CN-370000-CN028-T6CO2.pdf
PDF 4 MB Posted
- Contract number
- CN028
- Issued by
- Florida
About this file
This document is a task assignment and change order for geotechnical engineering services for the Hugh Taylor Birch State Park Seawall Cap Repair/Revetment System Installation project. The contract involves Humiston & Moore Engineers, a coastal engineering firm, and the Florida Department of Environmental Protection (DEP). The specific contract number is CN028, and the task assignment is focused on providing professional engineering services for a seawall and dock infrastructure project.
The scope of work includes three primary tasks: site determination, standard penetration tests, and updating construction plans. The total budget for these services is $10,169.93, with specific fixed fees for each task ($960.10 for site determination, $7,365.88 for standard penetration tests, and $1,843.95 for construction plan updates). The project involves collecting geotechnical data to determine the minimum depth for driving sheetpiles and dock piles, with the goal of obtaining necessary approvals from local and federal agencies. The contract includes provisions for deliverables, performance measures, and a 30-day completion schedule for each task, with financial consequences for unsatisfactory work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN028-TA5.pdf | ||
| CN-370000-GC886-CO1.pdf | ||
| CN-370000-CN028-T3.pdf | ||
| CN-370000-CN028-A1.pdf | ||
| CN-370000-CN028-T2.pdf | ||
| CN-370000-CN028-T5CO1.pdf | ||
| CN-370000-CN028-TA4.pdf | ||
| CN-370000-CN028-TA6.pdf | ||
| CN-370000-CN028.pdf | ||
| CN-370000-CN028-T1.pdf | ||
| CN-370000-CN028-T1CO1.pdf | ||
| CN-370000-CN028-T6CO3.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CN028 TA6 CO2
Proposal-Geotech-CN028 TA6 CO2r1
File details come from the government source that posted it. Updated .