About this file

This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection's Division of Recreation and Parks, involving Michael Baker International as the consultant for a construction support services contract. The project is located at Myakka River State Park in Sarasota County, Florida, and is associated with Statewide Contract CN818, Task Assignment 5. Key personnel include John Goss (Construction Project Manager), Jeff K. Roberts (Consultant Representative), and Vu Nguyen (FDEP Contract Manager).

The contract provides construction support services for the rehabilitation of the main vehicle bridge (Bridge #170401), with a total fixed price of $6,518.76. The scope includes two primary subtasks: (1) RFI and shop drawing reviews during the construction phase, and (2) three site inspections at approximately 30%, 60%, and substantial completion. Michael Baker International will provide deliverables such as written RFI responses, drawing markups, and punch lists in PDF format. The project is scheduled to be completed by December 31, 2025, with payment contingent upon FDEP approval of deliverables. The work will utilize rates from a previous contract (CN202) and involves repair of concrete areas and addressing failing sand-cement riprap at the west abutment of the bridge.

View the file

Other files

File Type Posted
ContractBudgetExport.csv CSV file
CN-370000-CN221-T2.pdf PDF
CN-370000-CN818-T1.pdf PDF
CN-370000-CN818-T3.pdf PDF
CN-370000-CN818-T4.pdf PDF
CN-370000-CN818-T2.pdf PDF
CN-370000-CN818.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDivision oof RRecreation aand PParks

CConsultant’s TTask AAssignment NNotification

FFLORIDA DEPARTMENT OF

EENVIRONMENTAL PPROTECTION

DRP-084

Rev. 0 /2025 of 2

FDEP Contract No: Project Number: Task Assignment No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Task Description:

Project Manager:

Schedule:

Start Date: Completion Date:

Fixed Price Cost: Cost Reimbursement (Not to Exceed):

Total Task Amount:

Signatures and Date:

1.

Budget Representative, FDEP Signature Date

2.

Project Manager, FDEP Signature Date

3.

Signature Date

4.

Signature Date

5.

Contract Authority, FDEP Signature Date

CN818 61371C 5

Myakka River State Park Main Drive Bridge Rehabilitation

Michael Baker International Jeff K. Roberts, PE

(850) 766-8992 Jeff.Roberts@mbakerintl.com

Vu Nguyen

(850) 245-2630 vu.nguyen@floridadep.gov

The task is to provide construction support services post design for construction of the main vehicle bridge within Myakka River State Park per the attached proposal dated 05.06.2025. Subtasks utilizing rates per CN202 are denoted with an asterisk (*) in the subtask heading.

John Goss

Upon Execution 12/31/2025

$6,518.76 $0.00 $6,518.76

Tamika Bass

John Goss

Jeff Roberts, PE

Vu Nguyen

Michael W. Foster Jr., P.E.

Tamika Bass Digitally signed by Tamika Bass Date: 2025.06.16 13:50:19 -04'00'

John Goss Digitally signed by John Goss Date: 2025.06.23 12:10:30 -04'00'

Jeff Roberts Digitally signed by Jeff Roberts Date: 2025.06.23 13:05:58 -04'00'

Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.06.23 14:40:12 -04'00'

Michael W. Foster Jr., P.E.

Digitally signed by Michael W. Foster Jr., P.E.

Date: 2025.06.24 22:52:55 -04'00'

DDivision oof RRecreation aand PParks

CConsultant’s TTask AAssignment NNotification

FFLORIDA DEPARTMENT OF

EENVIRONMENTAL PPROTECTION

DRP-084

Rev. /2025 2 of 2

Encumbrance Information:

Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount

Total:

61371C 37504000056 080039/22 423001 U3200 131500 QK $6,518.76

$6,518.76

May 6, 2025

John Goss Construction Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, FL 32399

RE: Statewide Contract: CN818, Task Assignment __ Myakka River State Park Bridge Rehabilitation (Bridge # 170401), Sarasota County, FL Construction Support & Unbilled Tasks leftover from CN202; Task Assignment 47

Dear Mr. Goss:

For your review, Michael Baker International, Inc., is attaching a proposal summary and man-hour documentation for providing construction support/post design services for the main vehicle bridge within Myakka River State Park (Bridge # 170401). We have included a third site visit during construction phase task based on FDEPs request to have three (3) site visits performed during construction instead of the originally scoped two (2) visits.

Please review the attached Proposal Summary and deliverables and let me know if there are any questions or comments.

Sincerely, Jeff K. Roberts, PE, RSP2B

Vice President Jeeeeeeeeeeeeeefffffff K Roberts PPE RSP

Construction Support for Bridge # 170401 Myakka State Park, Sarasota County, FL

Statewide Contract CN818, Task Assignment ___

Project Objective: The purpose of this scope of services is to provide construction support services post design for construction of the bridge repair plans developed under CN202; TA 47. This includes repair of concrete areas and preparation of design plans and a repair solution for the failing sand-cement riprap at the west abutment of the Main Park Drive bridge in Myakka River State Park. The intent is to provide shop drawing reviews, responses to requests for information (RFIs) from the contractor, and assess construction progress at regular intervals.

Subtask 1: RFI’s, Shop Drawing Review during Construction Phase MBI will provide RFI and shop drawing review and responses throughout the construction phase of the project (from construction Notice-to-Proceed to closeout).

Deliverables:

A written RFI response and/or drawing markup supplied in .pdf electronic format will be provided to the contractor and FDEP within 5 business days of RFI/shop drawing receipt.

Performance Measure: Final deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Company Classification Rate Hours Cost MBI Principal / Project Manager $238.84 3 $716.52 MBI Sr. Engineer $149.58 10 $1,495.80

Totals (Subtask 1) 13 $2,212.32

Subtask 2: Site Inspections MBI will provide two qualified persons for three site inspections, at approximately 30%, 60% and substantial completion (or as requested by FDEP), to verify installations conform to plan intent.

Deliverables:

A written punch list supplied in .pdf electronic format will be provided to the contractor and FDEP, highlighting any concerns or deficiencies noted.

Performance Measure: Final deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Company Classification Rate Hours Cost

MBI Principal / Project Manager $238.84 3 $716.52 MBI Sr. Engineer $149.58 24 $3,589.92

Totals (Subtask 2) 27 $4,306.44

Summary of Fees:

Subtask Subtask Fixed Price Cost

Subtask Reimbursable

Subtask 1: RFI & Shop Drawings – Construction $2,212.32 Subtask 2: Construction Site Visits $4,306.44

Total Fixed Price Cost $6,518.76 -- Total Reimbursable Cost -- --

Overall Total Cost $6,518.76

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.

Project Schedule:

Project Schedule is based on estimated duration of calendar days to complete each subtask. Schedule dates will be established after approved and executed contract has been received. Where most practical, subtasks will be worked on concurrently.

Subtask Subtask Duration (Calendar Days)

Subtask 1: RFI & Shop Drawings – Construction n/a

Subtask 2: Construction Site Visits n/a