This document is a Consultant's Task Assignment Notification for the Florida Department of Environmental Protection (FDEP), specifically for the Belcher Road Seawall/Revetment System Renovations project. The primary parties involved are Humiston & Moore, Engineers, Inc. (the consultant), the Gasparilla Island Conservation and Improvement Association (GICIA), and Lee County. The contract number is CN028, with Task Assignment No. 01 and Project No. 40710, focused on Phase 1 Structural Analysis of the seawall/revetment system.
The contract involves three primary tasks with fixed fees: Task 1 (Site Visit) at $2,576, Task 2 (Analysis & Report) at $14,168, and an optional Task 3 (Presentation) at $1,944, totaling $18,688. The project requires a site visit, engineering analysis of beach profile and storm conditions using monitoring data, and potentially a presentation to local stakeholders. The contract specifies a 7-month timeline from task execution, with penalties for failing to meet performance criteria. The Gasparilla Island Conservation and Improvement Association will pay half the project cost ($9,344), and the work will involve evaluating storm protection capacity, lateral loadings, and potential erosion risks for the seawall/revetment system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN028-T6CO2.pdf | ||
| CN-370000-CN028-TA5.pdf | ||
| CN-370000-GC886-CO1.pdf | ||
| CN-370000-CN028-T3.pdf | ||
| CN-370000-CN028-A1.pdf | ||
| CN-370000-CN028-T2.pdf | ||
| CN-370000-CN028-T5CO1.pdf | ||
| CN-370000-CN028-TA4.pdf | ||
| CN-370000-CN028-TA6.pdf | ||
| CN-370000-CN028.pdf | ||
| CN-370000-CN028-T1CO1.pdf | ||
| CN-370000-CN028-T6CO3.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .