CMAgreement08032023ContinuingServiceEdition.pdf
PDF 515 KB Posted
- Attached to
- Continuing Service Contracts for Architectural Design & Construction Management Services
- Solicitation number
- 0561FAC-RFQ
- Issued by
- Hillsborough County, Florida
About this file
This is a Standard Construction Management Contract (Continuing Services Edition) between the School Board of Hillsborough County, Florida and a construction contractor for providing construction management services on a continuing basis for school facility projects. The contract establishes a framework for multiple individual projects, each defined through separate Task Orders that specify the scope of work, estimated construction cost, and design professional. Construction management services are divided into three phases: Scope Verification, Initial Budgeting and Schedule Development Services; Pre-Construction Phase Services; and Construction Phase Services. The contractor is responsible for teaming with design professionals to develop project scopes, budgets, and milestone schedules; reviewing construction documents for value engineering and constructability; providing detailed cost estimates; attending design and preconstruction conferences; and ultimately furnishing all management, supervision, labor, materials, equipment, and services necessary to complete construction work in accordance with contract documents. The contract includes liquidated damages provisions for failure to achieve substantial completion or final acceptance within specified timeframes, with daily damage amounts established in each Task Order.
Compensation is structured in three parts: a fixed lump sum for Scope Verification, Initial Budgeting and Schedule Development Services (to be determined in each Task Order); a fixed lump sum for Pre-Construction Phase Services with monthly installment payments based on percent completion; and reimbursement of Cost of the Work plus a Construction Management Fee calculated as a percentage of the final cost of work for Construction Phase Services. The contractor must provide a guaranteed maximum price (GMP) proposal for the total Construction Management Fee plus Cost of the Work, with the final GMP mutually agreed upon and documented in a GMP Amendment. Cost of the Work includes labor costs (with a maximum markup rate for labor burdens to be established at GMP), subcontract costs, materials and equipment, temporary facilities, miscellaneous costs such as bonds and permits, and other costs expressly approved in advance by the Owner in writing. When the Owner's construction budget exceeds $300,000, the contractor must provide Performance and Payment Bonds in the amount of 100 percent of the construction budget, underwritten by a surety company meeting specific financial and regulatory requirements. The contractor must retain five percent of monthly payments until fifty percent completion, then reduce retainage to two and one-half percent for subsequent payments. The contract is governed by Florida law and applies to projects in Hillsborough County.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD CONSTRUCTION MANAGEMENT CONTRACT
(Continuing Services Edition)
BETWEEN
THE SCHOOL BOARD OF HILLSBOROUGH COUNTY, FLORIDA
AND
CONTRACTOR
FOR
SERVICE PROVIDING SERVICES ON A CONTINUING BASIS
DATE: DATE OF AGREEMENT
Connect with Us • HillsboroughSchools.org • P.O. Box 3408 • Tampa, FL 33601-3408 • (813) 272-4000 Raymond O. Shelton School Administrative Center • 901 East Kennedy Blvd. • Tampa, FL 33602-3507
Velasco Student Services Building • 1202 E. Palm Avenue • Tampa, FL 33605
Velasco Office: 813-272-4112 • Fax: 813-272-4106
TABLE OF CONTENTS
Section 1. Contract Documents
Section 2. Scope of Work
Section 3. Relationship of Parties
Section 4. Contract Amount
Section 5. Cost of the Work
Section 6. Bonds
Section 7. Contract Time and Liquidated Damages
Section 8. Exhibits Incorporated
Section 9. Notices
Section 10. Modification
Section 11. Successors and Assigns
Section 12. Governing Law
Section 13. No Waiver
Section 14. Entire Agreement
Section 15. Severability
Section 16. Construction ii
Construction Management Agreement – (Continuing Service)
CONSTRUCTION MANAGEMENT SERVICES ON A CONTINUING BASIS DATE OF AGREEMENT
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
EXHIBITS
iii
CONSTRUCTION MANAGEMENT SERVICES ON A CONTINUING BASIS JANUARY 12, 2021
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
Exhibit A: General Terms and Conditions
Exhibit B: Supplemental Terms and Conditions
Exhibit C: Insurance Requirements
Exhibit D: Truth-In-Negotiation Certificate
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
CONSTRUCTION MANAGEMENT AGREEMENT
THE SCHOOL BOARD OF HILLSBOROUGH COUNTY, FLORIDA a body corporate existing under the laws of the State of Florida ("Owner"), hereby contracts with CONTRACTOR
("Construction Contractor"), a Florida corporation, to perform CONSTRUCTION MANAGEMENT
SERVICES ON A CONTINUING BASIS, for the period FROM & TO DATES, in Hillsborough
County, Florida. For each individual requirement (the "Project"), Owner shall establish the scope (the
"Work"), estimated construction cost, and the Architect and/or Engineer of Record ("Design
Professional") in a separate TASK ORDER.
Owner and Construction Contractor, for the consideration set forth in each TASK ORDER, agree as follows:
Section 1. Contract Documents
A. The Contract Documents consist of this Agreement, the Exhibits described in Section 8 hereof, the TASK ORDER, and any duly executed and issued addenda, Change Orders, Construction
Change Directives, Field Orders, and amendments relating thereto. Further, the term Contract
Documents shall include all plans and specifications for the construction of the Project ("Construction
Documents") being prepared by Design Professional, but only after said Construction Documents have been completed by Design Professional and approved in writing by Owner. All of the foregoing
Contract Documents are sometimes referred to herein as the "Contract".
B. Owner shall furnish Construction Contractor with one (1) sealed copy and one (1) reproducible set of the Construction Documents. Any additional copies of Construction Documents, required by Construction Contractor for execution of the Work, shall be made by Construction
Contractor from its reproducible set. The reproducible set of the Construction Documents shall be returned to Owner upon final acceptance of the Work or termination of the Contract, whichever occurs first. Provided, however, Owner is furnishing Construction Contractor a reproducible set of Construction
Documents for Construction Contractor's convenience and such furnishing by Owner shall not be deemed to be a waiver by Owner or Design Professional of any copyright, patent or license they may have with respect to the Construction Documents. All such copyrights, patents and licenses hereby being expressly reserved by Owner and Design Professional.
Section 2. Scope of Work
The Work to be provided by Construction Contractor pursuant to each TASK ORDER shall potentially be performed in three phases, with those phases being Scope Verification, Initial Budgeting and
Schedule Development Services; Pre-Construction Phase Services and Construction Phase Services. At the discretion of Owner, these three phases may overlap.
A. Scope Verification, Initial Budgeting and Schedule Development Services.
Construction Contractor shall team with the Design Professional to initially develop and confirm the
Owner’s outlined Scope, corresponding Budget, and Milestone Schedule (of all design and construction activities) to provide the Owner with sufficient detail so that the full magnitude of the project can be determined and shared with District personnel.
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
B. Pre-Construction Phase Services. Construction Contractor shall review and comment upon the Construction Documents being developed by Design Professional. The scope of that review shall include, but not be limited to, reviewing those various documents for value engineering and constructability. As the Construction Documents are developed by Design Professional through the various design phases set forth in the Design Professional Services Agreement between Design
Professional and Owner ("Design Agreement"), Construction Contractor shall provide Owner with detailed construction cost estimates with respect to those documents. Construction Contractor agrees to attend any and all design and preconstruction conferences and to otherwise assist and cooperate with
Design Professional with respect to the design of the Project. Construction Contractor shall provide all other services during the Pre-Construction Phase of the Project as set forth in the Contract Documents.
C. Construction Phase Services. After the Construction Documents have been sufficiently completed by Design Professional and approved by Owner for all of the Work (or such portions thereof as may be designated by Owner in writing), and Owner and Construction Contractor have agreed in writing upon the guaranteed maximum price to be paid Construction Contractor and the Contract Time for the Work (or designated portions thereof) as hereafter provided, Construction Contractor shall furnish and pay for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely and fully performed and complete in a good and workmanlike manner the construction of the Work (or designated portions thereof) in accordance with all of the terms and conditions of the Contract Documents.
Notwithstanding anything herein to the contrary, as and to the extent expressly directed and authorized by Owner in writing, Construction Contractor shall commence to construct those portions of the Work designated by Owner even though the guaranteed maximum price (GMP) and/or Contract Time for the entire Work has not yet been agreed to by the parties, so long as they have agreed in writing upon the compensation to be paid Construction Contractor and the performance time for such portion of the
Work.
Section 3. Relationship of Parties
A. Construction Contractor accepts the relationship of trust and confidence established by this Agreement. Construction Contractor covenants with Owner to cooperate with Design Professional;
to utilize Construction Contractor's best skill, efforts, and judgment in furthering the interest of Owner;
to furnish efficient business administration and supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in the best way and the most expeditious and economical manner, consistent with the interests of Owner. Further, Construction Contractor acknowledges that (i) it has represented to Owner that it has specific expertise in the planning, management and construction of school facilities and (ii) that such representation is a material inducement to Owner to enter into this Contract.
B. Wherever the terms of this Contract refer to some action, consent, or approval to be provided by Owner or some notice, report or document is to be provided to Owner, such reference to
"Owner" shall mean Owner, Owner's staff, or Owner's designee (to the extent such designee has been expressly authorized by Owner in writing), unless otherwise stated herein.
C. Owner may utilize the services of a Program Manager to assist it with the management of the design and construction of the Project. In the event Owner does utilize the services of a Program
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
Manager with respect to the Project, Owner shall notify Construction Contractor in writing of such decision and the Program Manager shall be deemed to be an Owner designee as referenced in Paragraph
B above. Further, to the extent Construction Contractor is required to name Owner as an additional insured under any insurance policy to be maintained by Construction Contractor pursuant to the terms of the Contract Documents, Construction Contractor shall cause the Program Manager to also be named as an additional insured party under all such policies. If so, designated for the Project, Program Manager shall be Owner's representative with respect to the Project, with authority to transmit instructions, receive information, and interpret and define Owner's policies and decisions with respect to the Work.
However, except as may be otherwise expressly authorized in writing by Owner, the Program Manager is not authorized on behalf of Owner to issue any verbal or written orders or instructions to Construction
Contractor that would have the effect, or be interpreted to have the effect, of amending or modifying the terms or conditions of the Contract Documents or modifying or amending in any way whatever the: (1) scope or quality of Work to be performed and provided by Construction Contractor as set forth in the
Contract Document; (2) the time within which Construction Contractor is obligated to complete the
Work; or (3) the amount of compensation Owner is obligated or committed to pay Construction
Contractor as set forth in the Contract Documents.
D. For each TASK ORDER, Construction Contractor shall designate a Project Manager, with full authority to bind and obligate Construction Contractor on all matters arising out of or relating to the
Work or the Contract Documents. Construction Contractor agrees that the Project Manager shall devote whatever time is required to satisfactorily manage the Work and further agrees that the Project Manager shall not be removed or replaced by Construction Contractor without Owner's prior approval, which approval shall not be unreasonably withheld.
Section 4. Contract Amount
In consideration of the full and faithful performance by Construction Contractor of the covenants in this Contract, Owner agrees to pay, or cause to be paid, to Construction Contractor the amounts set forth in each TASK ORDER (the "Contract Amount"), in accordance with the terms of this Contract:
A. Scope Verification, Initial Budgeting and Schedule Development Services. For all scope verification, initial budgeting and schedule development services, including, but not limited to, providing value engineering services, reviewing Construction Documents for constructability, assisting and meeting with Design Professional during the various design phases, and preparing cost estimates, Construction Contractor shall receive the fixed amount of TO BE DETERMINED Dollars ($TBD) as the total lump sum compensation for its services. NOTE: This contract item is only applicable when specifically requested by the Owner in the Task Order.
B. Pre-Construction Phase Services. For all Pre-Construction Phase Services, including, but not limited to, providing value engineering services, reviewing Construction Documents for constructability, assisting and meeting with Design Professional during the various design phases, and preparing cost estimates, Construction Contractor shall receive a fixed, lump sum amount set forth in each TASK ORDER as the total lump sum compensation for its services. Monthly installment payment of the total lump sum compensation shall be based upon the percent completion of the designated portion of the Pre-Construction Services for each particular month and Owner's receipt of Construction
Contractor's written invoice for such payment, said invoice to be in a form reasonably acceptable to
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
Owner. The final invoice shall not be submitted until either (i) the GMP Amendment is executed for the entire Work, or (ii) the parties fail to reach agreement on the GMP Amendment and Owner elects to terminate this Contract as provided in section 4.C hereafter, whichever occurs first. It is agreed that the value of the Pre-Construction Phase Services is to be treated separately and, therefore, excluded from the GMP amount.
C. Construction Phase. With respect to the Construction Phase Services to be provided by
Construction Contractor hereunder, Owner shall reimburse Construction Contractor for the Cost of the
Work (as that term is defined hereafter) and pay Construction Contractor a Construction Management
Fee calculated at PERCENTAGE IN TEXT percent for (NUMERICAL PERCENTAGE%) of the
FINAL Cost of the Work – excluding the cost of the Construction Managers Payment & Performance
Bonds, General & Excess Liability Insurance premiums and Subcontractor Default Insurance (SDI) premiums. The Construction Management Fee shall be Construction Contractor's total compensation for all overhead not reimbursable as Cost of the Work under Section 5.A. below, as well as Construction
Contractor's total profit for Construction Phase Services. Construction Contractor agrees to provide
Owner with a guaranteed maximum price proposal for the total sum of the Construction Management
Fee plus the Cost of the Work within the time frames established by the Master Project Schedule included in each TASK ORDER. The guaranteed maximum price proposal shall be based upon the previous cost estimates provided by Construction Contractor as required hereunder. Further, the proposal shall be broken down into the categories and level of detail required by Owner. Construction
Contractor agrees that all of its books, records and files, with respect to its development of the guaranteed maximum price proposal, shall be open to Owner for review and copying. The final guaranteed maximum price shall be mutually agreed upon by Owner and Construction Contractor and shall be set forth in the GMP Amendment. The form for GMP Amendment is that prescribed by the
Owner on the Owner’s Web Page as of the date of the TASK ORDER for the Project. Construction
Contractor shall provide a detailed breakdown acceptable to Owner of its guaranteed maximum price proposal. For each line item in the GMP, Construction Contractor shall record on the Schedule of Values all variances and deviations between the bid amount originally submitted for that line item and the final line-item price incorporated into the GMP. Construction Contractor guarantees that in no event shall the
Construction Management Fee and the total Cost of the Work exceed the GMP, as the GMP may be adjusted pursuant to the terms herein for Change Orders and Construction Change Directives. In the event Construction Contractor and Owner fail to reach an agreement on the GMP, Owner may elect to terminate the Contract. In the event of any such termination, Construction Contractor shall be entitled to receive that portion of the Contract Amount attributable to the Pre-Construction Phase Services earned through the date of termination plus that portion of any earned compensation associated with any
Construction Phase Services provided, to the extent such services were expressly approved in advance and in writing by Owner; but Construction Contractor shall not be entitled to any further or additional compensation from Owner, including but not limited to damages or lost profits on portions of the Work not performed.
Section 5. Cost of the Work
A. Costs to be Reimbursed. The term Cost of the Work shall mean all costs necessarily and reasonably incurred by Construction Contractor in the proper performance of the Construction Phase
Services portion of the Work. Such costs shall be at rates not higher than the standard paid at the place of the Project except with the prior written consent of Owner only after Construction Contractor has
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
provided sufficient support in writing that exceptional circumstances exist, which justify the payment of rates higher than the standard. The Cost of the Work shall include only those items set forth below in this subsection A:
1. Labor Costs.
a. Actual wages of the Construction Contractors staff and other construction workers directly employed by Construction Contractor to perform the construction of the Work at the Project site or, with Owner's written agreement, at off-site workshops. Costs to be reimbursed will be the actual wages paid to these individuals performing the project work.
b. Actual wages or salaries of Construction Contractor's supervisory and administrative personnel whether stationed at the Project site or offsite, but only for that portion of their time required for the Work and only with
Owner's written agreement.
c. Actual wages and salaries of Construction Contractor's supervisory and administrative personnel engaged at factories, workshops or on the road in expediting the production or transportation of materials or equipment required for the Work, but only for that portion of their time required for the Work and only with Owner's written agreement as in subsection A.1.b above.
d. The parties hereby establish a maximum markup rate of PERCENTAGE
IN TEXT percent (NUMERICAL PERCENTAGE%) for all labor burdens, including all taxes, insurance, contributions, assessments and benefits required by law and/or collective bargaining agreements and, for personnel not covered by such agreements, customary benefits such as medical and health insurance premiums, pensions (i.e., 401K) and vehicle allowances, provided such markup is applied only on those wages and salaries included in the Cost of the Work under subsections A.l.a through
A.1.c above, at the actual rates incurred subject to the maximum established herein. Holiday pay, vacation pay, sick time pay, cell phone costs and bonuses are explicitly excluded from this allowed markup.
Allowable billing rates for the markup shall be determined and agreed to at the time the GMP is established. However, the actual cost of the items included in the mark-up percentage will be verified through a final accounting at the conclusion of the project where a payment adjustment will be made to reflect the actual cost.
2. Subcontract Costs. Payments made by Construction Contractor to subcontractors in accordance with the requirements of the applicable written subcontracts.
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
3. Cost of Materials and Equipment Incorporated into the Completed Construction.
a. Costs, including transportation, of materials and equipment incorporated or to be incorporated in the completed construction.
b. Costs of materials described in subsection A.3.a, above, in excess of those actually installed but required to provide reasonable allowance for waste and for spoilage. Unused excess materials, if any, shall be handed over to
Owner at the completion of the Work or, at Owner's option, shall be sold by Construction Contractor; amounts realized, if any, from such sales, shall be credited to Owner as a deduction from the Costs of the Work.
4. Costs of other materials and equipment, temporary facilities, and related items.
a. Costs, including transportation, installation, maintenance, dismantling and removal, of materials, supplies, temporary facilities (including project field offices, furniture and fixtures), temporary utilities, machinery, equipment, and hand tools not customarily owned by the construction workers, which are provided by Construction Contractor at the Project site and fully consumed in the performance of the Work; and costs less salvage value on such items if not fully consumed, whether sold to others or retained by Construction Contractor.
b. Rental charges, at standard industry rates for the area, for temporary facilities, machinery, equipment, and hand tools not customarily owned by the construction workers, which are provided by Construction Contractor at the Project site, whether rented from Construction Contractor or others, and costs of transportation, installation, minor repairs, and replacements, dismantling and removal thereof. Rates and quantities of all equipment rented, whether from Construction Contractor or others, shall be subject to
Owner's prior written approval.
c. Cost of removal and proper disposal of debris from the Project site.
d. Reproduction costs, costs of telegrams, long distance telephone calls, postage and parcel delivery charges and telephone service at the Project site and reasonable petty cash expenses of the Project site office.
e. That portion of the reasonable travel and subsistence expenses of
Construction Contractor's personnel assigned to the Project site, incurred while traveling outside of the Tampa/Hillsborough County metropolitan area in discharge of duties connected with the Work, provided all of such expenses and charges shall be subject to the prior written approval of
Owner.
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
5. Miscellaneous Costs.
a. That portion of any separate premiums for (i) bonds directly attributable to this Contract and (ii) any additional insurance coverages which are purchased by Construction Contractor, with Owner's prior written approval, beyond the level of coverage specified herein.
b. Sales, use or similar taxes imposed by a governmental authority which are related to the Work and for which Construction Contractor is liable.
c. Fees and assessments for the building permit and for other permits, licenses and inspections for which Construction Contractor is required by the Contract Documents to pay.
d. Fees of testing laboratories for tests required by the Contract Documents, except those related to defective or nonconforming Work for which reimbursement is excluded pursuant to the terms of this Contract.
e. Royalties and license fees paid for the use of a particular design, process or product required by the Contract Documents.
f. Deposits lost for causes other than Construction Contractor's fault or negligence.
g. Legal, mediation and arbitration costs, other than those arising from disputes between Owner and Construction Contractor, reasonably incurred by Construction Contractor in performance of the Work and with Owner's prior written consent, said consent to be given or denied in Owner's sole discretion.
h. Costs reasonably incurred in repairing or correcting damage or nonconforming Work executed by Construction Contractor, or its subcontractors or suppliers, provided that such damage or nonconforming
Work was not caused by (i) the negligence or failure to fulfill a specific responsibility of Construction Contractor to Owner set forth in the
Contract Documents, or (ii) Construction Contractor's foremen, engineers, superintendents or other supervisory, administrative or managerial personnel, or (iii) the failure of Construction Contractor's personnel to supervise adequately those portions of the Work to be performed by
Construction Contractor's subcontractors or suppliers, and only to the extent that the cost of repair or correction is not recoverable by
Construction Contractor from (i) insurance or bonds, (ii) any of the subcontractors or suppliers, or (iii) some other appropriate source.
6. Other Costs. Other costs incurred in the proper performance of the Work in accordance with the Construction Documents if and to the extent approved in advance in writing by Owner.
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
B. Costs Not to Be Reimbursed. The Cost of the Work shall not include the following items:
1. Salaries and other compensation of Construction Contractor's personnel stationed at Construction Contractor's principal office or offices other than the Project site office, except as otherwise provided in subsection A.1.b above.
2. Expenses of Construction Contractor's principal office and offices other than the
Project site office.
3. Overhead and general expenses, except as may be expressly included in subsection A above.
4. Construction Contractor's capital expenses, including interest on Construction
Contractor's capital employed for the Work.
5. Rental costs of machinery and equipment, except as specifically provided in subsection A.4.b above.
6. Except as expressly provided in subsection A.5.h. above, costs due to the fault or negligence of Construction Contractor, subcontractors, anyone directly or indirectly employed by any of them, or for whose acts any of them may be liable, including, but not limited to, costs for the correction of damaged, defective, or nonconforming Work, disposal and replacement of materials and equipment incorrectly ordered or supplied, and making good damage to property not forming part of the Work.
7. Any costs not specifically and expressly described in subsection A above.
8. Costs which would cause the GMP to be exceeded (as the GMP may be adjusted pursuant to the terms herein for Change Order and Construction Change
Directive).
C. Discounts, Rebates and Refunds.
1. Cash discounts obtained on payments made by Construction Contractor shall accrue to Owner if (i) before making the payment, Construction Contractor included them in an application for payment and received payment therefore from
Owner, or (ii) Owner has deposited funds with Construction Contractor with which to make payments; otherwise, cash discounts shall accrue to Construction
Contractor. Trade discounts, rebates, refunds, and amounts received from sales of surplus materials and equipment shall accrue to Owner and Construction
Contractor shall make provisions so that they can be secured.
2. Amounts which accrued to Owner in accordance with the provisions of subsection
C.1. above shall be credited to Owner as a deduction from the Cost of the Work.
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
Section 6. Bonds
A. When Owner's Construction Budget as set for in each TASK ORDER exceeds three hundred thousand dollars ($300,000), Construction Contractor shall provide Owner with Performance and Payment Bonds, in the form prescribed by the Owner on the Owner’s Web Page as of the date of this agreement, in the amount of 100% of the total sum of the Owner’s Construction Budget for the work as set for in the TASK ORDER, the costs of which are to be paid by Construction Contractor.
Construction Contractor shall provide any required bonds within ten (10) business days after execution of a TASK ORDER by Owner and Construction Contractor (unless a later submittal is expressly approved in writing by Owner). The Performance and Payment Bonds must comply with the following provisions and must be otherwise acceptable to Owner:
1. The Bonds must be underwritten by a surety company which has a currently valid
Certificate of Authority issued by the State of Florida, Department of Insurance, authorizing it to write surety bonds in the State of Florida.
2. The surety company shall have currently valid Certificate of Authority issued by the United States Department of Treasury under Sections 9304 to 9308 of Title 31 of the United States Code.
3. The surety company shall be in full compliance with the provisions of the Florida
Insurance Code.
4. The surety company shall have at least twice the minimum surplus and capital required by the Florida Insurance Code at the time the bond is issued.
5. The Bonds must be fully performable in Florida, with service and venue in
Hillsborough County, Florida.
6. If the GMP exceeds $500,000.00, the surety company shall also comply with the following provisions:
a. The surety company shall have at least the following minimum ratings in the latest issue of Best's Key Rating Guide:
CONTRACT POLICYHOLDER'S
RATING
REQUIRED
FINANCIAL RATING
$ 500,000 to 1,000,000
1,000,000 to 2,500,000
2,500,000 to 5,000,000
5,000,000 to 10,000,000
10,000,000 to 25,000,000
25,000,000 to 50,000,000
50,000,000 to 75,000,000
A
A
A
A
CLASS IV
CLASS V
CLASS VI
CLASS VII
CLASS VIII
CLASS IX
CLASS X
b. The surety company shall not expose itself to any loss on any one risk in an amount exceeding ten (10) percent of its surplus to policyholders, provided:
https://www.sdhc.k12.fl.us/doc/list/construction/accounting-insurance/24-783/
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
(1) Any risk or portion of any risk being reinsured shall be deducted in determining the limitation of the risk as prescribed in this section.
These minimum requirements shall apply to the reinsuring carrier providing authorization or approval by the State of Florida, Department of Insurance to do business in this state have been met.
(2) In the case of a surety insurance company, in addition to the deduction for reinsurance, the amount assumed by any co-surety, the value of any surety deposited, pledged, or held subject to the consent of the surety and for the protection of the surety shall be deducted.
B. If the surety for any bond furnished by Construction Contractor is declared bankrupt, becomes insolvent, its right to do business is terminated in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, Construction Contractor shall, within five (5) calendar days thereafter, substitute another bond and surety, both of which shall be subject to the minimum requirements noted above and Owner's approval.
C. In accordance with the requirements of Section 255.05(1)(a), Florida Statutes, Construction Contractor shall record within 5 days in the Public Records of Hillsborough County, Florida, a copy of the Performance and Payment Bonds. Construction Contractor shall deliver within 10 days to Owner evidence, reasonably acceptable to Owner, of the recording of said Bonds. The delivery of such evidence is a condition precedent to Owner's obligation to make any progress payments to
Construction Contractor hereunder.
D. Upon establishment of the GMP, the dollar amount of coverage provided by the bond shall be adjusted to an amount not less than the GMP and shall be adjusted thereafter as the GMP is adjusted by change orders other than those associated with Owner Direct Purchase. In the event of a decrease in required bond coverage, the Owner shall be entitled to a credit of the applicable bond premium.
Section 7. Contract Time and Liquidated Damages
A. Time is of the essence in the performance of the Work under this Contract. Contractor shall commence the Pre-Construction Phase Services portion of the Work within five (5) calendar days after execution of the TASK ORDER for the Work unless a later date for commencement of Pre-
Construction Phase Services is established in writing by the Owner. Any Work performed by
Construction Contractor prior to execution of a TASK ORDER shall be at the sole risk of Construction
Contractor. The "Construction Phase Commencement Date" shall be established in the GMP
Amendment. Construction Contractor shall commence the Construction Phase Services portion of the
Work within five (5) calendar days after the Construction Phase Commencement Date. No portion of the
Work, with respect to the Construction Phase Services to be provided hereunder, shall be performed prior to the Construction Phase Commencement Date, unless expressly approved in advance by Owner in writing. The total period of time beginning with the Construction Phase Commencement Date and ending on the date of Substantial Completion of the Work is referred to hereafter as the "Contract
Time". The Contract Time is set forth with more specificity in Paragraph B below.
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
B. Because the Work is to be completed in three phases, the timely completion of the first phase is critical to the timely completion of the second phase and, therefore, completion of the entire
Project. Accordingly, Construction Contractor agrees to provide the Pre-Construction Phase Services in accordance with the Master Project Schedule Milestones included with each TASK ORDER. With respect to the Construction Phase Services, the GMP Amendment shall include the date that portion of the Work associated with the Construction Phase Services must be substantially completed by
Construction Contractor. That Substantial Completion date shall be established in terms of calendar days after the Construction Phase Commencement Date. In the event Construction Contractor and Owner fail to reach an agreement on the Contract Time and the Substantial Completion date, Owner may elect to terminate this Contract. In the event of any such termination, Construction Contractor shall be entitled to receive that portion of the Contract Amount attributable to the Pre-Construction Phase Services earned to the date of termination plus that portion of any earned compensation associated with any Construction
Phase Services provided, to the extent such services were expressly approved in advance and in writing by Owner; but Construction Contractor shall not be entitled to any further or additional compensation from Owner, including but not limited to damages or lost profits on portions of the Work not performed.
Substantial Completion of the Work shall be achieved when the Work has been completed to the point where Owner can occupy or utilize the Work for its intended purpose, and the Design Professional shall certify the date Substantial Completion of the Work is achieved. If Owner has designated portions of the
Work to be turned over to Owner prior to Substantial Completion of the entire Work, Design
Professional shall certify the date as to when Substantial Completion of such designated portions of the
Work have been achieved. The entire Work shall be fully completed and ready for final acceptance by
Owner within THIRTY (30) calendar days after the Substantial Completion date, or within THIRTY
(30) calendar days after Construction Contractor's receipt of the punch list, whichever date occurs last.
C. Owner and Construction Contractor recognize that, since time is of the essence for this
Contract, Owner will suffer financial loss if the Work associated with the Construction Phase is not substantially completed or finally accepted within the times specified in the GMP Amendment, as said time may be adjusted as provided for herein. In such event, the total amount of Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify, because this is a public construction project that will, when completed, benefit the public and enhance the delivery of valuable education to the public, in Hillsborough County, Florida. It is hereby agreed that it is appropriate and fair that Owner receive liquidated damages from Construction Contractor, if Construction Contractor fails to achieve
Substantial Completion of the Work or portions thereof designated for earlier completion within the required time periods. Should Construction Contractor fail to substantially complete the Work or portions thereof designated for earlier completion within the required time periods, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, the amounts set forth in each TASK
ORDER for each calendar day thereafter until Substantial Completion of the work or designated portion is achieved. Additionally, should any classrooms be unsuitable for occupancy on a student day as established by the student calendars available on the Owner’s website, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, the amounts set forth in each TASK ORDER per classroom for each student day for which occupancy is precluded. Should Construction Contractor fail to satisfy all requirements for final acceptance of the Work as described in Paragraph 22.2 of Exhibit A herein within the required time period, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, the amounts set forth in each TASK ORDER for each calendar day thereafter until the final acceptance requirements are met. Construction Contractor hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty, which the parties https://drive.google.com/file/d/1ryoW8I-36QZ7LxWaO08UGXwnoNdmpQeg/view
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
agree represents a fair and reasonable estimate of Owner's actual damages at the time of contracting if
Construction Contractor fails to substantially complete the Work in a timely manner.
D. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday or
Sunday or on a day made a legal holiday by the laws of Florida, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday, or legal holiday. The term "business day" as used herein shall mean all days of the week excluding
Saturdays, Sundays and all legal holidays observed by Owner.
Section 8. Exhibits Incorporated
The following documents are expressly agreed to be incorporated by reference and made a part of this Agreement.
Exhibit A: General Terms and Conditions
Exhibit B: Supplemental Terms and Conditions
Exhibit C: Insurance Requirements
Exhibit D: Truth-In-Negotiations Certificate
Section 9. Notices
A. All notices required or made pursuant to this Contract by Construction Contractor to
Owner shall be in writing and may be given either (i) by mailing same by United States mail with proper postage affixed thereto, certified, return receipt requested, or (ii) by sending same by Federal Express, Express Mail, Airborne, Emery, Purolator or other expedited mail or package delivery, (iii) by hand delivery to the appropriate address as herein provided, or (iv) by telecopy with confirmation copy to be mailed. Notices required hereunder shall be directed to the following address:
Hillsborough County Public Schools
ATTN: Deputy Superintendent of Operations
Operations Division
1202 E. Palm Avenue
Tampa, Florida 33605-3512
B. All notices required or made pursuant to this Contract by Owner to Construction
Contractor shall be made in writing and may be given either (i) by mailing same by United States mail with proper postage affixed thereto, certified, return receipt requested, or (ii) by sending same by
Federal Express, Express Mail, Airborne, Emery, Purolator or other expedited mail or package delivery,
(iii) by hand delivery to the appropriate address as herein provided, or (iv) by telecopy with confirmation copy to be mailed. Notices required hereunder shall be directed to the following address:
CONTRACTOR
ADDRESS
CITY, STATE, ZIP
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
C. Either party may change its above-noted address by giving written notice to the other party in accordance with the requirements of this Section.
Section 10. Modification
No modification or amendment to the Contract shall be valid or binding upon the parties unless in writing and executed by the party or parties intended to be bound by it.
Section 11. Successors and Assigns
Subject to other provisions hereof, the Contract shall be binding upon and shall inure to the benefit of the successors and assigns of the parties to the Contract.
Section 12. Governing Law
The Contract shall be interpreted under, and its performance governed by the laws of the State of
Florida.
Section 13. No Waiver
The failure of Owner to enforce at any time or for any period of time any one or more of the provisions of the Contract shall not be construed to be and shall not be a waiver of any such provision or provisions or of its right thereafter to enforce each and every such provision.
Section 14. Entire Agreement
Each of the parties hereto agrees and represents that the Contract comprises the full and entire agreement between the parties affecting the Work contemplated, and no other agreement or understanding of any nature concerning the same has been entered into or will be recognized, and that all negotiations, acts, work performed, or payments made prior to the execution hereof shall be deemed merged in, integrated and superseded by the Contract. This agreement shall also supersede and nullify all terms and conditions of purchase orders issued in conjunction with this agreement to facilitate
OWNER processing of payments.
Section 15. Severability
Should any provision of the Contract be determined by a court to be unenforceable, such a determination shall not affect the validity or enforceability of any other section or part thereof.
Section 16. Construction
Unless the context of this Contract otherwise clearly requires, references to the plural include the singular, references to the singular include the plural. The term "including" is not limiting, and the terms
"hereof', "herein", "hereunder", and similar terms in this Contract refer to this Contract as a whole and not to any particular provision of this Contract, unless stated otherwise. Additionally, the parties hereto acknowledge that they have carefully reviewed this Contract and have been advised by counsel of their
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
choosing with respect thereto, and that they understand its contents and agree that this Contract shall not be construed more strongly against any party hereto, regardless of who is responsible for its preparation.
IN WITNESS WHEREOF, the parties have executed this Agreement on the date(s) indicated below.
OWNER:
The School Board of HILLSBOROUGH
COUNTY, FLORIDA, a body corporate
By:__________________________________
Christopher Farkas
Deputy Superintendent of Schools
CONTRACTOR:
CONTRACTOR
By:_______________________________
Print Name:________________________
Title: _____________________________
A-1
CONSTRUCTION MANAGEMENTSERVICES ON A CONTINUING BASIS DATE OF AGREEMENT
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
EXHIBIT A
GENERAL TERMS AND CONDITIONS
TABLE OF CONTENTS
1. INTENT OF CONTRACT DOCUMENTS
2. INVESTIGATION AND UTILITIES
3. SCHEDULE
4. PROGRESS PAYMENTS
5. PAYMENTS WITHHELD
6. FINAL PAYMENT
7. SUBMITTALS AND SUBSTITUTIONS
8. PRE-CONSTRUCTION PHASE SERVICES
9. CONSTRUCTION PHASE SERVICES
10. DAILY REPORTS, RECORD CONTRACT DOCUMENTS AND MEETINGS
11. CONTRACT TIME AND TIME EXTENSIONS
12. CHANGES IN THE WORK
13. CLAIMS AND DISPUTES
14. OTHER WORK
15. INSURANCE
16. INDEMNIFICATION
17. CLEANUP AND PROTECTIONS
18. ASSIGNMENT
19. PERMITS, LICENSES AND TAXES
20. TERMINATION FOR DEFAULT
21. TERMINATION FOR CONVENIENCE AND RIGHT OF SUSPENSION
22. COMPLETION
23. WARRANTY
24. TESTS AND INSPECTIONS
25. DEFECTIVE WORK
26. SUPERVISION AND CONTRACTOR'S REPRESENTATIVE
27. PROTECTION OF WORK
28. EMERGENCIES
29. USE OF PREMISES
30. SAFETY
31. PROJECT MEETINGS
32. MATERIAL SAFETY DATA SHEET
33. AUDITING RIGHTS
34. COMPLIANCE WITH LAWS
35. SUBCONTRACTS
36. MARKET ANALYSIS AND SOLICITATION OF BIDS
37. SECURING AGREEMENT
38. PUBLIC ENTITY CRIMES
39. EQUAL EMPLOYMENT OPPORTUNITY/NON-DISCRIMINATION/SBE PROGRAM ... 39
40. CHANGED CONDITIONS
41. EMPLOYMENT OF SCHOOL-AGE WORKERS
A-2
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
1. INTENT OF CONTRACT DOCUMENTS
1.1 It is the intent of the Contract Documents to describe a functionally complete project
(or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for in the Contract
Documents. If the Contract Documents include words or terms that have a generally accepted technical or industry meaning, then such words or terms shall be interpreted to have such standard meaning unless otherwise expressly noted in the Contract Documents. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, law or regulation in affect at the time the Work is performed, except as may be otherwise specifically stated herein. Provided, however, in the event the standard specification, manual, code, law or regulation is changed after the GMP
Amendment has been executed by the parties, Construction Contractor shall be entitled to a Change
Order equitably adjusting the Contract Amount and/or Contract Time to the extent such change materially impacts the Contract Time and/or Contract Amount.
1.2 If during the performance of the Work Construction Contractor discovers a conflict, error or discrepancy in the Contract Documents, Construction Contractor immediately shall report same to Design Professional in writing, and before proceeding with the Work affected thereby, shall obtain a written interpretation or clarification from Design Professional. Prior to commencing each portion of the
Work, Construction Contractor shall first take all necessary field measurements and verify the applicable field conditions. After taking such measurements and verifying such conditions, Construction Contractor shall carefully compare such measurements and conditions with the requirements of the Contract
Documents, taking into consideration all other relevant information known to Construction Contractor, for the purpose of identifying and bringing to Owner's attention all conflicts or discrepancies with the
Contract Documents.
1.3 Drawings are intended to show general arrangements, design and extent of Work and are not intended to serve as shop drawings. Specifications are separated into divisions for convenience of reference only and shall not be interpreted as establishing divisions for the Work, trades, subcontracts or extent of any part of the Work. In the event of a discrepancy between or among the drawings, specifications or other Contract Document provisions, Construction Contractor shall be required to comply with the provision which is the more restrictive or stringent requirement upon Construction
Contractor, as determined by Owner. Unless otherwise specifically mentioned, all anchors, bolts, screws, fittings, fillers, hardware, accessories, trim and other parts required in connection with any portion of the Work to make a complete, serviceable, finished and first quality installation shall be furnished and installed as part of the Work, whether or not called for by the Contract Documents.
2. INVESTIGATION AND UTILITIES
2.1 Construction Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work and the general and local conditions, and particularly, but without limitation, with respect to the following: those affecting transportation, access, legal disposal, handling and storage of materials; availability and quality of labor; water and electric power;
A-3
HCPS CM Agreement (continuing services edition 08-03-2023)
INITIALS
availability and condition of roads; work area; living facilities; climatic conditions and seasons; physical conditions at the work-site and the Project area as a whole; topography and ground surface conditions;
nature and quantity of the surface materials to be encountered; subsurface conditions; equipment and facilities needed preliminary to and during performance of the Work; and all other costs associated with such performance. The failure of Construction Contractor to acquaint itself with any applicable conditions shall not relieve Construction Contractor from any of its responsibilities to perform under the
Contract Documents, nor shall it be considered the basis for any claim for additional time or compensation.
2.2 Construction Contractor shall locate all existing roadways, railways, drainage facilities and utility services above, upon, or under the Project site, said roadways, railways, drainage facilities and utilities being referred to in this Section 2 as the "Utilities". Construction Contractor shall contact the owners of all Utilities to determine the necessity for relocating or temporarily interrupting any Utilities during the construction of the Project. Construction Contractor shall schedule and coordinate its Work around any such relocation or temporary service interruption. Construction
Contractor shall be responsible for properly shoring, supporting and protecting all Utilities at all times during the course of the Work.
2.3 If during the performance of the Work, Construction Contractor or any subcontractor, sub-subcontractor, agent, employee or anyone else for whom Construction Contractor is legally liable, causes a disruption to any Utilities service to other facilities or customers within the
Project area, Construction Contractor shall take all actions necessary and required to immediately restore such Utilities service. If Construction Contractor fails to take such immediate actions Owner shall have the right to take whatever actions it deems necessary and required to immediately restore the disrupted services, and all costs incurred by Owner as a result thereof shall be reimbursed to Owner by
Construction Contractor within five (5) business days of written demand for same from Owner.
3. SCHEDULE.
3.1 Owner shall provide and maintain an overall milestone schedule for the Project which not only includes the Pre-Construction Phase and Construction Phase Services to be provided by
Construction Contractor hereunder, but also shall include Design Professional's performance schedules
(Master Project…