CN-370000-BS033-T10.pdf

PDF 665 KB Posted

Attached to
Master Agreement FL|BS033|394b771f468433aa3fad66b8f92f0728
Contract number
BS033
Issued by
Florida

About this file

This document is a Task Assignment Notification Form for DEP Contract No. BS033, issued by the Florida Department of Environmental Protection (FDEP) to Santa Cruz Construction, Inc. The form assigns Task 10, dated September 30, 2016, with FDEP Contract Manager Marisa Rhian and Contractor Contract Manager Lance Rodriguez overseeing execution.

Task 10 requires Santa Cruz Construction to herbicide 260 acres of cogongrass (Imperata cylindrica) at the Chicora Property located at 0 Highway 674, Mulberry, Florida 33860. The work involves controlling cogongrass using 2-4% glyphosate herbicide with a surfactant, applied via ATV/UTV and tractor by a foreman/crew leader and truck operator, with care taken to minimize damage to native species and trees. The contractor must complete work by December 23, 2016, with a final inspection report due by January 20, 2017, certifying 95% die-off of the cogongrass. The contract is structured on a fee schedule basis with a not-to-exceed amount of $26,540.00, comprised of $500.00 mobilization, $9,600.00 for foreman/crew leader and truck ($40/hour for 240 hours), $6,240.00 for cogongrass treatment with desirable trees ($60/hour for 104 hours), and $10,200.00 for cogan grass treatment with open field tractor ($75/hour for 136 hours). Deliverables include biweekly timesheets and labor submissions by Friday, monthly invoices submitted on the last weekday of each month, and final payment conditioned upon FDEP certification of the 95% die-off requirement.

View the file

Other files

File Type Posted
CN-370000-BS033-T6CO1.pdf PDF
CN-370000-BS033-T6CO2.pdf PDF
CN-370000-BS033-T8.pdf PDF
CN-370000-BS033-T9.pdf PDF
CN-370000-BS033-TA1.pdf PDF
CN-370000-BS033-T6.pdf PDF
CN-370000-BS033-TA2.pdf PDF
CN-370000-BS033.pdf PDF
CN-370000-BS033-A1.pdf PDF
CN-370000-BS033-CO1.pdf PDF
CN-370000-BS033-T2CO1.pdf PDF
CN-370000-BS033-TA3.pdf PDF
CN-370000-BS033-CO2.pdf PDF
CN-370000-BS033-T4.pdf PDF
CN-370000-BS033-T5.pdf PDF
CN-370000-BS033-T7.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

TASK ASSIGNMENT NOTIFICATION FORM

DEP CONTRACT NO. BS033

Task Assignment Number: __ 10 __________ Date _September 30, 2016 __

Contractor Name: ___ Santa Cruz Construction, Inc .. ___________ _

Contractor Contract Manager:_Lanoe Rodriguez. ______ Phone:_321452-3190 __

DEP Contract Manager: _Marisa Rhian. _________ Phone_863-578-1145 __

Task Description (Use additional sheet. if necessary):

Herbicide 260 acres of cogongrass (lmperata cyfindrica) at the Chicora Property (0 Highway 67 4, Mulberry, Florida 33860) 33830).

Specification of Task attached.

Deliverables (including due dates for each: _ Time sheets for all labor, and mobilization fee submitted by Friday on a biweekly basis. Monthly invoices shall be submitted on the last weekday of each month and shall include the time sheets and documentation of herbicide. Worf< for the task shall be completed by December 23, 2016. Final inspection report certified by the contractor shall be due by January 20, 2017. The final inspection report shan include all biweekly time sheets, documentation of the herbicide used, documentation of ?PPlicator certification by FOACS, and certification from the DEP contract manager that the 95% die off has been met. Final invoice will be submitted after certification by is received mim OEP contract manager

Task Tenn: Date of Task Execution through_ January 20, 2017

Task Assignment Type:

Fee Schedule

SANTA CRUZ CONSTRUCTION, INC.

cc: Procurement Section (MS93)

4ih/..

-¥fif!-

Bureau of Finance & Accounting (MS78} - 2 copies

Amount Not To Exceed:

$26,540.00

FLORIDA DEPARTMENT OF

ENVIRONMENT AL PROTECTION

Digitally signed by Marisa ch • Rhian {'l\(V�- ��- Date:2016.J0.0311:41:29

-04'00'

Contract Manager Date

APPROVED:

4ilf� o.re /0-

-�16

/(0 .. J.,{� Date

OEP Contract No. BS033, Attachment B, Page 1 of 4

File details come from the government source that posted it. Updated .