The file's text, extracted by GovTribe without its formatting.
Finish Hardware Schedule Inpatient Mental Health Corrections 11/12/2020 7:10 Job Number: 21817JR Hardware Set#: 5
STATEMENT OF WORK FOR
CONSTRUCTION SERVICES
PROJECT TITLE: Inpatient Mental Health EOC Compliance
PROJECT NO: 654-20-117
Line Item: Add Doors and Frames
VA SIERRA NEVADA HEALTH CARE SYSTEM RENO, NEVADA
Project Points of Contact
Project Engineer: Benjamin Snaza, 775-789-6682, benjamin.snaza@va.gov
Contracting Officer: Charee Harris, 775-788-5511, charee.harris@va.gov
CLIN 0002
STATEMENT OF WORK
GENERAL:
1. Provide professional construction services to remodel designated space to allow installation of new patient doors and frames and doors. The new doors shall have the existing anti-ligature removed and reinstalled. The bottom door alarm as outlined in the bid documents will remain as a part of this work.
2. The work will include all equipment and labor to provide the VA with finished spaces at project completion.
3. The contractor shall furnish all services, materials, equipment, and supervision as required in connection with this Statement of Work.
4. All work is located at 975 Kirman Ave. Reno, NV 89502.
SCOPE:
1. The general scope of work is to include all material, labor, and oversight to install a functioning complete system. The contractor shall coordinate with Rodney Allison of Door Control Services, see contact information below.
2. The general contractor shall use the services of a certified installer for Door Control Services. The contractor shall preserve the existing equipment warranty.
3. Only a certified installer of Door Control Services shall alter, remove, or reinstall items related to the anti-ligature alarm system.
4. The general contractor shall budget for the necessary number of trips for the certified installer to remove and reinstall the door alarm system.
5. The existing door frames and doors on the following rooms will be removed and replaced: 127, 131, 135, 137, 143, 146, 147, 149, 150, 192, 194, 200, 204, 206, and 208.
6. The material for the doors, frames, and hardware will be Government provided and contractor installed.
7. See the attached equipment list for included door hardware.
8. The bottom door alarms per the original bid drawings will remain, see sheet E-106A.
9. The contractor shall repair/ replace and match existing finishes where damaged.
10. The added work for the doors and frames shall be integrated into the construction phasing plan as shown on GI302.
ADMINISTRATIVE
1. Proposal. The Contractor shall thoroughly review the scope. The proposal shall be prepared to reflect all work required to provide a complete system.
ATTACHMENTS
1. Anti-Ligature Door Alarm Contact:
Rodney Allison, Director of Behavioral Health Services Door Control Services 225 VZ County Road 4500, Ben Wheeler, TX 75754
(888) 833-7857 (p) | (903) 521-7781 (m) | (903) 833-1177 (d) RAllison@DoorControlServices.com | www.doorcontrolservices.com
Job Number: 21817JR Inpatient Mental Health Corrections
11/12/2020 Door / Frame Schedule
Attachment #2: Doors and Hardware List
| LOCATION & GENERAL OPENING INFO |
| FRAME DATA |
| DOOR DATA |
| Door# |
| Location |
| Qty |
| Label |
| Opening Size/Type |
| Hand |
| Series / Type |
| Jamb Depth |
| Ga |
| Material / Finish |
| Hd |
| Anch / W Type |
| Prof |
| Elev |
| Series / Type |
| Width / Height |
| Thk |
| Material / Finish |
| Ga |
| Core / Door Design |
| Elev |
| Ucut |
| Hdwe Set |
| Door Edge |
| 127 |
| Corridor B6C02 from Intake B6127 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 131 |
| Corridor B6C03 from Two Bed B6131 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 135 |
| Corridor B6C03 from One Bed B6135 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 137 |
| Corridor B6C03 from One Bed B6137 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 143 |
| Corridor B6C03 from Group Therapy B6143 |
| 1 |
3-0 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F2 |
| PC5 F |
| 3-0 X 7-0 |
| 1 3/4 |
| PS Red Oak Prefinished |
| 146 |
| Corridor B6C04 from Quiet B6146 |
| 1 |
3-0 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F2 |
| PC5 F |
| 3-0 X 7-0 |
| 1 3/4 |
| PS Red Oak Prefinished |
| 147 |
| Corridor B6C04 from One Bed B6147 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 149 |
| Corridor B6C04 from One Bed B6149 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 150 |
| Corridor B6C04 from One Bed B6150 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 192 |
| Corridor B6C05 from Two Bed B6192 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 194 |
| Corridor B6C05 from Two Bed BC194 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 200 |
| Corridor B6C04 from Two Bed B6200 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 204 |
| Corridor B6C04 from Two Bed B6204 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 206 |
| Corridor B6C04 from Two Bed BC206 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
| 208 |
| Corridor B6C04 from Procedure Exam B6208 |
| 1 |
3-10 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F3 |
| PC5 F |
| 3-10 X |
7-0
| 1 3/4 |
| PS Red Oak Prefinished |
Job Number: 21817JR Inpatient Mental Health Corrections
11/12/2020 Door / Frame Schedule
| LOCATION & GENERAL OPENING INFO |
| FRAME DATA |
| DOOR DATA |
| Door# |
| Location |
| Qty |
| Label |
| Opening Size/Type |
| Hand |
| Series / Type |
| Jamb Depth |
| Ga |
| Material / Finish |
| Hd |
| Anch / W Type |
| Prof |
| Elev |
| Series / Type |
| Width / Height |
| Thk |
| Material / Finish |
| Ga |
| Core / Door Design |
| Elev |
| Ucut |
| Hdwe Set |
| Door Edge |
| B6CD01 |
| Corridor B6C01 from Sally Port B6C02A |
| 1 |
| 90 Min |
| 4-0 X 7-0 |
Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F1 |
| L18 NL |
| 4-0 X 7-0 |
| 1 3/4 |
| CRS |
Primed
| 18 |
| Honeycomb NL |
| HM-A |
| 3/4 |
| 1 |
| L |
Sally Port B6C02A
4-0 X 7-0 Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F1 |
| PC5 HG |
| 4-0 X 7-0 |
| 1 3/4 |
| PS Red Oak Prefinished |
Copy Room B6124
Interior
Full Weld
Primed
| 2" |
| USA |
| MDR |
| HM-F2 |
| PC5 F |
| 3-0 X 7-0 |
| 1 3/4 |
| PS Red Oak Prefinished |
Total Door Count: 18 Total Frame / Window Count: 18
Door Edge Codes L - Lockseam (Hollow Metal)
Profiles MDR - Masonry Double Rabbet
Anchors USA - Universal Stud Anchor
| Key Set |
| Qty Units |
| Door# |
| Door Location |
| Hand |
| Label |
| Deg |
| 1 Single |
| B6CD01 |
| Corridor B6C01 From Sally Port B6C02A |
| LHR |
| 90 Min |
1 Single Size: 4-0 X 7-0 X 1 3/4 CRS Door X CRS Frame
| Tot Qty |
| Qty |
| UOM |
| Manf |
| Item Type |
| Item Series/Description |
| Finish |
| 1 |
| 1 |
| EA |
| PEM |
| Hinge - Continuous |
| FM3500 AMS CTP |
| 630 |
| 1 |
| 1 |
| EA |
| SAR |
| Mortise Lock - Electric |
| 8273 BHW MK |
| US32D |
| 1 |
| 1 |
| EA |
| RIX |
| Closer |
| 91N 90N Torx |
| 689 |
| 1 |
| 1 |
| EA |
| ROC |
| Kick Plate |
| K1050 x 4BE x 10" x 46" |
| US32D |
| 1 |
| 1 |
| EA |
| ROC |
| Floor Stop |
| 471 |
| US26D |
| 1 |
| 1 |
| EA |
| SEC |
| Door Position Switch |
| DPS-M-BK |
| Black |
| 1 |
| 1 |
| EA |
| PEM |
| Gasketing |
| S44BL20 |
| BL |
| 1 |
| 1 |
| EA |
| MCK |
| Power Transfer Unit |
| QC-C1500 Frame harness |
| N/A |
| 1 |
| 1 |
| EA |
| MCK |
| Power Transfer Unit |
| QC-C300 Door Harness |
| N/A |
| 1 |
| 1 |
| EA |
| MCK |
| Power Transfer Unit |
| QC-C306 Door Harness |
| N/A |
| 1 |
| 1 |
| EA |
| PEM |
| Power Transfer Unit |
| EL-CEPT |
| US26D |
| 1 |
| 1 |
| EA |
| SEC |
| Power Supply |
| EPS-05 |
| Gray |
Hardware Set#: 2
| Key Set |
| Qty Units |
| Door# |
| Door Location |
| Hand |
| Label |
| Deg |
| 1 Single |
| B6CD02 |
| Corridor B6C02 To Sally Port B6C02A |
| RH |
1 Single Size: 4-0 X 7-0 X 1 3/4 PS Red Oak Door X CRS Frame
| Tot Qty |
| Qty |
| UOM |
| Manf |
| Item Type |
| Item Series/Description |
| Finish |
| 1 |
| 1 |
| EA |
| PEM |
| Hinge - Continuous |
| FM3500 AMS CTP |
| 630 |
| 1 |
| 1 |
| EA |
| SAR |
| Mortise Lock - Electric |
| 8273 BHW MK |
| US32D |
| 1 |
| 1 |
| EA |
| RIX |
| Closer |
| 91N 90N Torx |
| 689 |
| 1 |
| 1 |
| EA |
| ROC |
| Kick Plate |
| K1050 x 10" x 46" |
| US32D |
| 1 |
| 1 |
| EA |
| ROC |
| Floor Stop |
| 471 |
| US26D |
| 1 |
| 1 |
| EA |
| SEC |
| Door Position Switch |
| DPS-M-BK |
| Black |
| 1 |
| 1 |
| EA |
| MCK |
| Power Transfer Unit |
| QC-C1500 Frame harness |
| N/A |
| 1 |
| 1 |
| EA |
| MCK |
| Power Transfer Unit |
| QC-C300 Door Harness |
| N/A |
| 1 |
| 1 |
| EA |
| MCK |
| Power Transfer Unit |
| QC-C306 Door Harness |
| N/A |
| 1 |
| 1 |
| EA |
| PEM |
| Power Transfer Unit |
| EL-CEPT |
| US26D |
| 1 |
| 1 |
| EA |
| SEC |
| Power Supply |
| EPS-05 |
| Gray |
| 3 |
| 3 |
| EA |
| ROC |
| Silencer |
| 608 |
| GRAY |
11/12/2020 7:10 Job Number: 21817JR Hardware Set#: 1
| Key Set |
| Qty Units |
| Door# |
| Door Location |
| Hand |
| Label |
| Deg |
| 1 Single |
| B6D124 |
| Corridor B6C02 To Copy Room B6124 |
| LH |
| 45 Min |
1 Single Size: 3-0 X 7-0 X 1 3/4 PS Red Oak Door X CRS Frame
| Tot Qty |
| Qty |
| UOM |
| Manf |
| Item Type |
| Item Series/Description |
| Finish |
| 1 |
| 1 |
| EA |
| PEM |
| Hinge - Continuous |
| FM3500 |
| 630 |
| 1 |
| 1 |
| EA |
| SAR |
| Mortise Lockset |
| 8204 Storeroom |
| 626 |
| 1 |
| 1 |
| EA |
| RIX |
| Closer |
| 91N 90N Torx |
| 689 |
| 1 |
| 1 |
| EA |
| ROC |
| Kick Plate |
| K1050 x 4BE x 10" x 34" |
| US32D |
| 1 |
| 1 |
| EA |
| ROC |
| Floor Stop |
| 471 |
| US26D |
| 3 |
| 3 |
| EA |
| ROC |
| Silencer |
| 608 |
| GRAY |
Hardware Set#: 4
| Key Set |
| Qty Units |
| Door# |
| Door Location |
| Hand |
| Label |
| Deg |
| 1 Single |
| 127 |
| Corridor B6C02 From Intake B6127 |
| LHR |
| 1 Single |
| 131 |
| Corridor B6C03 From Two Bed B6131 |
| LHR |
| 1 Single |
| 135 |
| Corridor B6C03 From One Bed B6135 |
| RHR |
| 1 Single |
| 137 |
| Corridor B6C03 From One Bed B6137 |
| RHR |
| 1 Single |
| 147 |
| Corridor B6C04 From One Bed B6147 |
| RHR |
| 1 Single |
| 149 |
| Corridor B6C04 From One Bed B6149 |
| LHR |
| 1 Single |
| 150 |
| Corridor B6C04 From One Bed B6150 |
| RHR |
7 Single Size: 3-10 X 7-0 X 1 3/4 PS Red Oak Door X CRS Frame
| Tot Qty |
| Qty |
| UOM |
| Manf |
| Item Type |
| Item Series/Description |
| Finish |
| 7 |
| 1 |
| EA |
| PEM |
| Hinge - Continuous |
| FM3500 AMS |
| 630 |
| 7 |
| 1 |
| EA |
| SAR |
| Mortise Lockset |
| 8225 BHW MK |
| 626 |
| 7 |
| 1 |
| EA |
| ROC |
| Armor Plate |
| K1050 x 4BE x 10" x 44" |
| US32D |
| 7 |
| 1 |
| EA |
| ROC |
| Wall Bumper |
| 412 |
| US26D |
| 7 |
| 1 |
| EA |
| MCK |
| Power Transfer Unit |
| QC-C300 Door Harness |
| N/A |
| 21 |
| 3 |
| EA |
| ROC |
| Silencer |
| 608 |
| GRAY |
11/12/2020 7:10 Job Number: 21817JR Hardware Set#: 3
| Key Set |
| Qty |
| Units |
| Door# |
| Door Location |
| Hand |
| Label |
| Deg |
| 1 |
| Single |
| 143 |
| Corridor B6C03 From Group Therapy B6143 |
| LHR |
| 1 |
| Single |
| 146 |
| Corridor B6C04 From Quiet B6146 |
| LHR |
2 Single Size: 3-0 X 7-0 X 1 3/4 PS Red Oak Door X CRS Frame
| 1 |
| Single |
| 192 |
| Corridor B6C05 From Two Bed B6192 |
| LHR |
| 1 |
| Single |
| 194 |
| Corridor B6C05 From Two Bed BC194 |
| RHR |
| 1 |
| Single |
| 200 |
| Corridor B6C04 From Two Bed B6200 |
| RHR |
| 1 |
| Single |
| 204 |
| Corridor B6C04 From Two Bed B6204 |
| RHR |
| 1 |
| Single |
| 206 |
| Corridor B6C04 From Two Bed BC206 |
| LHR |
| 1 |
| Single |
| 208 |
| Corridor B6C04 From Procedure Exam B6208 |
| RHR |
6 Single Size: 3-10 X 7-0 X 1 3/4 PS Red Oak Door X CRS Frame
| Tot Qty |
| Qty |
| UOM |
| Manf |
| Item Type |
| Item Series/Description |
| Finish |
| 8 |
| 1 |
| EA |
| PEM |
| Hinge - Continuous |
| FM3500 AMS |
| 630 |
| 8 |
| 1 |
| EA |
| ROC |
| Mortise Lockset |
| 8227 BHW MK |
| 626 |
| 8 |
| 1 |
| EA |
| ROC |
| Armor Plate |
| K1050 x 4BE x 10" x 44" |
| US32D |
| 8 |
| 1 |
| EA |
| ROC |
| Wall Bumper |
| 412 |
| US26D |
| 8 |
| 1 |
| EA |
| MCK |
| Power Transfer Unit |
| QC-C300 Door Harness |
| N/A |
| 24 |
| 3 |
| EA |
| ROC |
| Silencer |
| 608 |
| GRAY |
K1050 10" x 34" kickplate for openings 143 and 146