CN-370000-CN206-T4CO2.pdf
PDF 2 MB Posted
- Contract number
- CN206
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for the Kissimmee Prairie Preserve State Park Bunk House project. The change order involves the architectural firm Barnett Fronczak Barlowe & Shuler Architects (BFBSA), with David Fronczak, AIA serving as the consultant representative and Philip Stone as the FDEP Contract Manager. The document is Change Order No. 02 under FDEP Contract No. CN206, Task Assignment No. 04, Project No. 61243C.
The change order authorizes BFBSA to provide additional electrical design services for two RV camp sites located near the bunk house. Subtask 4C involves modifying design documents to include electrical notes/specifications, electrical legend, load calculations, power riser, panel schedule, power plan, and electrical details for the two new RV campsites. The deliverable consists of three full-size 24"x36" hardcopies and one half-size copy, plus a PDF file at 100% completion level. The net increase for this change order is $1,394.95 in fixed fee costs, bringing the total task amount from $68,367.25 to $69,762.20. The task end date was extended by 367 calendar days, from December 30, 2020 to December 31, 2021. The cost breakdown includes professional engineering services (3 hours at $134/hour), CAD/designer services (6 hours at $59/hour), partner architectural services (5 hours at $108.55/hour), and office manager services (2 hours at $48.10/hour). Payment will be made upon FDEP approval of deliverables.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN206-T3.pdf | ||
| CN-370000-PL272-VCMC.pdf | ||
| CN-370000-CN206-T4.pdf | ||
| CN-370000-CN206-T4CO5.pdf | ||
| CN-370000-CN206-TA1.pdf | ||
| CN-370000-CN206-TA2.pdf | ||
| CN-370000-CN206.pdf | ||
| CN-370000-CN206-A1.pdf | ||
| CN-370000-CN206-CMC1.pdf | ||
| CN-370000-CN206-T3CO1.pdf | ||
| CN-370000-CN206-T4CO4.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN206-T4CO6.pdf | ||
| CN-370000-CN206-CMC2.pdf | ||
| CN-370000-CN206-CMC3.pdf | ||
| CN-370000-CN206-T4CO4.pdf | ||
| CN-370000-CN206-T4CO7.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN206 04 02 61243C
Kissimmee Prairie Preserve State Park Bunk House
Barnett Fronczak Barlowe & Schuler Architects
David Fronczak, AIA 850-224-6301 dfronczak@bfbsa.com
Philip Stone 850-245-2570 philip.stone@floridadep.gov
Consultant shall provide additional electrical design services for two RV camp sites located near the bunk house. See proposal dated October 29, 2020.
$ 4,333.70 $ 57,402.24 $ 61,735.94 $ 4,333.70 $ 64,033.55 $ 68,367.25
$ 0.00 $ 1,394.95 $ 1,394.95 $ 4,333.70 $ 65,428.50 $ 69,762.20
9/6/19
12/30/20
12/30/20
12/31/21
Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2020.11.03 09:35:38 -05'00'
C Hewitt C Hewitt Digitally signed by C Hewitt Date: 2020.11.03 15:56:13 -05'00'
Philip Stone P.T. Stone Digitally signed by P.T. Stone Date: 2020.11.08 10:17:38 -05'00'
David Fronczak, AIA David Fronczak Digitally signed by David Fronczak Date: 2020.11.09 16:46:36 -05'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2020.11.12 15:24:14 -05'00'
61243C 37503000252 080039/20 423001 U3200 131500 QK $ 1,394.95
$ 1,394.95
29 October 2020
C. Hewitt, Project Manager
BARNETT
FRONCZ!\K
BARLO\VE
SHULER
\. R C II I I' f: C l S
Florida Department of Environmental Protection Bureau of Design and Construction Marjory Stoneman Douglas Building 3900 Commonwealth Building Tallahassee, Florida 32399-3000
RE: Kissimmee Prairie Bunk House Project Number 61243C; CN 206 -Task Assignment 4 RV Electrical Service- Change Order Request No. 2
MR. HEWITT, for your review, Barnett Fronczak Barlowe & Shuler Architects, has provided a Scope and Additional Fee Proposal to provide electrical service to two additional RV camp sites located near the bunk house at Kissimmee Prairie Reserve State Park. If you desire to proceed with this Change Order Request, the total Proposed Fees to BFBSA will increase by $1,394.95.
Please review the attached Subtask Item 4C of the Proposal Summary and Deliverables. If you have any questions or concerns, please do not hesitate to give me a call.
TI FRONCZAK BARLOWE & SHULER ARCHITECTS
DAVID FRONCZAK, AIA
Attachments
BARNETT FRONCZAK BARLOWE & SHULER ARCHITECTS, LLP AA P000382 2074 CENTRE POINTE BOULEVARD SUITE 200 TALLAHASSEE, Fl. 32308
TEL. 850 224-6301 FAX 850 561-6978
File details come from the government source that posted it. Updated .