CN-370000-CN206-T4CO5.pdf
PDF 1004 KB Posted
- Contract number
- CN206
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form (Change Order No. 05) issued by the Florida Department of Environmental Protection (FDEP) under Contract CN206 for the Kissimmee Prairie Preserve State Park New Bunkhouse project. The consultant on this contract is Barnett Fronczak Barlowe & Schuler Architects (BFB&S), represented by David Fronczak. The project manager for FDEP is Jeffrey Whitfield, and the contract manager is Ralph Perkins. The change order was approved and digitally signed by all required parties on June 30, 2022, and July 1-7, 2022.
This change order authorizes additional architectural and engineering services for the complete design and permitting of a fire protection system for the bunkhouse and a 6,000-gallon water storage tank, as required by the State Fire Marshal office. The scope includes Subtask 4E (revisions to 100% construction documents to add fire protection) valued at $9,020.18 and Subtask 4F (fire protection 100% construction documents) valued at $3,644.22, for a combined net increase of $12,664.40. The original task end date of December 30, 2020 was extended by 365 days to December 31, 2021, and further extended to December 31, 2022 under this change order. The total contract value with all change orders is $84,642.68, with payment made upon FDEP approval of deliverables for each subtask. The deliverables consist of construction documents in hardcopy and PDF format at 90% and 100% completion levels.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN206-A1.pdf | ||
| CN-370000-CN206-CMC1.pdf | ||
| CN-370000-CN206-T3CO1.pdf | ||
| CN-370000-CN206-T4CO4.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN206-T4CO6.pdf | ||
| CN-370000-CN206-T4.pdf | ||
| CN-370000-CN206-TA1.pdf | ||
| CN-370000-CN206-TA2.pdf | ||
| CN-370000-CN206.pdf | ||
| CN-370000-CN206-T3.pdf | ||
| CN-370000-CN206-T4CO2.pdf | ||
| CN-370000-PL272-VCMC.pdf | ||
| CN-370000-CN206-CMC2.pdf | ||
| CN-370000-CN206-CMC3.pdf | ||
| CN-370000-CN206-T4CO4.pdf | ||
| CN-370000-CN206-T4CO7.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN206 04 05 61243C
Kissimmee Prairie Preserve State Park New Bunkhouse
Barnett Fronczak Barlowe & Schuler Architects
David Fronczak 850-224-6301 dfronczak@bfbsa.com
Ralph Perkins 850-245-2460 ralph.perkins@floridaDEP.gov
Complete design and permitting for a fire protection system for the bunkhouse as well as a 6,000 gallon water storage tank as required by State Fire Marshal office.
$ 4,333.70 $ 57,402.24 $ 61,735.94 $ 4,355.90 $ 67,622.38 $ 71,978.28
$ 0.00 $ 12,664.40 $ 12,664.40 $ 4,355.90 $ 80,286.78 $ 84,642.68
9/6/2019
12/30/2020
12/31/2021
12/31/2022
Diane Langston Diane Langston Digitally signed by Diane Langston Date: 2022.06.30 15:50:07 -04'00'
Jeffrey Whitfield Jeffrey Whitfield Digitally signed by Jeffrey Whitfield Date: 2022.07.01 10:16:12 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2022.07.06 13:35:41 -04'00'
David Fronczak David Fronczak Digitally signed by David Fronczak Date: 2022.07.06 13:55:46 -04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2022.07.07 09:46:54 -04'00'
61243C 37503000252 080039/20 423001 U3100 131500 QK $ 12,664.40
$ 12,664.40 chang_ld Inserted Text
Williams_BrD Text Box $12,664.59
Matson_d
CN206 TA 04
Kissimmee Prairie Bunk House (rev. 06/28/2022) FDEP Contract Number 61243C
Subtask 4E Revisions to the 100% Construction Documents to add Fire Protection
Description: The Architect and his Consultants will modify the 100% Construction Documents entitled Kissimmee Prairie ADA Cabin, Kissimmee Prairie Preserve State Park to add a wet pipe sprinkler system to the cabin and a 6,000 gallon fire water tank and jockey pump adjacent to the site to provide the local fire department a water source to contain a fire if needed.
The Scope of Work will include review of shop drawings, hydraulic calculations, the design of the fire water tank and calculations, a jockey pump to supply pressure to the system and material recommendations. The Scope of Work will also include electrical modifications for a new 2HP pump and controller and modifications to the existing Drawings to delineate fire alarm and power connections to the pump. The Work will also include design of a housekeeping pad to support the water tank.
Deliverable: The deliverable for this task is three full size 24"x36" hardcopies and one PDF format electronic file of 90% level of completion - 90% Construction Documents.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 4E: Revisions to Add Fire Protection Firm Name Position Classification Hourly Hours Total Fixed
Rate Price Cost Winton En.e.ineering Professional Engineer 140.00 20 $2,800.00 Winton Eneineering CADD Technician 59.60 37 $2,205.00
Winton Eneineering Prof. Eng. Travel (2 trips) 140.00 16 $2,240.00
Applied Research (Elec.) Professional Engineer 134.00 02 $268.00 Applied Research (Elec) CAD/Designer 59.00 02 $118.00
BNI Senior Principal 178.77 02 $357.54 BNI CADD Manager 93.86 02 $187.72
BFB&S (Architectural) Partner 108.55 04 $434.20 BFB&S Office Manager 48.10 08.514 $409.52
Total for Subtask 4E: $9,020.18 chang_ld Text Box $2,205.20 chang_ld
Kissimmee Prairie Bunk House (rev. 06/28/2022) FDEP Contract Number 61243C
Subtask 4F Fire Protection - 100% Construction Documents
Description: The Architect and his Consultants will provide final construction Documents described in Subtask 4E incorporating or addressing any Owner Review comments from the 90% submittal review.
Deliverable: The deliverable for this task is three full size 24"x36" signed and sealed hardcopies and one PDF format electronic file of 100% level of completion - 100% Construction
Documents.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 4F: Fire Protection - 100% Construction Documents Firm Name Position Classification Hourly Hours Total Fixed
Rate Price Cost Winton Engineering Professional Engineer 140.00 10 $1,400.00 Winton Engineering CADD Technician 59.60 06 $ 357.60
Winton Engineering Prof. Eng. Travel (2 trips) 140.00 08 $1,120.00
BFB&S (Architectural) Partner 108.55 04 $434.20 BFB&S Office Manager 48.10 6.911 $332.41
Total for Subtask 4F: $3,644.21 chang_ld Text Box chang_ld
Williams_BrD
3,644.22
Williams_BrD Text Box 9,020.18 chang_ld Text Box chang_ld
| CN206 TA4 CO5 form (002).pdf |
| CN206 TA4 CO5 (002).pdf |
File details come from the government source that posted it. Updated .