This document is a detailed architectural and engineering design contract between K2M Design and the Florida Department of Environmental Protection (FDEP) for the renovation of the John Pennekamp Coral Reef State Park Interpretive Center in Key Largo, Florida. The project involves multiple firms including K2M Design, Curtis + Rogers, Roto Design, GWWO, Tenji, Newcomb-Boyd, Lehrer Cumming, and OCI, who will collaborate on various aspects of the design and permitting process.

The contract is structured into six subtasks spanning schematic design, design development, construction documents, and permitting, with a total project cost of $2,301,412.44. The scope includes designing a new interpretive center with exhibits, a concession building, parking redesign, and fire protection waterline. The project is scheduled to be completed by June 2025, with exhibit design potentially extending beyond the main structure's completion. Payment will be made upon approval of deliverables for each subtask, with costs divided between basic architectural and engineering services, additional services, and reimbursable expenses. The design will require coordination with multiple local and state agencies, including Monroe County Building Department, South Florida Water Management District, and Florida Department of Environmental Protection.

View the file

Other files

File Type Posted
CN-370000-CN667-CMC1.pdf PDF
CN-370000-CN667-T1CO1.pdf PDF
CN-370000-CN667-T1CO2.pdf PDF
CN-370000-GC122-T03-02.pdf PDF
CN-370000-CN667-T1.pdf PDF
CN-370000-CN667.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN667 TA01 03 61438C

John Pennekamp Coral Reef State Park Interpretive Center

K2M Design

Heather Carruthers 305-307-5841 hcarruthers@k2mdesign.com

Ralph Perkins or successor 850-245-2460 Ralph.Perkins@FloridaDEP.gov

The change order consist of design, permitting and bidding assistance of the new Interpretive Center with exhibits,Concession Building, Parking Redesign and Fire Protection waterline. Proposal 5.30.24

$ 0.00 $ 34,534.40 $ 34,534.40 $ 3,186.60 $ 319,481.62 $ 322,668.22

$ 19,383.10 $ 2,282,029.34 $ 2,301,412.44 $ 22,569.70 $ 2,601,510.96 $ 2,624,080.66

04.27.2023

03.29.2025

03.29.2025

06.29.2025

Tamika Bass

Garland Sandel

Ralph Perkins

Scott Maloney 6/3/24

Shawn Hamilton

61438C 37505018015 080039/23 000286 U3100 131500 AD $ 2,301,412.44

$ 2,301,412.44

May 30, 2024

Garland Sandel Florida Department of Environmental Protection Division of Recreation and Parks Bureau of Design and Construction Design Project Manager 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: Contract Number CN667 Interpretive Center – John Pennekamp Coral Reef State Park

Dear Garland, For your review, K2M Design has updated our proposal summary and man-hour documentation for the renovation of John Pennekamp Coral Reef State Park in Key Largo to include the fire line and utility plans/coordination for the project. The proposal summary includes the following service subtasks:

Subtasks 3B – 3M – Schematic Design Phase (30% Documents) Subtask 4 – Design Development Phase (60% Documents) Subtask 5 – Construction Document Phase (90-100% Documents) Subtask 6 – Permitting

Please review the attached Proposal Summary and deliverables.

Sincerely, Heather Carruthers Director of Business Development, Southeast Region K2M Design

Interpretive Center John Pennekamp Coral Reef State Park

Contract Number CN667, Task Assignment Number 01 Subtasks 3B through 6

Subtask 3 – 30% Documents (Schematic Design Phase)

In the Schematic Design (30% Documents) phase, the K2M Team will produce a design solution illustrating the scale and relationship of the project components based on the program, budget, and other project requirements. The 30% Documents shall consist of drawings and other documents including a site plan, preliminary building plans, elevations, and may include some combination of study models, perspective sketches, or digital modeling. Preliminary selections of major building systems and construction materials shall be noted on the drawings or described in writing as a narrative. The K2M Team will review with Client the approaches to design and construction of the project. The K2M Team shall also review and prepare a written evaluation of Client’s program, schedule, budget for the cost of the work, project site, and the proposed procurement or delivery method and other initial information provided by Client. Project schedules will be updated after approval of the submission.

Schematic Design activities will include:

Confirmation of all space sizes, including equipment rooms Preliminary selection of building systems and recommended equipment types Development of preliminary site plan based on survey, Geotech reports and concept design Code evaluation Civil phasing plan to keep existing center open during construction Creation of up to two (2) site hardscape and landscape plan options Work related to aquarium and exhibits including:

background technical and operational research design of architectural and non-architectural exhibit tanks development of:

graphic scheme exhibit floor plan exhibition narrative interactive descriptions finish schedule back-of-house requirements preliminary lighting requirements preliminary Facility Impact Plan

Updated renderings Continued coordination with coral nursery subject matter expert Updated cost estimate

Subtask 3B – Civil Engineering Schematic Design (30% Documents) Additional Service

Description Preliminary Site Plan Preliminary Civil Phasing Plan

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Preliminary Site Plan and Phasing Plan Documents shall be digitally submitted in pdf format to the BDC project manager.

Subtask 3C – Landscape Design –Schematic Design (30%) Documents Additional Service

Description Hardscape and landscape plans including:

Preliminary material selections Color rendering of site Rendered elevations/sections as needed Photographs

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 30% hardscape and landscape plans (to 100% Schematic Design level) shall be digitally submitted in pdf format to the BDC project manager.

Subtask 3D – Signage & Wayfinding – Schematic Design (30%) Documents Add’l Service

Description Coordination with A/E and civil team to identify wayfinding issues Initial identification of signage/wayfinding locations

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Schematic layout showing signage/wayfinding shall be digitally submitted in pdf format to BDC project manager.

Subtask 3E – Exhibit – 50% Schematic Design Documents Additional Service

On-site team workshop to review site and initial concepts including with park personnel 50% design workshop to review exhibit progress and budget considerations Background technical and operational research Develop floor plans, descriptions and narratives

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Draft exhibit and gallery plans to 50% Schematic Design level shall be digitally submitted in pdf format to the BDC project manager.

Subtask 3F – Aquaria Life Support Systems – Schematic Design (30%) Docs Add’l Service

Description On-site workshop to review site, gather information and review initial concepts 50% design workshop to review exhibit progress and budget considerations Background technical and operational research Develop tank plans, descriptions and narratives

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Schematic design level plans and supporting documents for aquaria tanks and back of house requirements shall be digitally submitted in pdf format to the BDC project manager.

Subtask 3G – Acoustical Schematic Design Documents Additional Service

Description Provide narrative establishing goals for sound isolation, mechanical system noise control and reverberation control and outlining preliminary recommendations.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Memorandum of preliminary acoustical planning goals, considerations and requirements in pdf format shall be submitted to the BDC project manager.

Subtask 3H – Schematic Coral Nursery Coordination Additional Service

Description Continued collaboration with coral nursery designer/subject matter expert

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Memorandum regarding issues and status of coral nursery development shall be digitally submitted in pdf format to the BDC project manager.

Subtask 3I – Final Design Renderings Additional Service

Description 3D renderings of the proposed design

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Five (5) three-dimensional views, including exteriors and interiors of the proposed project. Printable high resolution digital files shall be submitted to the BDC project manager.

Subtask 3J – Schematic Design Milestone Estimating Additional Service

Description Milestone estimate of total construction cost based on 30% documents

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Updated estimate of total construction cost based on SD Documents shall be digitally submitted in pdf format to the BDC project manager.

Subtask 3K – Basic Service – Schematic Design (30%) Documents

Preliminary architectural drawings including

Preliminary building plans, sections and elevations Preliminary selections of major building systems and construction materials Some combination of study models, perspective sketches or digital representations

Selection of major engineering systems and equipment Code narrative Specification table of contents Final Basis of Design narratives

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 100% Schematic Design Documents and Drawings (30% Construction Documents) shall be digitally submitted in pdf format to the BDC project manager.

Subtask 3L – Exhibit – Schematic Design (30%) Documents Add’l Service

Description For exhibits

Floor plans, descriptions Exhibition narrative Exhibit floor plan Interactive descriptions Drawings of primary structures Architectural scale concrete tanks Non-architectural scale exhibit tanks Graphic Templates Graphic Matrix

For gallery Finish schedule Preliminary lighting requirements Back of house exhibit requirements Facility Impact Plan

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

30% exhibit and gallery plans (to 100% Schematic Design level), updated work plan, and estimate of probable cost will be presented via teleconference to BDC project manager and team. Corresponding documents shall be digitally submitted in pdf format to the BDC project manager.

Subtask 3M – Additional Limited Topographic Survey Additional Service

Description Additional Limited Topographic Survey

Old Road from US1 to entry road Including above-ground structures, trees, curbing, utility structures, existing structures, stormwater structures, signs, pavement markings and underground utilities Required for new fire line

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Limited Topographic Survey of Old Road

Fixed Price Cost

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Kimley-Horn Senior Professional 282.76$ 12.00 3,393.12$ Kimley-Horn Professional I 169.04$ 19.00 3,211.76$ Kimley-Horn Analyst II 131.91$ 30.00 3,957.30$ K2M Project Manager, Senior 181.93$ 6.00 1,091.58$

67.00 11,653.76$Sub-total

Subtask 3B - Civil Engineering Schematic Design (30% Documents)

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Curtis + Rogers Project Manager 156.47$ 60.00 9,388.20$ Curtis + Rogers Landscape Architect 134.91$ 38.00 5,126.58$ Curtis + Rogers Landscape Designer 103.14$ 32.00 3,300.48$ Curtis + Rogers Landscape Tech 82.92$ 30.50 2,529.06$ K2M Project Manager, Senior 181.93$ 20.00 3,638.60$

180.50 23,982.92$

Subtask 3C - Landscape Design - Schematic Design (30%) Documents

Sub-total

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Curtis + Rogers Project Manager 156.47$ 10.00 1,564.70$ Curtis + Rogers Landscape Architect 134.91$ 10.00 1,349.10$ Curtis + Rogers Landscape Designer 103.14$ 10.00 1,031.40$ K2M Project Manager, Senior 181.93$ 1.00 181.93$

31.00 4,127.13$

Subtask 3D - Signage & Wayfinding - Schematic Design (30%) Documents

Sub-total

Roto Design Director 195.00$ 80.00 15,600.00$ Roto Sr. Designer / Architect 165.00$ 70.00 11,550.00$ Roto Exhibit Designer 135.00$ 90.00 12,150.00$ Roto Sr. Graphic Designer 135.00$ 50.00 6,750.00$ Roto Interpretive Developer 110.00$ 61.00 6,710.00$ Roto Interactive Engineer 150.00$ 20.00 3,000.00$ Roto Production Assistant 80.00$ 40.00 3,200.00$ GWWO Project Manager 174.67$ 10.00 1,746.70$ GWWO Project Architect 2 149.61$ 16.00 2,393.76$ GWWO Intern2 92.86$ 20.00 1,857.20$ K2M Project Manager, Senior 181.93$ 8.00 1,455.44$

465.00 66,413.10$Sub-total

Subtask 3E - Exhibit - 50% Schematic Design Documents

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Tenji Director of Design 185.00$ 80.00 14,800.00$ Tenji CAD Designer 145.00$ 100.00 14,500.00$ Tenji LSS Designer 145.00$ 120.00 17,400.00$ Tenji Project Manager 165.00$ 40.00 6,600.00$ GWWO Project Manager 174.67$ 8.00 1,397.36$ GWWO Project Architect 2 149.61$ 16.00 2,393.76$ GWWO Intern2 92.86$ 18.00 1,671.48$ K2M Project Manager, Senior 181.93$ 2.00 363.86$

384.00 59,126.46$

Subtask 3F - Aquarium Life Support Systems - Schematic Design (30%) Documents

Sub-total

Firm Name Total Fixed Price Cost Newcomb-Boyd Director 290.00$ 4.00 1,160.00$ Newcomb-Boyd Senior Specialty Engineering 220.00$ 8.00 1,760.00$ Newcomb-Boyd Specialty Engineer 170.00$ 12.00 2,040.00$ K2M Project Manager, Senior 181.93$ 2.00 363.86$

26.00 5,323.86$Sub-total

Subtask 3G - Acoustical Schematic Design Documents

GWWO Project Architect 2 149.61$ 2.00 299.22$ GWWO Intern2 92.86$ 20.00 1,857.20$ GWWO Graphics 144.45$ 4.00 577.80$ K2M Project Manager, Senior 181.93$ 2.00 363.86$

28.00 3,098.08$Sub-total

Subtask 3H -Schematic Coral Nursery Coordination

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost GWWO Team Leader/Sr. Project Manager 193.09$ 0.50 96.55$

GWWO Project Architect 149.61$ 0.50 74.81$ GWWO Intern2 92.86$ 24.00 2,228.64$ GWWO Graphics 144.45$ 80.00 11,556.00$ K2M Project Manager, Senior 181.93$ 4.00 727.72$

109.00 14,683.71$

Subtask 3I -Final Design Renderings

Sub-total

Firm Name Total Fixed Price Cost Lehrer Cumming Senior Cost Manager 195.00$ 12.00 2,340.00$ Lehrer Cumming Cost Manager 180.00$ 25.00 4,500.00$ Lehrer Cumming Estimating Technician 115.00$ 45.00 5,175.00$ K2M Project Manager, Senior 181.93$ 8.00 1,455.44$

90.00 13,470.44$Sub-total

Subtask 3J -Schematic Design Milestone Estimating

K2M Director 247.82$ 4.00 991.28$ K2M Project Manager, Senior 181.93$ 36.00 6,549.48$ K2M Architect II 134.87$ 36.00 4,855.32$ K2M Architect III 175.67$ 10.00 1,756.70$ K2M Structural Engineer III 172.24$ 92.00 15,846.08$ K2M Engineering Designer III 139.58$ 164.00 22,891.12$ GWWO Team Leader/Sr. Project Manager 193.09$ 270.25 52,182.57$ GWWO CA Architect 178.35$ 4.00 713.40$ GWWO Project Architect 149.61$ 361.00 54,009.21$ GWWO Architectural Graphics 144.45$ 8.00 1,155.60$ GWWO Architect Intern 3 106.13$ 200.00 21,226.00$ GWWO Architect Intern 1 84.02$ 136.75 11,489.74$ OCI Mechanical Professional Engineer 194.98$ 14.00 2,729.72$ OCI Mechanical Project Engineer 134.99$ 44.00 5,939.56$

OCI

Electrical/PM Registered Professional Engineer

194.98$ 13.00 2,534.74$

OCI Electrical Project Engineer 134.99$ 46.00 6,209.54$ OCI Fire Protection 134.99$ 28.00 3,779.72$ OCI Plumbing Senior Designer 89.99$ 28.00 2,519.72$

OCI CAD 80.01$ 28.00 2,240.28$

OCI Clerical 70.00$ 20.75 1,452.50$

1,543.75 221,072.28$Sub-total

Subtask 3 - Schematic Design - 30% Documents Subtask 3K - Basic Services - 100% SD Documents

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Roto Design Director 195.00$ 80.00 15,600.00$ Roto Sr. Designer / Architect 165.00$ 70.00 11,550.00$ Roto Exhibit Designer 135.00$ 90.00 12,150.00$ Roto Sr. Graphic Designer 135.00$ 50.00 6,750.00$ Roto Interpretive Developer 110.00$ 61.00 6,710.00$ Roto Interactive Engineer 150.00$ 20.00 3,000.00$ Roto Production Assistant 80.00$ 40.00 3,200.00$ GWWO Project Manager 174.67$ 10.00 1,746.70$ GWWO Project Architect 2 149.61$ 16.00 2,393.76$ GWWO Intern2 92.86$ 20.00 1,857.20$ K2M Project Manager, Senior 181.93$ 8.00 1,455.44$

465.00 66,413.10$

Subtask 3L - Exhibit - 100% Schematic Design Documents

Reimbursable Cost

Kimley-Horn Senior Professional - PSM 267.39$ 4.00 1,069.56$ Kimley-Horn Senior Professional CAD Tech 159.55$ 42.00 6,701.10$ Kimley-Horn Admin 115.98$ 10.00 1,159.80$ SGC Field Sub Project Manager 165.00$ 12.00 1,980.00$ SGC Field Sub Project Coordinator 140.00$ 3.00 420.00$ SGC Field Sub Sr. Survey/SUE/GIS/CAD Tech 120.00$ 49.00 5,880.00$ SGC Field Sub 2 Person Field Crew 165.00$ 50.00 8,250.00$ SGC Field Sub 1 Person Field Crew 125.00$ 5.00 625.00$ SGC Field Sub Admin 100.00$ 12.00 1,200.00$ SGC Field Sub SUE Tech 140.00$ 30.00 4,200.00$ SGC Field Sub Mobilization 140.00$ 6.00 840.00$ SGC Field Sub Demobilization 140.00$ 6.00 840.00$ K2M Project Manager, Senior 181.93$ 4.00 727.72$

269.00 33,893.18$Sub-total

Subtask 3M - Additional Topographic Survey

Firm Name Expense Rate Quantity Total Roto Airfare (est.) 325.00$ 2 650.00$ Roto Lodging 150.00$ 4 600.00$ Roto Meals 36.000$ 6 216.00$

1,466.00$

Subtask 3E - 50% Exhibit Schematic Design Reimbursables - Additional Service

TRAVEL

Total Re-imbursables, Subtask 3E

Firm Name Expense Rate Quantity Total Tenji Airfare (est.) 325.00$ 2 650.00$ Tenji Lodging 150.00$ 4 600.00$ Tenji Meals 36.000$ 6 216.00$

1,466.00$Total Re-imbursables, Subtask 3F

Subtask 3F - Aquaria Life Support Systems - Schematic Design (30%) Documents

TRAVEL

Subtask 3 – COST SUMMARY

Firm Name Expense Rate Quantity Total SGC Field Sub Field Crew Per Diem 80.00$ 25 2,000.00$ SGC Field Sub SUE Field Crew Per Diem 80.000$ 25 2,000.00$

4,000.00$

Subtask 3M - Additional Topographic Survey

TRAVEL

Total Re-imbursables, Subtask 3F

Subtask 3 - Schematic Design - 30% Documents Subtask Fixed Price

BASIC AE SERVICES

Subtask Fixed Price

ADDITIONAL SERVICES

Subtask Reimbursable

Subtask 3B - Civil Engineering Schematic Design (30% Documents)

-$ 11,653.76$ $ -

Subtask 3C - Landscape Design - Schematic Design (30%) Documents

-$ 23,982.92$ $ -

Subtask 3D - Signage & Wayfinding - Schematic Design (30%) Documents

-$ 4,127.13$ $ -

Subtask 3E - Exhibit - 50% Schematic Design Documents 66,413.10$ $ 1,466.00

Subtask 3F - Aquaria Life Support Systems - Schematic Design (30%) Documents

-$ 59,126.46$ $ 1,466.00

Subtask 3G - Acoustical Schematic Design Documents -$ 5,323.86$ $ -

Subtask 3H -Schematic Coral Nursery Coordination -$ 3,098.08$ $ -

Subtask 3I -Final Design Renderings -$ 14,683.72$ $ -

Subtask 3J -Schematic Design Milestone Estimating -$ 13,470.44$ $ -

Subtask 3K - Basic Services - 100% SD Documents -$ -$ $ -

Subtask 3L - Exhibit Design - 100% SDs 221,072.28$ 66,413.10$ $ -

Subtask 3M - Additional Limited Topographi Survey (Fire Line) -$ 33,893.18$ $ 4,000.00

Sub-Total 221,072.28$ 302,185.75$ $ 6,932.00

$ 530,190.03TOTAL Subtask 3 - Schematic Design (30% Documents)

Sub-task 4 – 60% Documents (Design Development Phase)

The purpose of the Design Development phase (60% Documents) is to advance the initiated design in Schematic Design. Upon Client approval of the 30% Documents, the team will start 60% Documents. The project will be defined during this phase including further developed drawings, final code analysis, site design, plans, exterior elevations, interior elevations, building sections, schedules, enlarged plans, landscape/hardscape plans and typical construction details. Building systems will be further defined into basic systems, preliminary calculations, and major design elements. Specialty engineering in acoustics, IT/low-voltage design and site lighting will begin at this stage. This phase further develops the design and incorporates engineering disciplines to establish the final scope and details of the work. A first pass at the A-E specifications will be provided. Further details regarding the aquarium and exhibits will be developed.

A quality control review will be conducted.

In addition, preliminary work for the Commissioning process will begin. Commissioning is a process of ensuring that all building systems perform interactively according to the design intent and the owner’s operational needs. The foundation of our Service revolves around the systematic process of documented verification that all building systems perform interactively; fulfill the functional and performance requirements of the contract documents; and meet the owner’s operational objectives and needs.

Subtask 4A – Basic AE Service – 50% Design Development Documents

Description Continued development of design with increasing detail and specification as follows:

Architectural

Building floor plan(s) with dimensions, location of fire-rated elements, wall thicknesses, ingress and egress locations, door swings with numbers, casework/millwork, equipment and fixture locations, and room numbers.

Reflected ceiling plans with ceiling heights.

Interior elevations with all basic design features and engineering elements ready for Interior Design information (FFE, finishes, other Interiors elements).

Roof plan(s) with equipment.

Exterior elevations with all basic design features and engineering elements.

Exterior finish schedule for all spaces and surfaces with selected basis of design finish material, shape and size, and special properties.

Building cross sections and primary wall sections are further developed for all changes in floor levels and wall conditions.

Larger scale plans indicating required clearances and further detail such as , restrooms, lobby, exhibit/aquaria areas, labs, gift shop, multi-purpose rooms and storage areas.

Wall sections and typical construction details for the various conditions.

Selection and schedule of UL details, NOA details, STC details, and other pertinent rated information.

Door and window schedule showing sizes, materials, fire ratings, special construction, and preliminary hardware.

Plans and elevations of millwork, casegoods, and other designed elements.

Deferred/delegated design submittal schedule.

Preliminary COMcheck.

Interiors Floor and ceiling plans showing FFE, finishes, and other specialty features.

Interior elevation elements, notes, and callouts at design focal points.

Preliminary selections for FFE with basis of design.

Final color schemes/patterns for major finish elements.

Interior finish schedule for all spaces and surfaces

Structural Foundation plans with floor elevations, bottom of footing elevations, control joints, and slab thickness.

Framing plans for each level and roof showing dimensions, location, and sizes of structural members, principal top of framing elevations.

Location of building expansion joints (if applicable) Typical sections and details.

Schedule of assumed structural deferred design elements such as tensioned concrete and connections.

Calculations, design, and modeling of the structural system.

Mechanical Floor plans showing distribution systems and equipment locations including preliminary piping, ductwork, and equipment sizes; required clearances and weights; and accessories such as diffusers, dampers, louvers, etc.

Enlarged plan of mechanical equipment rooms showing equipment layouts.

Major structural penetrations coordinated with Structural and Architectural.

Heating and cooling load calculations for each individual space.

Equipment schedules with basis of design indicating size and capacity.

System noise control plans.

Preliminary COMcheck.

Plumbing/Fire Suppression Floor plan(s) showing water, sanitary waste, compressed air, acid waste, special traps (i.e., plaster, grease) and gas piping with sizes; location of fixtures and meter locations, sizes.

Roof drainage system/connections to stormwater system Sanitary and vent riser diagrams for vertical and horizontal coordination with Architectural.

Plumbing fixture schedule with basis of designs.

Coordination with local utilities.

Fire Suppression design criteria.

Electrical/Fire Alarm Site Plan showing site lighting, utility service, utility connections, and power to other outdoor facilities.

Floor plan(s) showing distribution systems (transformers, switch gear, panelboards, etc.) lighting, power, data, and power-consuming equipment locations with preliminary camera locations and access control facilities clearly identified.

Schedules for fixtures, panels, equipment, and food service equipment showing electrical characteristics, design loads, capacities, etc.

Light fixture schedule with basis of design including standard lighting and specialty fixtures.

Plan for low-voltage service to support displays, data, communications and security.

Preliminary COMcheck.

Fire Alarm design criteria.

CSI Specifications Initial spec pull for specifications

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 50% Design Development (45% Construction Documents) and Drawings shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4B – Civil Design Development Plans (60% Documents) Additional Service

Description Continued development of site plan showing all property constraints (setbacks, easements, etc.), utilities and connections/taps, topography, site drainage, parking, walks, retaining walls, storm water management design, etc.

Site plan showing building footprint, dimensions, finish floor elevation(s), and dimensions locating the building on the site.

Site demolition plan.

Phase I and II Erosion and Sedimentation Control plans.

Updated site work phasing plan.

Paving Grading and Drainage Plan Utility Plan Detail sheets

Deliverable Design Development (60% Construction Documents) including site, site demolition, erosion and sedimentation control, grading and drainage, phasing and utility plans shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4C – Landscape –Design Development (60%) Documents Additional Service

Description Continued development of landscape plan including planting plan; tree disposition plan; irrigation plan; hardscape plan; amenities plan;

signage/wayfinding; design narrative; and probable cost estimate for landscape and hardscape.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Design Development (60% Construction Documents) hardscape, landscape, and planting plans; narrative of intent of irrigation plans including head locations; and updated cost estimate shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4D – Signage & Wayfinding – Design Development (60%) Documents Add Service

Description Design of overall appearance of signage Coordination with State Park Service parameters for signage Confirmation of signage/wayfinding locations

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Schematic design of overall appearance of proposed signage within the parameters of the State Park Service regulations shall be digitally submitted in pdf format to BDC project manager.

Subtask 4E – Exhibit– 50% Design Development Documents Additional Service

On-site meeting with park staff to review direction, resolve differences and confirm priorities for exhibit types Continued development of exhibits and aquaria through workshops, updates of scope, cost estimates, exhibition narratives, habitat requirements, floor plans, graphics, and facility requirements and impact plan.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 50% Design Development (60% Construction Documents) plans for exhibits and aquaria shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4F – Aquaria Life Support Systems – Design Development (60%) Docs Add Service

Description On-site meeting to gather input and provide direction regarding operation of new aquaria Continued development of aquaria and back of house requirements through workshops, updates of scope, cost estimates, exhibition, habitat requirements facility requirements and impact plan.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Design Development (60% Construction Documents) plans for M/E/P for aquaria, including tank access, tank bases and requirements, shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4G – IT/Low-Voltage Design Development (60%) Documents Additional Service

Description Preliminary design developed for Telecom/data device locations, back boxes and raceways: supportive design for interactive displays; and device locations and raceway for auditorium sound and lighting.

Deliverable 100% Design Development (60% Construction Documents) plans for telecom/data, interactive displays and auditorium sound and lighting shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4H – Site Lighting Design Development (60%) Documents Additional Service

Description Photometrics for site parking lot lighting (mapping footcandles for light fixtures to ensure correct light levels for application) Design for site parking lot lighting

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 100% Design Development (60% Construction Documents) plans for site parking lot lighting shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4I – Acoustical Design Development (60%) Documents Additional Service

Description Preliminary sound isolation plans Acoustical finishes options Identification of mechanical background noise minimization strategies Review of AEID DD drawings

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Acoustics design recommendation including memo and other material as appropriate shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4J – Design Development Coral Nursery Coordination Additional Service

Continued collaboration with coral nursery designer/subject matter expert

Deliverable Memorandum regarding issues and status of coral nursery development shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4K – Design Development Milestone Estimating Additional Service

Description Milestone estimate of total construction cost based on 60% documents

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Updated estimate of total construction cost based on 100% Design Development plans (60% Construction Documents) shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4L – Commissioning Mechanical Systems Analysis Additional Service

Description Preliminary review of mechanical systems

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Memorandum regarding findings of review of mechanical systems shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4M – Basic Service – 100% DD Plans (60% Documents)

Description Continued development of all architectural, interior design and M/E/P/S engineering plans, including internal QA/QC

Deliverable 100% Design Development Documents and Drawings (60% Construction Documents) shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4N – Exhibit – 100% Design Development (60%) Documents Add’l Service

Description On-site meeting with Park staff to confirm exhibit details prior to developing final construction documents Further development of all areas related to exhibits and aquaria, including updated cost estimate, floor plans and finish schedules

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 60% exhibit and gallery plans (to 100% Development Design level), updated work plan, and estimate of probable cost will be presented via teleconference to BDC project manager and team. Corresponding documents shall be digitally submitted in pdf format to the BDC project manager.

Subtask 4O – Utility Design Development Additional Service

Description Utility Extension Plan and Utility Profiles & Details Coordination of entry locations for utility connection points with MEP team Coordination of proposed tree and landscape improvements with landscape architect Design of new fire line route on Old Road connecting existing main on US1 to proposed hydrants and fire department connections near new building Coordination with Florida Keys Aqueduct Authority

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverables 50% and 90% Utility Extension Plans and Utility Profiles & Details

Subtask 4P – Lift Station Analysis and Design Additional Service

Design of new lift station to replace current lift station incorporating existing fore main pressures, discharge information from the MEP team, and force main pressures within FDOT, Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Lift station report in PDF format along with Excel data spreadsheet including Lift Station Pumping Plan and Details, Lift Station Wet Well Calculations, and Lift Station Pump Selection to be submitted for review to Monroe County Utility Department and BDC Project Manager

K2M Director 247.82$ 4.00 991.28$ K2M Project Manager, Senior 181.93$ 93.00 16,919.49$ K2M Architect II 134.87$ 108.00 14,565.96$ K2M Architect III 175.67$ 72.00 12,648.24$ K2M Arch Designer III 130.17$ 36.00 4,686.12$ K2M Interior Designer II 175.67$ 7.00 1,229.69$ K2M Structural Engineer III 172.24$ 54.00 9,300.96$ K2M Engineer II 125.49$ 18.00 2,258.82$ K2M Engineering Designer III 139.58$ 67.50 9,421.65$ GWWO Team Leader/Sr. Project Manager 193.09$ 165.50 31,956.40$ GWWO CA Architect 178.35$ 2.00 356.70$ GWWO Project Architect 149.61$ 270.00 40,394.70$ GWWO Architectural Graphics 144.45$ 8.00 1,155.60$ GWWO Architect Intern 3 106.13$ 70.00 7,429.10$ GWWO Architect Intern 1 84.02$ 40.00 3,360.80$ OCI Mechanical Professional Engineer 194.98$ 19.00 3,704.62$ OCI Mechanical Project Engineer 134.99$ 36.00 4,859.64$

OCI

Electrical/PM Registered Professional Engineer

194.98$ 18.00 3,509.64$

OCI Electrical Project Engineer 134.99$ 36.00 4,859.64$ OCI Fire Protection 134.99$ 18.00 2,429.82$ OCI Plumbing Senior Designer 89.99$ 27.00 2,429.73$

OCI CAD 80.01$ 18.00 1,440.18$

OCI Clerical 70.00$ 27.00 1,890.00$

1,214.00 181,798.78$

Subtask 4A - Basic AE Services - 50% Design Development Plans (60% Documents)

Sub-total

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Kimley-Horn Senior Professional 282.76$ 30.00 8,482.80$ Kimley-Horn Professional I 169.04$ 57.00 9,635.28$ Kimley-Horn Analyst II 131.91$ 100.00 13,191.00$ Kimley-Horn Technical Support Staff 115.98$ 6.00 695.88$ K2M Project Manager, Senior 181.93$ 8.00 1,455.44$

201.00 33,460.40$Sub-total

Subtask 4B - Civil Design Development Plans (60% Documents)

Curtis + Rogers Project Manager 156.47$ 68.00 10,639.96$ Curtis + Rogers Landscape Architect 134.91$ 32.00 4,317.12$ Curtis + Rogers Landscape Designer 103.14$ 60.00 6,188.40$ Curtis + Rogers Landscape Tech 82.92$ 34.00 2,819.28$ K2M Project Manager, Senior 181.93$ 16.00 2,910.88$

210.00 26,875.64$

Subtask 4C - Landscape - Design Development (60%) Documents

Sub-total

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Curtis + Rogers Project Manager 156.47$ 12.00 1,877.64$ Curtis + Rogers Landscape Architect 134.91$ 16.00 2,158.56$ Curtis + Rogers Landscape Designer 103.14$ 16.00 1,650.24$ K2M Project Manager, Senior 181.93$ 1.00 181.93$

45.00 5,868.37$

Subtask 4D - Signage & Wayfinding - Design Development (60%) Documents

Sub-total

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Roto Design Director 195.00$ 100.00 19,500.00$ Roto Sr. Designer / Architect 165.00$ 80.00 13,200.00$ Roto Exhibit Designer 135.00$ 130.00 17,550.00$ Roto Sr. Graphic Designer 135.00$ 90.00 12,150.00$ Roto Interpretive Developer 110.00$ 40.00 4,400.00$ Roto Interactive Engineer 150.00$ 40.00 6,000.00$ Roto Production Assistant 80.00$ 70.00 5,600.00$ GWWO Project Manager 174.67$ 14.00 2,445.38$ GWWO Project Architect 2 149.61$ 24.00 3,590.64$ GWWO Intern2 92.86$ 20.00 1,857.20$ K2M Project Manager, Senior 181.93$ 8.00 1,455.44$

616.00 87,748.66$Sub-total

Subtask 4E - Exhibit - 50% Design Development Plans (60% Docs)

Tenji Director of Design 185.00$ 88.00 16,280.00$ Tenji CAD Designer 145.00$ 110.00 15,950.00$ Tenji LSS Designer 145.00$ 140.00 20,300.00$ Tenji Project Manager 165.00$ 60.00 9,900.00$ GWWO Project Manager 174.67$ 18.00 3,144.06$ GWWO Project Architect 2 149.61$ 16.00 2,393.76$ GWWO Intern2 92.86$ 17.25 1,601.84$ K2M Project Manager, Senior 181.93$ 2.00 363.86$

451.25 69,933.52$

Subtask 4F - Aquaria Life Support Systems Design - Design Development (60%) Documents

Sub-total

Firm Name Total Fixed Price Cost

OCI

Electrical/PM Registered Professional Engineer

194.98$ 44.00 8,579.12$

OCI Electrical Project Engineer 134.99$ 118.00 15,928.82$ K2M Project Manager, Senior 181.93$ 6.00 1,091.58$

168.00 25,599.52$Sub-total

Subtask 4G - IT/Low Voltage Design Development (60%) Dcuments

Firm Name Total Fixed Price Cost

OCI

Electrical/PM Registered Professional Engineer

194.98$ 24.00 4,679.52$

OCI Electrical Project Engineer 134.99$ 40.00 5,399.60$ K2M Project Manager, Senior 181.93$ 4.00 727.72$

68.00 10,806.84$Sub-total

Subtask 4H - Site Lighting Design Development (60%) Documents

Firm Name Total Fixed Price Cost Newcomb-Boyd Director 290.00$ 12.00 3,480.00$ Newcomb-Boyd Senior Specialty Engineer 220.00$ 19.00 4,180.00$ Newcomb-Boyd Specialty Engineer 170.00$ 30.00 5,100.00$ K2M Project Manager, Senior 181.93$ 8.00 1,455.44$

69.00 14,215.44$Sub-total

Subtask 4I - Acoustical Design Development (60%) Documents

GWWO Project Architect 2 149.61$ 2.00 299.22$ GWWO Intern2 92.86$ 25.00 2,321.50$ GWWO Graphics 144.45$ 4.00 577.80$ K2M Project Manager, Senior 181.93$ 2.00 363.86$

33.00 3,562.38$Sub-total

Subtask 4J -Design Development Coral Nursery Coordination

Firm Name Total Fixed Price Cost Lehrer Cumming Senior Cost Manager 195.00$ 16.00 3,120.00$ Lehrer Cumming Cost Manager 180.00$ 40.00 7,200.00$ Lehrer Cumming Estimating Technician 115.00$ 68.00 7,820.00$ K2M Project Manager, Senior 181.93$ 12.00 2,183.16$

Subtask 4K - Design Development Milestone Estimating

Firm Name Total Fixed Price Cost K2M Director 247.82$ 8.00 1,982.56$ K2M Project Manager, Senior 181.93$ 2.00 363.86$ K2M Mechanical/Plumbing Engineer III 172.24$ 8.00 1,377.92$ K2M Electrical Engineer III 172.24$ 4.00 688.96$

Subtask 4L - Commissioning Mechanical Systems Analysis

K2M Director 247.82$ 4.00 991.28$ K2M Project Manager, Senior 181.93$ 93.00 16,919.49$ K2M Architect II 134.87$ 108.00 14,565.96$ K2M Architect III 175.67$ 72.00 12,648.24$ K2M Arch Designer III 130.17$ 36.00 4,686.12$ K2M Interior Designer II 175.67$ 7.00 1,229.69$ K2M Structural Engineer III 172.24$ 54.00 9,300.96$ K2M Engineer II 125.49$ 18.00 2,258.82$ K2M Engineering Designer III 139.58$ 67.50 9,421.65$ GWWO Team Leader/Sr. Project Manager 193.09$ 165.50 31,956.40$ GWWO CA Architect 178.35$ 2.00 356.70$ GWWO Project Architect 149.61$ 270.00 40,394.70$ GWWO Architectural Graphics 144.45$ 8.00 1,155.60$ GWWO Architect Intern 3 106.13$ 70.00 7,429.10$ GWWO Architect Intern 1 84.02$ 40.00 3,360.80$ OCI Mechanical Professional Engineer 194.98$ 19.00 3,704.62$ OCI Mechanical Project Engineer 134.99$ 36.00 4,859.64$

OCI

Electrical/PM Registered Professional Engineer

194.98$ 18.00 3,509.64$

OCI Electrical Project Engineer 134.99$ 36.00 4,859.64$ OCI Fire Protection 134.99$ 18.00 2,429.82$ OCI Plumbing Senior Designer 89.99$ 27.00 2,429.73$

OCI CAD 80.01$ 18.00 1,440.18$

OCI Clerical 70.00$ 27.00 1,890.00$

1,214.00 181,798.78$

Subtask 4M - Basic AE Services - 100% Design Development Plans (60% Documents)

Sub-total

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Roto Design Director 195.00$ 100.00 19,500.00$ Roto Sr. Designer / Architect 165.00$ 80.00 13,200.00$ Roto Exhibit Designer 135.00$ 130.00 17,550.00$ Roto Sr. Graphic Designer 135.00$ 90.00 12,150.00$ Roto Interpretive Developer 110.00$ 40.00 4,400.00$ Roto Interactive Engineer 150.00$ 40.00 6,000.00$ Roto Production Assistant 80.00$ 70.00 5,600.00$ GWWO Project Manager 174.67$ 14.00 2,445.38$ GWWO Project Architect 2 149.61$ 24.00 3,590.64$ GWWO Intern2 92.86$ 20.00 1,857.20$ K2M Project Manager, Senior 181.93$ 8.00 1,455.44$

616.00 87,748.66$Sub-total

Subtask 4N - Exhibit - 100% Design Development Plans (60% Docs)

Reimbursable Costs

Kimley-Horn Senior Professional 282.76$ 10.00 2,827.60$ Kimley-Horn Professional I 169.04$ 19.00 3,211.76$ Kimley-Horn Analyst II 131.91$ 44.00 5,804.04$ Kimley-Horn Technical Support Staff 115.98$ 3.00 347.94$ K2M Project Manager, Senior 181.93$ 4.00 727.72$

80.00 12,919.06$

Subtask 4O - Utility Design Developmen

Sub-total

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost Kimley-Horn Senior Professional 282.76$ 5.00 1,413.80$ Kimley-Horn Professional I 169.04$ 30.00 5,071.20$ Kimley-Horn Analyst II 131.91$ 40.00 5,276.40$ Kimley-Horn Technical Support Staff 115.98$ 8.00 927.84$ K2M Project Manager, Senior 181.93$ 4.00 727.72$

87.00 13,416.96$

Subtask 4P - Lift Station Analysis & Design

Sub-total

Firm Name Expense Rate Quantity Total Roto Airfare (est.) 325.00$ 2 650.00$ Roto Lodging 150.00$ 4 600.00$ Roto Meals 36.00$ 6 216.00$

1,466.00$

Subtask 4E - 50% Exhibit Design Development Reimbursables

TRAVEL

Total Re-imbursables, Subtask 4E

Firm Name Expense Rate Quantity Total Tenji Airfare (est.) 325.00$ 2 650.00$ Tenji Lodging 150.00$ 4 600.00$ Tenji Meals 36.00$ 6 216.00$

1,466.00$

Subtask 4F - Aquaria Life Support Systems - Design Development (60%) Documents

Total Re-imbursables, Subtask 4F

Firm Name Expense Rate Quantity Total GWWO Airfare (est.) 330.00$ 2 660.00$ GWWO Lodging 150.00$ 4 600.00$ GWWO Rental Car 25.55$ 2 51.10$ GWWO Meals 36.00$ 6 216.00$ GWWO Fuel (est.) 40.00$ 1 40.00$ GWWO Tolls (est.) 10.00$ 2 20.00$ Roto Airfare (est.) 325.00$ 2 650.00$ Roto Lodging 150.00$ 4 600.00$ Roto Meals 36.00$ 6 216.00$

3,053.10$

TRAVEL

Total Re-imbursables, Subtask 4N

Subtask 4N - Exhibit - 100% Design Development Plans (60% Docs)

Subtask 4 – COST SUMMARY

Subtask 4 -Design Development - 60% Documents Subtask Fixed Price

BASIC AE SERVICES

Subtask Fixed Price

ADDITIONAL SERVICES

Subtask Reimbursable

Subtask 4A - Basic AE Services - 50% Design Development Documents

181,798.78$ -$

Subtask 4B - Civil Design Development Plans (60% Documents) -$ 33,460.40$ $ -

Subtask 4C - Landscape - Design Development (60%) Documents

-$ 26,875.64$

Subtask 4D - Signage & Wayfinding - Design Development (60%) Documents

-$ 5,868.37$

Subtask 4E - Exhibit - 50% Design Development Documents -$ 87,748.66$ $ 1,466.00

Subtask 4F - Aquaria Life Support Systems - Design Development (60%) Documents

-$ 69,933.52$ $ 1,466.00

Subtask 4G - IT/Low Voltage Design Development (60%) Dcuments

-$ 25,599.52$

Subtask 4H - Site Lighting Design Development (60%) Documents

-$ 10,806.84$

Subtask 4I - Acoustical Design Development (60%) Documents -$ 14,215.44$

Subtask 4J -Design Development Coral Nursery Coordination -$ 3,562.38$

Subtask 4K - Design Development Milestone Estimating -$ 20,323.16$

Subtask 4L - Commissioning Mechanical Systems Analysis -$ 4,413.30$

Subtask 4M - Basic AE Services - 100% Design Development Plans (60% Documents)

181,798.78$ -$

Subtask 4N - Exhibit - 100% Design Development Plans (60% Docs)

-$ 87,748.66$ $ 3,053.10

Subtask 4O - Utility Design Development -$ 12,919.06$

Subtask 4P - Exhibit - Lift Station Analysis & Design -$ 13,416.96$ $ -

Sub-Total 363,597.55$ 416,891.91$ $ 5,985.10

$ 786,474.56TOTAL Subtask 4 - Design Development (60% Documents)

Subtask 5 – Construction Documents (90-100% Plans)

Based on Client’s approval of the 60% Documents and on Client’s authorization of any adjustments in the project requirements and the budget for the cost of the work, the K2M Team shall prepare Construction Documents for Client’s approval. The Construction Documents shall consist of Drawings and Specifications setting forth in detail the quality levels of materials and systems and defining the design intent. The Construction Documents illustrate and describe the further development of the approved Design Development Documents and other requirements for the construction of the work, including the exhibits and aquaria. A quality control review will be conducted.

Client and the K2M Team acknowledge that to construct the work, the Contractor will provide additional information, including shop drawings, product data, samples, and other similar submittals as specifically requested by the K2M Team, which the K2M Team shall review if engaged to do so. During the development of the Construction Documents, the K2M Team shall assist Client in the development and preparation of (1) the Conditions of the Contract for Construction (General, Supplementary, and other Conditions) and (2) a Project Manual that includes the Conditions of the Contract for Construction and Specifications and may include sample forms. In addition, calculations will be prepared to confirm that proposed improvements will not adversely impact the flood plain in which the site falls, and to comply with South Florida Water Management District stormwater requirements.

Subtask 5A – Basic AE Services – 75% Construction Documents

Description – Continued development of all plans, drawings and documents with additional details, calculations and specifications to all Construction Document Sheets.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 75% Construction Documents and Drawings shall be digitally submitted in pdf format to the BDC project manager.

Subtask 5B – Civil – 90-100% Construction Documents Additional Service

Description Continued development of all site plans and details Development of Storm Water Pollution Prevention Plan Memorandum of floodplain compensation Pre- and post-development ICPR drainage model development

Deliverable 100% Construction Documents and Drawings signed and sealed shall be digitally submitted in pdf format to the BDC project manager.

Memorandum of Floodplain Compensation shall be provided in PDF format.

Subtask 5C – Landscape – 90-100% Construction Documents Additional Service

Description Continued development of all plans, drawings and documents with additional details, calculations and specifications for planting, tree disposition, hardscape, amenities and signage/wayfinding.

Development of irrigation plan to add:

Water source, design operating pressure and flow rate per zone, total volume required for typical depths of application and application rate Locations of pipes, controllers, valves, sprinklers, back flow prevention devices, rain switches or soil moisture sensors and electrical supply Irrigation details and installation notes

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 90-100% Landscape Documents and Drawings signed and sealed shall be digitally submitted in pdf format to the BDC project manager.

Subtask 5D – Signage & Wayfinding – 90-100% Construction Documents Additional Service

Description Finalization of signage design and wayfinding locations compliant with State Park Service guidelines

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable Full signage and wayfinding plans including layout and details of locations and specifications for manufacturing and installation shall be digitally submitted in pdf format to BDC project manager.

Subtask 5E – Exhibit Design – 75% Construction Documents Additional Service

Continued coordination with AOR, MEP and GC on all MEP requirements and LSS utility support, final exhibit designs and back of house exhibit requirements Copywriting for final text Identification of final imagery Finalize all scripts, media treatments and performance narratives Recommend pre-qualified fabricators for exhibits as needed Respond to all RFIs in writing

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 75% Construction Documents and Drawings shall be digitally submitted in pdf format to the BDC project manager.

Subtask 5F – Aquaria Life Support Systems – 75% Construction Documents Add’l Service

Description Continued development of aquaria and BACK OF HOUSE requirements through workshops, updates of scope, cost estimates, exhibition, habitat requirements facility requirements and impact plan.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Deliverable 75% Construction Documents for M/E/P for aquaria, including tank access platforms, lighting, FF&E and other back of house requirements, shall be digitally submitted in pdf format to the BDC project manager.

Subtask 5G – Acoustical Design - 90-100% Construction Documents Additional Service

Description Review of construction documents for acoustic qualities, sound attenuation and noise and reverberation control

Memorandum or acoustic qualities and anticipated performance signed and sealed shall be digitally submitted in pdf format to the BDC project manager.

Subtask 5H – Construction Documents Coral…