Kissimmee Prairie Bunk House Task Assignment Summary
This document is a Task Assignment Notification Form between the Florida Department of Environmental Protection (FDEP) and Barnett Fronczak Barlowe & Shuler Architects (BFB&S), a professional architectural and engineering firm. The task assignment designates work under FDEP Contract No. CN206 and includes coordination with multiple consulting firms including WGI (surveying and civil engineering), Ardaman (geotechnical services), BNI (structural engineering), and Applied Research (mechanical and electrical engineering). The project, numbered 61243C, involves the design and construction administration of a new bunk house facility at Kissimmee Prairie Preserve State Park in Okeechobee, Florida.
The contract scope encompasses survey, geotechnical investigation, civil and architectural design, permitting, and construction administration services for a prefabricated four-bedroom bunk house adapted from the Blues Springs ADA Cabin prototype. The total contract value is $61,735.94, comprising a fixed price cost of $57,402.24 and cost reimbursement not to exceed $4,333.70 for expenses including permit fees, printing, mileage, and meals. Services are organized into fourteen subtasks spanning site visits, topographic surveys, 60% and 100% design documents, civil permitting, geotechnical reports, construction cost estimates, and construction phase administration with multiple site visits. Payment is conditioned upon FDEP approval of deliverables for each subtask. The project was assigned upon execution of the contract with a completion date of December 30, 2020, and funding is allocated across two fiscal years from different budget sources.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN206-A1.pdf | ||
| CN-370000-CN206-CMC1.pdf | ||
| CN-370000-CN206-T3CO1.pdf | ||
| CN-370000-CN206-T4CO4.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN206-T4CO6.pdf | ||
| CN-370000-CN206-T3.pdf | ||
| CN-370000-CN206-T4CO2.pdf | ||
| CN-370000-PL272-VCMC.pdf | ||
| CN-370000-CN206-CMC2.pdf | ||
| CN-370000-CN206-CMC3.pdf | ||
| CN-370000-CN206-T4CO4.pdf | ||
| CN-370000-CN206-T4CO7.pdf | ||
| CN-370000-CN206-T4CO5.pdf | ||
| CN-370000-CN206-TA1.pdf | ||
| CN-370000-CN206-TA2.pdf | ||
| CN-370000-CN206.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R . eds· eqwr ,1gnatures:
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Ad b s· o e 1gnature
FDEP Contract No.: I Owner's Name: I Project No.:
CN206
Task Assignment No:
04 FDEP 61243C
Project Location: Project Name:
Kissimmee Prairie Preserve State Park Bunk House
Consultant Name:
Barnett Fronczak Barlowe & Shuler Architects
Consultant Representative: Phone: Email:
David Fronczak, AIA 850-224-6301 dfronczak@bfbsa
FDEP Contract Manager: Phone: Email:
Jack Brady 850-245-2535 jack.brady@FloridaDEP.gov
Description of Task:
Consultant to provide survey, geotech, design, permitting, and construction administration services for a new bunk house at Kissimmee Prairie Preserve State Park. See proposal dated July 22, 2019.
Project Manager: c Hewitt
Start Date: I Upon execution Completion Date: I 12/30/20
A. Diane Langston
Budget Representative, FDEP
C Hewitt
Project Manager, FDEP
Jack Brady
Contract Manager, FDEP
David Fronczak, AIA
Consultant
Michael W. Foster Jr., P.E.
Contract Authority, FDEP
Project# Grant# Or2 Code
61243C 37503000252
61243C 37503000252
29 digit FLAIR Code:
Schedule
Fixed Price Cost: $ 57 402.24 Cost Reimbursement not to exceed: $4,333.70
Total Task Amount: $61 735.94 Approval Signatures:
Digitally signed by A Diane
A Diane Langston Langston Date: 2019.08.21 13:24:42 -04'00'
Signature
C Hewitt Digitally signed by C Hewitt Date: 2019.08.21 13:30:05-04'00'
Signature
J a Ck B rad Y Digitally signed by Jack Brady Dale: 2019.08.21 13:32:48 -04'00'
Signature
David Fronczak g:!
a 1 ro���� d o� y
1��;�13i'�;;���
Date
Date
Date
Date
Da iyfr
Cat/Year Fund Module Object Code EO Amount
080039/19 675002 U3100 131500 XR $22,000.00
080039/20 423001 U3100 131500 QK $39,735.94
Total: $ 61,735.94
23 May2019 19 June 2019 (rev.)
IO July 2019 (rev.)
22 July 2019 (rev.)
C. Hewitt, Project Manager
BARNETT
FRONCZAK
BARLOWE
.':SHllLER \.k C 11 IT EC TS
Florida Department of Environmental Protection Bureau of Design and Construction Marjory Stoneman Douglas Building 3900 Commonwealth Building Tallahassee, Florida 32399-3000
RE: Kissimmee Prairie Bunk House Project Number 61243C Proposal for Professional Services
MR. HEWITT, for your review, Barnett Fronczak Barlowe & Shuler Architects, has provided a proposal summary and man-hour documentation to site adapt, permit and construct the Blues Springs ADA Cabin designed as a Prototype Structure to be used at numerous site venues across the State at Kissimmee Prairie Preserve State Park. The following Task Summaries summarize our assumed Scope of Professional Services.
Subtask IA (Initial Site Visit) Subtask IB (Survey) Subtask 2A (60% Civil Engineering Plans) Subtask 2B (100% Civil Engineering Plans) Subtask 3A (Civil Permitting) Subtask 3B (Geotechnical) Subtask 4A (100% A/E Plans) Subtask 4B (Estimate) Subtask 5A (Civil CA) Subtask 5B (Civil Site Visits) Subtask 6A (Structural CA) Subtask 6B (Structural Site Visits) Subtask 7A (Arch./MEP CA) Subtask 7B (Arch./MEP Site Visits) Total
$ 1,719.20 $ 5,434.34 $ 7,265.60 $ 3,212.88 $ 3,419.24 $ 2,766.07 $ 7,507.36 $ 2,054.00 $ 1,713.12 $ 3,924.18 $ 1,268.06 $ 3,542.19 $ 2,879.70 $ 15,209.76 $61,735.94
BARNETT FRONCZAK BARLOWE & SHULER ARCHITECTS, llP AA P000381 1074 CENTRE POINTE BOULEVARD SUITE 100 TALLAHASSEE, fl. 31308
TEL. 850 114-6301 FAX 850 561-6978
Letter to C. Hewitt Proposal for Professional Services Page2
Please review the attached Proposal Summary and deliverables. If you have any questions or concerns, please do not hesitate to give me a call.
Attachments
Kissimmee Prairie Bunk House FDEP Contract Number 61243C
Subtask lA: Initial Site Visit
Description: Travel to Kissimmee Prairie Preserve State Park to meet with Alex Creager, Park
Manager and Kenneth Francis, DEP Project Manager. The Purpose of the trip is for the
Architect to get a general understanding of the Proposed Location of the bunk house and identify any Project Constraints.
Deliverable: Site meeting report in PDF format
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask I: Initial Site Visit Firm Name Position Classification Hourly Hours Total Fixed
Rate Price Cost BFB&S Partner 108.55 12 $1,302.60 BFB&S Office Manager 48.10 02 $ 96.20
Reimbursable Cost:
Mile e: 720 miles
Reimbursable Total Cost $ 320.40
Total for Subtask lA: $1,719.20
Subtask 1B: Survey
Description: Provide a topographic survey of the proposed bunk house site including ground elevations, existing above grade improvements and natural features found within the defined project limits. The defined limits will not exceed one acre in area.
The Work includes coordination by the Architect.
Deliverable: The deliverable for this task is five 24" x 36" hardcopies and one PDF format electronic file depicting the map of the topographic survey.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1B: Survey Finn Name Position Classification
WGI Sr. Professional Surveyor WGI CADD Technician
WGI Party Chief
WGI Inswument Person
WGI Rod Person
BFB&S Partner
BFB&S Office ManaQer
Total for Subtask 1B:
Hourly Rate
158.64 77.16 75.75 51.00 45.00
108.55 48.10
Subtask 2A; .. 60% Civil Engineering Construction Documents
Hours Total Fixed Price Cost
04 $ 634.56 08 $ 617.28 20 $ 1.515.00 20 $1,020.00 20 $ 900.00
06 $ 651.30 02 $ 96.20
$5,434.34
Description: The design and preparation of civil engineering construction documents for site and utility improvements to accommodate a new prefabricated 4 bedroom bunk house.
Anticipated design elements to include paving and drainage plans for the new parking spaces, water & sewer plans for new septic system and potable well. The potable water system design will include the location of the well and a performance specification for the well based on a 4 bedroom bunk house. Topographic survey will be provided by owner to accommodate civil engineering design if required.
The Work includes Coordination by the Architect.
Deliverable: The deliverable for this task is one 24"x36" hardcopy and PDF format electronic file of 60% level of completion design documents.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Fixed Price Cost:
Subtask 2A: 60% Civil Eneineering Construction Plans
Firm Name Position Classification
WGI Proiect Mana2er WGI Sr. Professional Engineer
WGI CADD Technician
BFB&S Partner
BFB&S Office Mana2er
Total for Subtask 2A:
Hourly Rate
125.46 118.26 77.16
108.55 48.10
Subtask 2B: Final Civil Engineering Construction Documents
Hours Total Fixed Price Cost
12 $1,505.52 16 $1,892.16 32 $2,469.12
12 $ 1,302.60 02 $ 96.20
$7,265.60
Description: The design and preparation of civil engineering construction documents for site and utility improvements to accommodate a new prefabricated 4 bedroom bunk house.
Anticipated design elements to include paving and drainage plans for the new parking spaces, water & sewer plans for new septic system and potable well. Plans will include the location for the proposed prefabricated bunk house. Topographic survey will be provided by owner to accommodate civil engineering design.
Deliverable: The deliverable for this task is one 24"x36" hardcopy and PDF format electronic file of final level of completion design documents.
The Work includes Coordination by the Architect.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Fixed Price Cost:
Subtask 2B: Final Civil Encineering Construction Plans Finn Name Position Classification
WGI Project Manager WGI Sr. Professional Engineer
WGI CADD Technician
BFB&S Partner
BFB&S Office Manager
Total for Subtask 2B:
Subtask 3A: Civil Permitting
Hourly Hours Total Fixed Rate Price Cost
125.46 04 $501.84
118.26 08 $946.08
77.16 16 $1,234.56
108.55 04 $ 434.20
48.10 02 $ 96.20
$3,212.88
Description: Preparation of permit application submittal packages to the following agencies:
• Okeechobee County Health Department (Septic System Permit)
• South West Water Management District (10-2 Self Certification)
This task includes the preparation of permit applications and submittals to the regulatory agencies. In addition, this task includes plan revision to incorporate regulatory agency comments into the design documents and responses to regulatory agency questions.
Reimbursable Costs include required permit application fees. The Work includes Coordination by the Architect
Deliverable:
Permit Application Submittal Package to Okeechobee County Health Department (OKHD) for septic system permit.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Fixed Price Cost:
Subtask 3A: OKHD Septic Permit Firm Name Position Classification
WGI Proiect Manager WGI Sr. Professional Engineer WGI CADD Technician
BFB&S Partner BFB&S Office Manager
Reimbursable Cost:
Permit Fee: FDEP Septic $515.00
Permit Fee Reimbursable Total Cost $515.00
Total for Subtask 3A:
Hourly Rate
125.46 118.26 77.16
108.55 48.10
Subtask 3B: Subsurface Soil Investigation and Geotechnical Report
Hours Total Fixed Price Cost
04 $ 501.84 08 $ 946.08 12 $ 925.92
04 $ 434.20 02 $ 96.20
$3,419.24
Description: Provide two (2) Standard Penetration Borings to a depth of 15 feet in accessible locations near the proposed cabin. Upon completion of the field exploration, provide laboratory testing and an engineering report which includes recommendations for site preparation, foundation design and other geotechnical aspects of the Project.
The Work includes coordination by the Architect.
Deliverable: The deliverable for this task i_s one signed and sealed hardcopy and PDF format electronic file of Final Geotechnical Report
Performance Measure: Deliverables will be reviewed by the Department to confinn they are
Fixed Price Cost:
Subtask 3B: Subsurface Soil Investigation and Geotechnical Report
Firm Name Position Classification Hourly Rate
Ardaman Senior Engineering Tech 63.57
Arda.man Project Engineer 111.87
Ardaman Senior Project Ernrineer 152.91
BFB&S Partner 108.55
BFB&S Office Manager 48.10
Total for Subtask 3B:
Hours Total Fixed Price Cost
8 $ 508.56 12 $ 1,342.44
4.25 $ 649.87
02 $ 217.10 01 $ 48.10
$2,766.07
Subtask 4A: 100% Architectural, Structural and MEP Construction Documents
Description: The Architect and Consulting Engineers will modify the 100% Construction
Documents entitled Blue Spring ADA Cabin, Blue Spring State Park to site adapt the cabin to the proposed location at Kissimmee Prairie Preserve State Park in Okeechobee, Florida. IT is assumed that the Structural Drawings will need to be modified to accommodate higher windloads. Soil Borings will be required to accommodate Structural Engineering design.
Deliverable: The deliverable for this task is one full size 24"x36" hardcopy, one half size copy and PDF format electronic file of I 00% level of completion 100% Construction Documents.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Fixed Price Cost:
Subtask 4A: 100% Construction Plans
Firm Name Position Classification
BNI (Structural) Senior Principal BNI Project Engineer BNI CADD Manager
Applied Research Professional Engineer Applied Research CAD/DesiQJler
BFB&S (Architectural) Partner BFB&S CAD Manager BFB&S Office Manager
Reimbursable Cost:
Hourly Hours Rate
178.77 02
83.43 12
93.86 08
134.00 16
59.00 16
108.55 10
69.24 12
48.10 04
Printing 60- 24 x 36 sheets @$1.85 per sheet and 60- 18 x 24 Sheets (ciJ $1.50 per sheet
Reimbursable Total Cost $201.00
Total for Subtask 4A:
Subtask 4B: Construction Cost Estimate of 100% Construction Documents
Total Fixed Price Cost
$357.54 $1,001.16
$750.88
$2,144.00 $944.00
$1,085.50 $830.88 $192.40
$7,507.36
Description: At the completion of the 100% Construction Document, the Architect will provide an estimate of the probable construction cost of the Kissimmee Prairie Bunk House. The basis of the estimate will be the 100% Construction Documents.
Deliverable: The deliverable for this task is five copies of the completed estimate and one PDF format electronic file.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Fixed Price Cost:
Subtask 4B: Construction Cost Estimate - 100% Construction Plans Firm Name Position Classification Hourly
Rate BFB&S Partner 108.55 BFB&S Construction Ad.min. 76.18 BFB&S Office Manager 48.10
Total for Subtask 4B:
Subtask SA: Civil Construction Phase Services
Hours Total Fixed Price Cost
04 $434.20 20 $1,523.60 02 $96.20
$2,054.00
Description: The Civil Engineer and Architect will perform the following construction phase services during construction:
• Review Shop Drawings provided by the Contractor;
• Respond to Contractor's request for information (RFI);
• Prepare and submit final certification with contractor and permitting agencies
Deliverable: The deliverable for this task are reviewed shop drawings, RFI responses and final certification statements in pdf format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask5A: Civil Construction Phase Services Firm Name Position Classification Hourly Hours Total Fixed
Rate Price Cost WGI Proiect Manru!er 125.46 04 $ 501.84 WGI Sr. Professional Engineer 118.26 08 $ 946.08
BFB&S (Architectural) Partner 108.55 02 $ 217.10 BFB&S Office Manager 48.10 01 $ 48.10
Total for Subtask SA: $1,713.12
Subtask SB Civil Construction Phase Services-Site Visits
Description: Perform the following construction phase services during construction:
• Attend up to two site visits during construction to ensure the work is completed in substantial accordance with the approved and permitted plans and specifications.
• Attend substantial completion inspection with contractor.
Deliverable: The deliverable for this task are field reports i-om site visits
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Subtask 5B: Construction Phase Services- Site Visit #1
Firm Name Position Classification
WGI Project Manager WGI Sr. Professional Engineer
Subtask 5B: Construction Phase Services - Site Visit #2
Firm Name Position Classification
WGI ProjectMan�er
WGI Sr. Professional En�neer
Subtask 5B: Construction Phase Services - Site Visit #3
Firm Name Position Classification
WGI Project Manager
WGI Sr Professional Engineer
Total for Visit #1: $ 1,308.06
Total for Visit #2: $ 1,308.06
Total for Visit #3: $ 1,308.06
Total for Subtask SB:
Hourly Rate
125.46 118.26
Hourly Rate
125.46 118.26
Hourly Rate
125.46 118.26
Hours Total Fixed Price Cost
1 $ 125.46 10 $ 1,182.60
Hours Total Fixed Price Cost
1 $ 125.46 10 $ 1,182.60
Hours Total Fixed Price Cost
1 $ 125.46 10 $1,182.60
$3,924.18
Subtask 6A: Structural Construction Phase Services
Description: The Civil Engineer and Architect will perform the following construction phase services during construction:
• Review Shop Drawings provided by the Contractor;
• Respond to Contractor's request for information (RFI);
Deliverable: The deliverable for this task are reviewed shop drawings, RFI responses and other communications during construction in pdf format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 6A: Structural Construction Phase Services Firm Name Position Classification Hourly Hours Total Fixed
Rate Price Cost BNI Senior Princioal 178.77 1.0 $ 178.77 BNI Project Engineer 83.43 8.0 $ 667.44
BFB&S (Architectural) Partner 108.55 03 $ 325.65 BFB Office Manager 48.10 02 $ 96.20
Total for Subtask 6A: $1,268.06
Subtask 6B Structural Construction Phase Services-Site Visits
Description: Perform the following construction phase services during construction:
• Attend up to three site visits during construction to ensure the work is completed in substantial accordance with the approved and permitted plans and specifications.
Deliverable: The deliverable for this task are field reports from site visits in pdfformat.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
IO
Subtao;;k 6B: Construction Phase Services - Site Visit #1 Firm Name Position Classification
BNI Senior Principal BNI Project Manager
Reimbursable Cost:
Hourly Rate
178.77 119.18
Mileru?:e: 220 miles(@. $0.445 per mile
Meals I (ii), $10. 00
Reimbursable Total Cost $107.90
Subtask 6B: Construction Phase Services- Site Visit #2 Firm Name Position Classification Hourly
Rate BNI Senior Principal 178.77 BNI Project Manager 119.18
Reimbursable Cost:
Mileage: 220 miles (a), $0.445 per mile
Meals I (iiJ $10. 00
Reimbursable Total Cost $107.90
Subtask 6B: Construction Phase Services - Site Visit #3 Firm Name Position Classification Hourly
Rate BNI Senior Princioal 178.77 BNI Project Manager 119.18
Reimbursable Cost:
Mileage: 220 miles (a), $0.445 per mile
Meals Reimbursable Total Cost
Total for Visit #1: $ 1,150.73
Total for Visit #2: $1,150.73 Total for Visit #3: $ I, 150. 73
Total for Subtask 6B:
I (iiJ $10. 00
$ 107.90
Hours Total Fixed Price Cost
0.5 $ 89.39 08 $ 953.44
Hours Total Fixed Price Cost
0.5 $ 89.39 08 $ 953.44
Hours Total Fixed Price Cost
0.5 $ 89.39 08 $ 953.44
$3,452.19
Subtask 7 A: Architectural and MEP Construction Phase Services
Description: The Civil Engineer and Architect will perform the following construction phase services during construction:
• Review Shop Drawings provided by the Contractor;
• Respond to Contractor's request for information (RFI);
Deliverable: The deliverable for this task are reviewed shop drawings, RFI responses and other submittal requirements in pdf format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 7 A: Architectural/MEP Construction Phase Services Firm Name Position Classification Hourly Hours Total Fixed
Rate Price Cost
Applied Research Professional Engineer 134.00 06 $ 804.00 (Mechanical Eng.)
Applied Research Professional Engineer 134.00 06 $ 804.00 (Electrical Engineer)
BFB&S (Architectural) Partner 108.55 10 $ 1.085.50 BFB&S Office Manager 48.10 02 $ 96.20
Total for Subtask 7 A: $2,789.70
Subtask 7B: Architectural and MEP Construction Phase Services
Description: The Civil Engineer and Architect will perform the following construction phase services during construction:
• Attend up to three site visits during construction by the Architect, Mechanical Engineer and Electrical Engineer to ensure that the work is completed in accordance with the approved and permitted plans and specifications;
• Attend substantial completion inspection with Contractor if required
Deliverable: The deliverable for this task are reviewed shop drawings, RFI responses and final certification statements in pdf format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 7B: Architectural/MEP Construction Phase Services •- Site Visit #1 Firm Name Position Classification Hourly Hours Total Fixed
Rate Price Cost
Applied Research Professional Engineer 134.00 10 $ 1,340.00 (Mechanical Engineer) Applied Research Professional Engineer 134.00 10 $ 1,340.00 (Electrical Engineer)
BFB&S (Architectural) Partner 108.55 12 $1,302.60 BFB&S Office Manager 48.10 02 $ 96.20
Reimbursable Cost· .
Milea.2:e: 2, 160 miles (a) $0. 445 per mile
Meals 3@$10.00
Reimbursable Total Cost $ 991.20
Subtask 7B: Architectural/MEP Construction Phase Services - Site Visit #2 Finn Name Position Classification 1 Hourly · Hours
Rate
Applied Research Professional Engineer 134.00 10 (Mechanical Ernrineer) Applied Research Professional Engineer 134.00 10 (Electrical Engineer)
BFB&S (Architectural) Partner 108.55 12 BFB&S Office Manager 48.10 02
Reimbursable Cost:
Mileage: 2.160 miles (a1 $0.445 ver mile
Meals 3 (a). $10.00
Reimbursable Total Cost $ 991.20
Subtask 7B: Architectural/MEP Construction Phase Services - Site Visit #3 Firm Name Position Classification Hourly
Rate
Applied Research Professional Engineer 134.00 (Mechanical Engineer) Applied Research Professional Engineer 134.00 (Electrical Engineer)
BFB&S (Architectural) Partner 108.55 BFB&S Office Manager 48.10
Reimbursable Cost:
Mileage: 2,160 miles (tu $0.445 ver mile
Meals Reimbursable Total Cost
Total for Visit #1: $ 5,070.00 Total for Visit #2: $ 5,070.00 Total for Visit #3: $ 5,070.00
Total for Subtask 7B:
3 (ti), $10.00
$ 991.20
Hours
Total Fixed Price Cost
$ 1,340.00
$ 1,340.00
$ 1,302.60 $ 96.20
Total Fixed Price Cost
$ 1,340.00
$ 1,340.00
$1,302.60 $ 96.20
$15,210.00
Proiect Schedule· .
Activity Duration (Calendar Days)
Subtask I A - Site Visit Subtask 1B - Survey Subtask 2A & 2B..:.. Civil Plans Subtask 3A: Civil Permitting Subtask 3B: Geotechnical Subtask 4A: I 00% A/E Plans Subtask 4B: Estimate Subtask 5A: Civil CA Subtask 5B: Structural CA Subtask 5C: Arch/Eng. CA
Summarv of Fees· .
0 I Calendar day 21 Calendar days 21 Calendar days
05 Calendar days 17 Calendar days 14 Calendar davs 05 Calendar days 01 Calendar day (ner visit) 01 Calendar day (per visit) 01 Calendar day (per visit)
Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 1 A - Site Visit $ 1,398.80 $ 320.40 Subtask I B - Survey $ 5,434.34 Subtask 2A & 2B - Civil $ 10,478.48 Plans Subtask 3A: Civil Permitting $ 2,904.24 $ 515.00 Subtask 3B: Geotechnical $ 2,766.07 Subtask 4A: 100% A/E Plans $ 7,306.36 $ 201.00 Subtask 4B: Estimate $ 2,054.00 Subtask 5A: Civil CA $ 1,713.12 Subtask 5B: Site Visits $ 3,924.18 Subtask 6A: Structural CA $ 1,268.06 Subtask 6B: Site Visits $ 3,128.49 $ 323.70 Subtask 7 A: Arch/Eng. CA $ 2,789.70 Subtask 7B: Site Visits $12,236.40 $2,973.60
Total Fixed Price Cost: $57,402.24 Total Reimbursable Cost: $ 4,333.70
Overall Total Cost: $61,735.94
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.