654-20-117 Mental Health EOC_Part4.pdf

PDF 10 MB Posted

Attached to
Y1DA--Mental Health EOC Compliance Federal contract opportunity
Solicitation number
36C26121R0072
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

This solicitation is for compliance with mental health emergency operations center and inpatient door frame requirements. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is seeking proposals for Project 654-20-141 Inpatient Mental Health EOC Compliance and 654-17-713 Inpatient Mental Health Door frames and doors. The solicitation number is 36C26121R0072 and is titled "Y1DA--Mental Health EOC Compliance." The opportunity type is a solicitation. The description provided indicates the project involves compliance with an inpatient mental health emergency operations center as well as inpatient door frames and doors. No other details are included regarding response dates, pricing terms, set asides, incumbents or other salient information.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

7.6

G

2 2 2

2 2

1 1 1

SUN DECK

B6188

TELE

B6184C

DINING

5C133A

CORRIDOR

B6C02

F

7.6

G

4 4 4

4 4

3 3 3

SUN DECK

B6188

TELE

B6184C

DINING

5C133A

CORRIDOR

B6C02

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NA 89502

MAT PERKINS

520-481-8548

/12

/20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h E

O C

C o m p lia n c e R e n o v a ti o n s /6

-2

-1

.1

.M

E P

F .r v t

/1

/2

:2

:0

P

M

FX106

FIRE PROTECTION PLAN - LEVEL 6 - DEMOLITION

AND NEW

654-20-117

02/12/2021 M. PERKINS G. WEAVER

BID DOCUMENT

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

FIRE SPRINKLER NOTES

CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO COMMENCEMENT

OF WORK FOR REVIEW AND APPROVAL:

A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,

LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS AND

DETAILS

B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS, SPRINKLER

HEADS, HANGERS AND SUPPORT ATTACHMENTS .

C. HYDRAULIC CALCULATIONS FOR THE MODIFIED CONFIGURATION.

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION WHERE FEASIBLE.

ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR

REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED WITH THE COR 30 DAYS

IN ADVANCE AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS PRIOR TO INTERRUPTION.

C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO THE START OF WORK.

D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING HEIGHTS, AND

SQUARE FOOTAGE.

E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND OTHER TRADES PRIOR TO

CONSTRUCTION.

F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED CHASES UNLESS

NOTED OTHERWISE.

G. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED OTHERWISE ON PLAN.

H. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2019 NFPA 13.

I. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL LISTED FOR USE IN FIRE

PROTECTION SYSTEMS.

J. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH EXISTING BUILDING

STANDARDS.

K. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE SPECIFICALLY

PROHIBITED AS DEFINED BY NFPA 13.

L. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

M. ALL WELDING TO BE DONE IN SHOP BY CERTIFIED WELDERS.

N. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO COMPLETE THIS

PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN TO MATCH EXISTING

CONDITIONS AND FINISHES.

O. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

P. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED WALLS AND

ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY

MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.

Q. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

R. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL VALVES. ACCESS

PANELS SHALL BE INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. ACCESS PANEL RATING

SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING.

S. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE

EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES,

REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE.

WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE

DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE

INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY

PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.

PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE

PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE

PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.

SCALE: 1/4" = 1'-0"

D6

FIRE PROTECTION REFLECTED

CEILING PLAN - LEVEL 6 -

DEMOLITION

SCALE: 1/4" = 1'-0"

F6

FIRE PROTECTION REFLECTED

CEILING PLAN - LEVEL 6 - NEW

1. REMOVE EXISTING PENDENT FIRE SPRINKLER HEAD.

2. REMOVE EXISTING SIDEWALL FIRE SPRINKLER HEAD.

3. INSTALL NEW INSTITUTIONAL STYLE PENDENT SPRINKLER HEAD, SEE SPRINKLER HEAD LEGEND FOR

ADDITIONAL INFORMATION.

4. INSTALL NEW INSTITUTIONAL STYLE SIDEWALL SPRINKLER HEAD, SEE SPRINKLER HEAD LEGEND FOR

ADDITIONAL INFORMATION.

SYM. TYPE ORIFICE TEMP "K" DEMO QUANTITY

PENDANT

MAKE & MODEL

TYCO TY3281 1/2" 165F 5.6

NEW QUANTITY

HEADS ADDED/REMOVED

FROM SYSTEM

QUICK RESPONSE

YES

SIDEWALL YESTYCO TY3381 1/2" 165F 5.6

3 3 -

SPRINKLER HEAD LEGEND

6 6 -

BASIS OF DESIGN:

Revisions: Date:

DN DOWN

WC WATER CLOSET

FLUSH VALVEFV

YH YARD HYDRANT

TD TRENCH DRAIN

FOV

FOR

FOS

FUEL OIL VENT

FUEL OIL RETURN

FUEL OIL SUPPLY

ES

EEW

EMERGENCY SHOWER

EMERGENCY EYEWASH

CWV COMBINATION WASTE AND VENT

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ACID NEUTRALIZING TANK

ACID RESISTANT VENT THROUGH ROOF

BALANCING COCK

BOTTOM OF PIPE

BRITISH THERMAL UNIT

BTU PER HOUR

CLOTHES WASHER BOX

CUBIC FEET PER HOUR

CLEANOUT

CLEANOUT TO GRADE

CIRCULATION PUMP

DOUBLE CLEANOUT

DRINKING FOUNTAIN

ELEVATION

ELECTRIC WATER HEATER

ELECTRIC WATER COOLER

DEGREES FAHRENHEIT

FLOOR CLEANOUT

FINISHED FLOOR ELEVATION

FEET

GUTTER DRAIN

GREASE INTERCEPTOR

GALLONS PER HOUR

GALLONS PER MINUTE

GAS WATER HEATER

HORSEPOWER

HEAD

INCHES

INVERT

KILOWATT

1,000 BTUH

MIXING VALVE

NOT APPLICABLE

NOT IN CONTRACT

NUMBER

NORMALLY CLOSED

NORMALLY OPEN

OUTSIDE SCREW AND YOKE

PHASE

POUNDS PER SQUARE INCH GAUGE

STATIC PRESSURE

TYPICAL

YARD BOX

WALL CLEANOUT

AFF

AFG

ANT

AVTR

B.C.

BOP

BTU

BTUH

CWB

CFH

CO

COTG

CP

DCO

DF

EL

EWH

EWC

°F

FCO

FFE

FT

GD

GI

GPH

GPM

GWH

HP

HD

IN

INV

kW MBh

MV

NA

NIC

No. #

N.C.

N.O.

OS&Y

Ph

PSIG

SP

TYP

YB

WCO

DOUBLE CLEANOUT TO GRADEDCOTG

ESEW EMERGENCY SHOWER EYE WASH

POWERS OF HARDNESS

PH

HOSE BIBBHB

DS DOWNSPOUT

DSN DOWNSPOUT NOZZLE

PLUMBING SYMBOL LEGEND

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT

ABBREVIATIONS

A

PENETRATION

TEST PLUG (PRESS/TEMP)

(WH) (HB)

RD/OD/DD

DCOTG

FCO/COTG

FS/FD/AD

VTR

ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN

TWO WAY OR DOUBLE CLEANOUT TO GRADE

FLOOR CLEANOUT/CLEANOUT TO GRADE

FLOOR SINK , FLOOR DRAIN , AREA DRAIN

WATER HAMMER ARREST0R

FITTING (PETE'S PLUG)

POINT OF CONNECTION TO EXISTING

AQUASTAT

PRESSURE GAUGE AND GAUGE COCK

THERMOMETER

STRAINER WITH BLOWDOWN VALVE & HOSE BIBB

NEW PIPE CONNECTION TO EXISTING PIPING

EXISTING PIPE TO BE REMOVED

EXISTING PIPING TO REMAIN

NEW PIPING

FLEXIBLE CONNECTION

UNIVERSAL TEMPERATURE-PRESSURE

ORIFICE UNION

FLANGED UNION

UNION

RISE IN PIPE

DROP IN PIPE

CAPPED OUTLET

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

ECCENTRIC REDUCER

REDUCER OR INCREASER

PIPE GUIDE

DIRECTION OF FLOW

X X X X X

MAV MANUAL AIR VENT (MAV)

AAV AUTOMATIC AIR VENT (AAV)

TRAP PRIMER WITH ACCESS PANELTP

SLOPE OF PIPE

VENT THROUGH ROOF

AG AIR GAP FITTING

WALL HYDRANT, HOSE BIBB

KEYED NOTE

OR

SCHEMATIC SYMBOLS

ABBREVIATIONSYMBOL DESCRIPTION

XX

255' OF 6" @ 0.15%SLOPE

SLOPE AND LINEAL FOOTAGE

F.D.C.FIRE DEPARTMENT INLET CONNECTION F.D.C.

SAS SASSANITARY MANHOLE

M.H. M.H.(E)

GM

WM

REDUCED PRESSURE BACKFLOW PREVENTER

STORM DRAIN

IRRIGATION

F.H.(E)F.H.

LP

PP

C.O.(E)C.O.

LIGHT POLE

FENCING

POWER POLE

CLEANOUT

THRUST BLOCK

CONSTRUCTION

FIRE HYDRANT

VALVE WITH VALVE BOX

NATURAL GAS

FIRE PROTECTION

COLD WATER SUPPLY

SANITARY SEWER

SASSAS

WATER METER

NATURAL GAS METER

GATE VALVE

VALVE IN RISER

WM

GM

LP

PP

POST INDICATOR VALVE

PIV

PIV

W

F

SD

G

IRR

S EX. S

EX. W

EX. F

EX. G

EX. SD

EX. IRR

EXISTINGNEWDESCRIPTION

SITE UTILITY SYMBOLS

CARBON DIOXIDECO2

H

HE

AC

AR

CDA

LOX

LN

DV

DA

WAGD

IA

MV

O

NO

N

MA

DENTAL VACUUM

WASTE ANESTHESIA GAS DISPOSAL

INSTRUMENT AIR

DENTAL AIR

EXISTING PIPING

LIQUID NITROGEN

LIQUID OXYGEN

HYDROGEN

HELIUM

ACETYLENE

ARGON

COMPRESSED DRY AIR

ALARM PANEL (IN WALL)

MEDICAL VALVE BOX

MEDICAL GAS DROP

MEDICAL VACUUM

OXYGEN

NITROUS OXIDE

NITROGEN

MEDICAL AIR

O OXYGEN

CDA

CO2

AR

AC

HE

H

LN

LOX

MA

N

NO

O

MV

IA

WAGD

DA

DV

O

SYMBOL ABBREVIATION DESCRIPTION

DESCRIPTIONABBREVIATIONSYMBOL

PROCESS GASES

MEDICAL GAS SYMBOLS

S

VACUUM BREAKER

ATMOSPHERIC VACUUM BREAKER

PRESSURE STYLE

FLOW SWITCH

SOLENOID VALVE

FUEL GAS PRESSURE REGULATOR

DIAPHRAGM (PROCESS SYSTEMS)

OS&Y VALVE

GATE VALVE

GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

CHECK VALVE

PLUG VALVE

WATER PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

TEMPERATURE AND PRESSURE RELIEF VALVE

2-WAY CONTROL VALVE

3-WAY MODULATING CONTROL VALVE

VALVE IN VERTICAL

REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)

DRAIN VALVE

BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE

OR OR

OR

OR

DESCRIPTIONSYMBOL

VALVE SYMBOLS

P##

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

ELEVATION LETTER

LETTER REFER TO EQUIPMENT TYPE

NUMBER REFERS TO SPECIFIC EQUIPMENT

SYMBOL INDICATES FIXTURE/EQUIPMENT

IDENTIFIED IN EQUIPMENT SCHEDULE

SECTION SYMBOL

DETAIL SYMBOL

SECTION, ELEVATION, AND DETAIL TITLES

FIXTURE & EQUIPMENT SYMBOL

P-100

A

P-500

P-200

A

P-500

P-300

A

SCALE

ELEVATION

SCALE

DETAIL

SCALE

SECTION

IRR

INDIRECT WASTEIW

TW

TWR

SAN

V

DHWR

DCW

DHW

LA

IA

INW

IHWR

IHW

ICW

PD

SCW

IRR

NGH

NGM

G

LPG

ORD

RD

DIR

DIS

NPW

MU

ROR

ROS

CD

CA

AW

AV

PUMPED DISCHARGE LINE

IRRIGATION

SOFT COLD WATER

TEMPERED WATER (TEMP °F)

TEMPERED WATER RETURN (TEMP °F)

NATURAL GAS-HIGH PRESSURE

NATURAL GAS-MEDIUM PRESSURE

LAB COMPRESSED AIR

INSTRUMENT COMPRESSED AIR

INDUSTRIAL WASTE

REVERSE OSMOSIS RETURN

INDUSTRIAL HOT WATER RETURN

INDUSTRIAL HOT WATER

INDUSTRIAL COLD WATER

NATURAL GAS-LOW PRESSURE

LIQUIFIED PETROLEUM GAS

OVERFLOW ROOF DRAIN

STORM/ROOF DRAIN

SANITARY SEWER

DEIONIZED WATER RETURN

DEIONIZED WATER SUPPLY

VENT

NON-POTABLE WATER

MAKE-UP WATER

REVERSE OSMOSIS SUPPLY

140° DOMESTIC HOT WATER

140° DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER

DOMESTIC COLD WATER

CONDENSATE DRAIN

COMPRESSED AIR

ACID WASTE

ACID VENT

SHW SOFT HOT WATER

SAN

AV

AW

CA

CD

ROS

ROR

NPW

V

DIS

DIR

RD

ORD

LPG

G

NGM

NGH

SCW

PD

INW

IA

IW

LA

SHW

GW GREASE WASTEGW

GV GREASE VENT

ABBREVIATIONSYMBOL DESCRIPTION

PIPING SYMBOLS

ICW

IHW

IHWR

TWR (_ _ _)

TW (_ _ _)

GV

DCW

DHW

DHWR

DHW 140ºF

DHWR 140ºF

MU

DHW 140ºF

DHWR 140ºF

POINT OF DISCONNECT TO EXISTING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NA 89502

MAT PERKINS

520-481-8548

/12

/20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h E

O C

C o m p lia n c e R e n o v a ti o n s /6

-2

-1

.1

.M

E P

F .r v t

/1

/2

:2

:5

P

M

P-000

PLUMBING/FP ABBREVIATIONS

/SYMBOLS/GENERAL NOTES

654-20-117

02/12/2021 M. PERKINS G. WEAVER

BID DOCUMENT

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

7.6

9.4

G

4" V

3/4" HW

1 1/2" CW

4" SAN

2" V

1" HW

2" CW

1 1/4" HW

2 1/2" CW 1 1/4" HW

2 1/2" CW

3/4" HW

3/4" CW

2" V

4" SAN

4 4

1 1/2" V

2" V

3" V

3" SAN

4" SAN

3/4" HW

3/4" CW

2 1/2" CW

3/4" HWR

1 1/2" CW

3/4" HW

1 1/2" CW

3/4" HWR

2 1/2" CW

1 1/2" HW

2" CW

3/4" HWR

1 1/2" HW

1 1/4" D

2" CW

1 1/2" HW

1 1/2" CW

3/4" HW

4" SAN

2" V

2" V

4" V

4" V 4" V

4" V

4" V

4" SAN

4" SAN

4" SAN

4" V

3/4" HWR

1 1/2" HW

3/4" HWR

2 1/2" CW

2 1/2" CW

1 1/4" HW

3/4" HW

2" CW

1 1/2" CW

3/4" HW

3/4" CW

3/4" HW

3" SAN

3/4" CW

3/4" HW

4" V

4" SAN

4" SAN

4" V

2" V

4" V

4" V

1 1/2" V 4" V

4" V

2" V

3/4" HW

1 1/2" CW

1 1/2" CW

3/4" HW

3/4" CW

3/4" HWR

2" HW

3" CW

1 1/2" CW

3/4" HW

1 1/2" CW

3/4" HW

1 1/2" CW

3/4" HW

3/4" CW

3/4" CW

3/4" HW

3" CW

2" HW

3/4" HWR

F

7.6

9.4

G

RECIEVING

B6127

BATH

B6131A

BATH

B6127A

TWO BED

B6131

ONE BED

B6135

HAC

B6133

BATH

B6137A

BATH

B6135A

BATH

B6192A

BATH

B6194A

TWO BED

B6192

SUN DECK

B6188

SECLUSION

B6134A

ANTE RM

B6134

TOILET

B6134B

TOILET

B6193B

SECLUSION

B6193A ANTE RM

B6193

NURSE STATION

B6128

MEDICATION

B6128A

WORK RM HOUSE

STAFF

B6104

STAFF TOILET

B6125

COPY

B6124

HAC

B6184A

DAY RM

RECREATION

B6184

NON-FOOD STRG

5C139

TOILET

5C138

TOILET

5C137

PSYCHIATRIST

OFFICE

5C144

HEAD NURSE

5C143

TELE

B6184C

ADL KITCHEN

5C133C

CORRIDOR

B6C06

ELEVATOR

LOBBY

B6EGD

CORRIDOR

B6C01

PSYCHIATRIST

OFFICE

5C146

NURSE CLINICIAN

PHYSICIAN

ASSISTANT

5C142

CORRIDOR

5C-C9

HYDRO TANK

5C140

TRAY CART

STORAGE

5C133B

DINING

5C133A

BMS

5C159

CORRIDOR

B6C05

CORRIDOR

B6C02

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NA 89502

MAT PERKINS

520-481-8548

/12 /20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h E

O C

C o m p lia n c e R e n o v a ti o n s /6

-2

-1

.1

.M

E P

F .r v t

/2

/2

:4

:5

P

M

PD106A

PLUMBING PLAN - LEVEL 6 - AREA A -

DEMOLITION

654-20-117

02/12/2021 M. PERKINS G. WEAVER

BID DOCUMENT

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

SCALE: 1/4" = 1'-0"

F5

PLUMBING PLAN - LEVEL 6 - AREA A -

DEMOLITION

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION WHERE FEASIBLE.

ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR

REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED WITH THE COR 30 DAYS

IN ADVANCE AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS PRIOR TO INTERRUPTION.

C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO THE START OF WORK.

D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING HEIGHTS, AND

SQUARE FOOTAGE.

E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND OTHER TRADES PRIOR TO

CONSTRUCTION.

F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED CHASES UNLESS

NOTED OTHERWISE.

G. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED OTHERWISE ON PLAN.

H. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2019 NFPA 13.

I. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL LISTED FOR USE IN FIRE

PROTECTION SYSTEMS.

J. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH EXISTING BUILDING

STANDARDS.

K. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE SPECIFICALLY

PROHIBITED AS DEFINED BY NFPA 13.

L. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

M. ALL WELDING TO BE DONE IN SHOP BY CERTIFIED WELDERS.

N. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO COMPLETE THIS

PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN TO MATCH EXISTING

CONDITIONS AND FINISHES.

O. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

P. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED WALLS AND

ASSEMBLIES INDICATED ON PLANS IN WORK AREA. ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.

APPROVED FIRE PROOF CAULKING MATERIAL.

Q. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

R. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL VALVES. ACCESS

PANELS SHALL BE INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING AND SHALL BE VANDAL-PROOF ANDKEYED TO MATCH EXISTING ACCESS PANELS IN THE AREA. COR TO VERIFY PREFERRED KEY TO

BE USED FOR ANY NEW PANELS.

S. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE

EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES,

REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES REFLECT THE ACTUAL SPACE AVAILABLE. WHERE

SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE

DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE

INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY

PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.

PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE

PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE

PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.

T. COMPLETE COORDINATION/LAYOUT DRAWINGS SHALL BE REQUIRED BY SPECIFICATIONS AND

SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

1. REMOVE EXISTING WALL MOUNTED WATER CLOSET, RETAIN EXISTING ROUGH IN FOR NEW FIXTURE.

2. REMOVE EXISTING COUNTER MOUNTED SINK, RETAIN EXISTING ROUGH IN FOR NEW FIXTURE.

3. DEMOLISH EXISTING BUILT UP SHOWER, FLOOR DRAIN, AND REMOVE EXISTING WALL MOUNTED

SHOWER FAUCET. RETAIN EXISTING ROUGH IN WHERE POSSIBLE FOR NEW FIXTURE, REROUTE

EXISTING WASTE PIPING UNDER FLOOR BELOW.

4. EXISTING PLUMBING FIXTURE TO REMAIN.

5. USE EXISTING ZONE VALVES TO PHASE PLUMBING WORK. SEE ARCHTECTURAL PLANS FOR PHASING

INFORMATION.

Revisions: Date:

1 - IFC COORDINATION 02.22.2021

NOTE: PLUMBING SCOPE OF WORK WILL REQUIRE ACCESS

COORDINATION WITH THE FLOOR BELOW FOR UNDER-SLAB

WORK. COORDINATE WORK PLAN (INCLUDING INTERIM LIFE-

SAFETY AND INFECTION CONTROL PLANS), ACCESS, AND DOWN-

TIME WITH COR TO ENSURE MINIMAL INTERRUPTION TO ON-

GOING OPERATIONS.

7.6

9.4

H I K L

2 1

1 2

2" V

4" V

4" V 4" V

4" V

4" V

4" SAN

4" V

3/4" HWR

1 1/2" HW

3/4" HWR

2 1/2" CW

3/4" HWR

2" HW

3" CW

1 1/2" CW

1 1/2" HW

2 1/2" CW

1 1/4" HW

1 1/4" HW

2 1/2" CW

4" V

1" CW

1" HW

3/4" HW

3/4" CW

3" SAN

2" V

3/4" HW

2" CW

1 1/2" CW

3/4" HW

1 1/2" CW

3/4" HW

1 1/2" CW

3/4" HW

4" SAN

4" SAN

2" V

2" V

4" V

1 1/4" HW

2 1/2" CW

1" HW

2 1/2" CW

2 1/2" CW

1" HW

2 1/2" CW

3/4" HW

1 1/2" CW

3/4" HW

3/4" CW

3/4" HW

3" CW

2" HW

3/4" HWR

2" CW

3/4" HW

1 1/2" CW

3/4" HW

3/4" HW

1 1/2" CW

3/4" HW

3/4" CW

3/4" CW

3/4" HW

1 1/2" CW

3/4" HW

4" V

2" V 2" V

2" V

1 1/2" CW

3/4" HW 1 1/2" CW

4" V

4" V

1" HW

3/4" CW

1" HW

1 1/2" CW

1" HW

1 1/2" CW

4" V

3/4" HW

1 1/2" CW

4" SAN

DEDUCT #1

7.6

9.4

H I K L

BATH

B6137A

BATH

B6135A

ELEC EQUIP

B6139

GROUP THERAPY

B6143

ONE BED

B6147

ONE BED

B6149

BATH

B6147A

BATH

B6149A

ONE BED

B6150

BATH

B6150A

TWO BED

B6208

QUIET

B6146

TWO BED

B6206

BATH

B6206A

BATH

B6208A

WASHER DRYER

B6205

NOURISH

KITCHEN

B6203

CLEAN UTILITY

B6201

CLEAN LINEN

B6199

OFFICE

B6140

TELE

B6142

RED BAG

STORAGE

B6138

SOILED UTILITY

B6136

LOCKER ROOM

B6195

TELE EQUIP

B6197

TWO BED

B6204

TWO BED

B6200

BATH

B6200A

BATH

B6204A

STAIR 2

BS2

TWO BED

B6194

BATH

B6192A

BATH

B6194A

CORRIDOR

B6C06

ONE BED

B6137

CORRIDOR

B6C03

CORRIDOR

B6C04

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA B

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NA 89502

MAT PERKINS

520-481-8548

/12 /20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h E

O C

C o m p lia n c e R e n o v a ti o n s /6

-2

-1

.1

.M

E P

F .r v t

/2

/2

:4

:5

P

M

PD106B

PLUMBING PLAN - LEVEL 6 - AREA B -

DEMOLITION

654-20-117

02/12/2021 M. PERKINS G. WEAVER

BID DOCUMENT

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

SCALE: 1/4" = 1'-0"

F3

PLUMBING PLAN - LEVEL 6 - AREA B -

DEMOLITION

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION WHERE FEASIBLE.

ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR

REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED WITH THE COR 30 DAYS

IN ADVANCE AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS PRIOR TO INTERRUPTION.

C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO THE START OF WORK.

D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING HEIGHTS, AND

SQUARE FOOTAGE.

E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND OTHER TRADES PRIOR TO

CONSTRUCTION.

F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED CHASES UNLESS

NOTED OTHERWISE.

G. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED OTHERWISE ON PLAN.

H. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2019 NFPA 13.

I. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL LISTED FOR USE IN FIRE

PROTECTION SYSTEMS.

J. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH EXISTING BUILDING

STANDARDS.

K. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE SPECIFICALLY

PROHIBITED AS DEFINED BY NFPA 13.

L. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

M. ALL WELDING TO BE DONE IN SHOP BY CERTIFIED WELDERS.

N. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO COMPLETE THIS

PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN TO MATCH EXISTING

CONDITIONS AND FINISHES.

O. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

P. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED WALLS AND

ASSEMBLIES INDICATED ON PLANS IN WORK AREA. ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.

APPROVED FIRE PROOF CAULKING MATERIAL.

Q. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

R. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL VALVES. ACCESS

PANELS SHALL BE INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING AND SHALL BE VANDAL-PROOF ANDKEYED TO MATCH EXISTING ACCESS PANELS IN THE AREA. COR TO VERIFY PREFERRED KEY TO

BE USED FOR ANY NEW PANELS.

S. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE

EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES,

REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES REFLECT THE ACTUAL SPACE AVAILABLE. WHERE

SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE

DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE

INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY

PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.

PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE

PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE

PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.

T. COMPLETE COORDINATION/LAYOUT DRAWINGS SHALL BE REQUIRED BY SPECIFICATIONS AND

SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

1. REMOVE EXISTING WALL MOUNTED WATER CLOSET, RETAIN EXISTING ROUGH IN FOR NEW FIXTURE.

2. REMOVE EXISTING COUNTER MOUNTED SINK, RETAIN EXISTING ROUGH IN FOR NEW FIXTURE.

3. DEMOLISH EXISTING BUILT UP SHOWER, FLOOR DRAIN, AND REMOVE EXISTING WALL MOUNTED

SHOWER FAUCET. RETAIN EXISTING ROUGH IN WHERE POSSIBLE FOR NEW FIXTURE, REROUTE

EXISTING WASTE PIPING UNDER FLOOR BELOW.

4. EXISTING PLUMBING FIXTURE TO REMAIN.

5. USE EXISTING ZONE VALVES TO PHASE PLUMBING WORK. SEE ARCHTECTURAL PLANS FOR PHASING

INFORMATION.

Revisions: Date:

1 - IFC COORDINATION 02.22.2021

NOTE: PLUMBING SCOPE OF WORK WILL REQUIRE ACCESS

COORDINATION WITH THE FLOOR BELOW FOR UNDER-SLAB

WORK. COORDINATE WORK PLAN (INCLUDING INTERIM LIFE-

SAFETY AND INFECTION CONTROL PLANS), ACCESS, AND DOWN-

TIME WITH COR TO ENSURE MINIMAL INTERRUPTION TO ON-

7.6

9.4

G

BATH

B6137A

BATH

B6135A

BATH

B6192A

BATH

B6194A

ANTE RM

B6134

TOILET

B6134B

TOILET

B6193B

ANTE RM

B6193

CORRIDOR

B6C06

CORRIDOR

B6C05

RECEIVING

B6127

BATH

B6131A

BATH

B6127A

TWO BED

B6131

ONE BED

B6135

HAC

B6133

TWO BED

B6192

SUN DECK

B6188

SECLUSION

B6134A

SECLUSION

B6193A

NURSE STATION

B6128

MEDICATION

B6128A

WORK RM HOUSE

STAFF

B6104

STAFF TOILET

B6125

COPY

B6124

HAC

B6184A

DAY RM

RECREATION

B6184

NON-FOOD STRG

5C139

TOILET

5C138

TOILET

5C137

PSYCHIATRIST

OFFICE

5C144

HEAD NURSE

5C143

TELE

B6184C

ADL KITCHEN

5C133C

ELEVATOR

LOBBY

B6EGD

CORRIDOR

B6C01

SOCIAL WORK

OFFICE

5C147

PSYCHIATRIST

OFFICE

5C146

NURSE CLINICIAN

PHYSICIAN

ASSISTANT

5C142

CORRIDOR

5C-C9

HYDRO TANK

5C140

TRAY CART

STORAGE

5C133B

DINING

5C133A

BMS

5C159

CORRIDOR

B6C02

SALLY PORT

B6C02A

P-912

P-935

P-912

P-935

P-912 P-935

P-935

P-912

P-935

P-912

P-935

P-935

P-935

P-940

P-940

P-940

P-940

3 4

4" V

3/4" HW

1 1/2" CW

4" SAN

2" V

1" HW

2" CW

1 1/4" HW

2 1/2" CW 1 1/4" HW

2 1/2" CW

3/4" HW

3/4" CW

2" V

4" SAN

1 1/2" V

2" V

3" V

3" SAN

4" SAN

3/4" HW

3/4" CW

1 1/4" D

1 1/4" D

2 1/2" CW

3/4" HWR

1 1/2" CW

3/4" HW

3/4" HWR

2 1/2" CW

1 1/2" HW

2" CW

3/4" HWR

1 1/2" HW

2" CW

1 1/2" HW

1 1/2" CW

3/4" HW

4" SAN

2" V

2" V

4" V

4" V 4" V

4" V

4" V

4" SAN

4" SAN

4" SAN

4" V

3/4" HWR

1 1/2" HW

3/4" HWR

2 1/2" CW

2 1/2" CW

1 1/4" HW

3/4" HW

2" CW

1 1/2" CW

3/4" HW

3/4" CW

3/4" HW

3" SAN

3/4" CW

3/4" HW

4" V

4" SAN

4" SAN

2" V

4" V

4" V

1 1/2" V 4" V

4" V

2" V 3/4" HW

1 1/2" CW

1 1/2" CW

3/4" HW

3/4" CW

3/4" HWR

2" HW

3" CW

3/4" HW

1 1/2" CW

3/4" HW

1 1/2" CW

3/4" CW

3/4" HW

3" CW

2" HW

3/4" HWR

3/4" HW

3/4" CW

1 1/2" CW

4" V

3/4" CW

3/4" HW

4" SAN

2" V

1 1/2" CW

3/4" HW

3/4" CW

4" SAN

3" SAN

3" SAN

2" V 2" V 3" V

P-912

4" SAN

2" V

3" SAN

3/4" CW

3/4" CW

3/4" HW

4" SAN

4" SAN

4" SAN

2" V

3" SAN

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

3" SAN

4" V

1 1/2" CW

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA A

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NA 89502

MAT PERKINS

520-481-8548

/12 /20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h E

O C

C o m p lia n c e R e n o v a ti o n s /6

-2

-1

.1

.M

E P

F .r v t

/2

/2

:4

:4

P

M

P-106A

PLUMBING PLAN - LEVEL 6 - AREA A - NEW 654-20-117

02/12/2021 M. PERKINS G. WEAVER

BID DOCUMENT

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

SCALE: 1/4" = 1'-0"

F5

PLUMBING PLAN - LEVEL 6 - AREA A -

NEW

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION WHERE FEASIBLE.

ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR

REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED WITH THE COR 30 DAYS

IN ADVANCE AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS PRIOR TO INTERRUPTION.

C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO THE START OF WORK.

D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING HEIGHTS, AND

SQUARE FOOTAGE.

E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND OTHER TRADES PRIOR TO

CONSTRUCTION.

F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED CHASES UNLESS

NOTED OTHERWISE.

G. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED OTHERWISE ON PLAN.

H. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2019 NFPA 13.

I. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL LISTED FOR USE IN FIRE

PROTECTION SYSTEMS.

J. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH EXISTING BUILDING

STANDARDS.

K. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE SPECIFICALLY

PROHIBITED AS DEFINED BY NFPA 13.

L. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

M. ALL WELDING TO BE DONE IN SHOP BY CERTIFIED WELDERS.

N. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO COMPLETE THIS

PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN TO MATCH EXISTING

CONDITIONS AND FINISHES.

O. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

P. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED WALLS AND

ASSEMBLIES INDICATED ON PLANS IN WORK AREA. ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.

APPROVED FIRE PROOF CAULKING MATERIAL.

Q. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

R. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL VALVES. ACCESS

PANELS SHALL BE INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING AND SHALL BE VANDAL-PROOF ANDKEYED TO MATCH EXISTING ACCESS PANELS IN THE AREA. COR TO VERIFY PREFERRED KEY TO

BE USED FOR ANY NEW PANELS.

S. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE

EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES,

REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES REFLECT THE ACTUAL SPACE AVAILABLE. WHERE

SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE

DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE

INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY

PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.

PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE

PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE

PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.

T. COMPLETE COORDINATION/LAYOUT DRAWINGS SHALL BE REQUIRED BY SPECIFICATIONS AND

SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

1. NEW WALL MOUNTED LIGATURE RESISTANT WATER CLOSET, RECONFIGURE EXISTING ROUGH IN

PIPING TO NEW FIXTURE LOCATION. SEE SHEET P-500 FOR ADDITIONAL INFORMATION.

2. NEW COUNTER MOUNTED LIGATURE RESISTANT LAVATORY, RECONFIGURE EXISTING ROUGH IN

PIPING TO NEW FIXTURE LOCATION. SEE SHEET P-500 FOR ADDITIONAL INFORMATION.

3. NEW BUILT UP SHOWER, LIGATURE RESISTANT SHOWER BATH MIXING VALVE AND SHOWER HEAD ASSEMBLY, RECONFIGURE EXISTING ROUGH IN PIPING TO NEW FIXTURE LOCATION. SEE SHEET P-500

FOR ADDITIONAL INFORMATION.

4. PROVIDE NEW LIGATURE-RESISTANT TRENCH FLOOR DRAIN, SANITARY WASTE PIPING, AND VENT PIPING PER SPECIFICATION SECTION 22 13 00. CONNECT NEW DRAIN AND VENT PIPING TO EXISTING.

CUT AND PATCH EXISTING CONCRETE AS REQUIRED.

5. USE EXISTING ZONE VALVES TO PHASE PLUMBING WORK. SEE ARCHTECTURAL PLANS FOR PHASING

INFORMATION.

Revisions: Date:

1 - IFC COORDINATION 02.22.2021

NOTE: PLUMBING SCOPE OF WORK WILL REQUIRE ACCESS

COORDINATION WITH THE FLOOR BELOW FOR UNDER-SLAB

WORK. COORDINATE WORK PLAN (INCLUDING INTERIM LIFE-

SAFETY AND INFECTION CONTROL PLANS), ACCESS, AND DOWN-

TIME WITH COR TO ENSURE MINIMAL INTERRUPTION TO ON-

9.4

H I K L

ELEC EQUIP

B6139

GROUP THERAPY

B6143

ONE BED

B6147

ONE BED

B6149

BATH

B6147A

BATH

B6149A

ONE BED

B6150

BATH

B6150A

TWO BED

B6208

QUIET

B6146

TWO BED

B6206

BATH

B6206A

BATH

B6208A

WASHER DRYER

B6205

NOURISH

KITCHEN

B6203CLEAN UTILITY

B6201

CLEAN LINEN

B6199

OFFICE

B6140

TELE

B6142

RED BAG

STORAGE

B6138

SOILED UTILITY

B6136

LOCKER ROOM

B6195

TELE EQUIP

B6197

TWO BED

B6204

TWO BED

B6200

BATH

B6200A

BATH

B6204A

STAIR 2

BS2

TWO BED

B6194

BATH

B6194A

CORRIDOR

B6C06

ONE BED

B6137

CORRIDOR

B6C03

CORRIDOR

B6C04

RED BAG

STORAGE

B6138

SOILED UTILITY

B6136

LOCKER ROOM

B6195

ONE BED

B6137

CORRIDOR

B6C03

1 3

P-912

P-912

P-935

P-935

P-935

P-912

P-935

P-912

P-912

P-935 P-912

P-935

P-912

P-935

P-912

P-935

P-912

P-935

P-940

P-940

P-940

P-940

P-940

P-940

3 3

3 4

4 2

4 3

2" V

4" V

4" V 4" V

4" V

4" V

4" SAN

4" SAN

4" V

3/4" HWR

1 1/2" HW

3/4" HWR

2 1/2" CW

2" V

3/4" HWR

2" HW

3" CW

1 1/2" HW

2 1/2" CW

1 1/4" HW

1 1/4" HW

2 1/2" CW

4" V

1" CW

1" HW

3/4" HW

3/4" CW

3" SAN

2" V

3/4" HW

2" CW

1 1/2" CW

3/4" HW

1 1/2" CW

3/4" HW

1 1/2" CW

3/4" HW

4" SAN

4" SAN

2" V

2" V

4" V

1 1/4" HW

2 1/2" CW

1" HW

2 1/2" CW

2 1/2" CW

1" HW

2 1/2" CW

3/4" HW

1 1/2" CW

3/4" HW

3/4" CW

3/4" HW

3" CW

2" HW

3/4" HWR

2" CW

3/4" HW

1 1/2" CW

3/4" HW

3/4" HW

1 1/2" CW

3/4" HW

3/4" CW

3/4" CW

3/4" HW

1 1/2" CW

3/4" HW

4" V

2" V 2" V

2" V

1 1/2" CW

3/4" HW 1 1/2" CW

4" V

4" V

1" HW

3/4" CW

1" HW

1 1/2" CW

1" HW

1 1/2" CW

4" V

3/4" HW

1 1/2" CW

4" SAN

1 1/2" CW

4" V

3" SAN

3" V

3/4" HW

3/4" CW

3" SAN

4" SAN

2" V

3" SAN

2" V

2" V

3" SAN 3/4" HW3/4" CW

3" SAN

3/4" CW

3/4" HW

3" SAN

2" V

3" SAN

2" V

4" SAN4" V

1 1/2" CW

3" SAN

2" SAN

3" SAN

2" V

2" V

3/4" CW

3/4" HW

4" SAN

4" V

4" V

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

DEDUCT #1

P-940

3" SAN

1 1/2" CW

3" SAN

4" SAN

3" SAN

2" V

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEY PLAN

KEYNOTES

AREA B

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NA 89502

MAT PERKINS

520-481-8548

/12 /20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h E

O C

C o m p lia n c e R e n o v a ti o n s /6

-2

-1

.1

.M

E P

F .r v t

/2

/2

:4

:4

P

M

P-106B

PLUMBING PLAN - LEVEL 6 - AREA B - NEW 654-20-117

02/12/2021 M. PERKINS G. WEAVER

BID DOCUMENT

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

SCALE: 1/4" = 1'-0"

F3

PLUMBING PLAN - LEVEL 6 - AREA B -

NEW

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION WHERE FEASIBLE.

ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR

REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED WITH THE COR 30 DAYS

IN ADVANCE AND A PRE-CUTOVER MEETING IS TO OCCUR 2 DAYS PRIOR TO INTERRUPTION.

C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO THE START OF WORK.

D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING HEIGHTS, AND

SQUARE FOOTAGE.

E. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND OTHER TRADES PRIOR TO

CONSTRUCTION.

F. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED CHASES UNLESS

NOTED OTHERWISE.

G. ALL AREAS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY UNLESS NOTED OTHERWISE ON PLAN.

H. ALL SPRINKLERS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2019 NFPA 13.

I. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL LISTED FOR USE IN FIRE

PROTECTION SYSTEMS.

J. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH EXISTING BUILDING

STANDARDS.

K. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE SPECIFICALLY

PROHIBITED AS DEFINED BY NFPA 13.

L. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

M. ALL WELDING TO BE DONE IN SHOP BY CERTIFIED WELDERS.

N. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO COMPLETE THIS

PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND RETURN TO MATCH EXISTING

CONDITIONS AND FINISHES.

O. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS BETWEEN ALL

DISSIMILAR METALS.

P. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED WALLS AND

ASSEMBLIES INDICATED ON PLANS IN WORK AREA. ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.

APPROVED FIRE PROOF CAULKING MATERIAL.

Q. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

R. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL VALVES. ACCESS

PANELS SHALL BE INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING AND SHALL BE VANDAL-PROOF ANDKEYED TO MATCH EXISTING ACCESS PANELS IN THE AREA. COR TO VERIFY PREFERRED KEY TO

BE USED FOR ANY NEW PANELS.

S. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE

EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE ASSEMBLIES,

REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES REFLECT THE ACTUAL SPACE AVAILABLE. WHERE

SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE

DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE

INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY

PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.

PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE

PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE

PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.

T. COMPLETE COORDINATION/LAYOUT DRAWINGS SHALL BE REQUIRED BY SPECIFICATIONS AND

SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT

DRAWINGS HAVE BEEN APPROVED BY VA.

1. NEW WALL MOUNTED LIGATURE RESISTANT WATER CLOSET, RECONFIGURE EXISTING ROUGH IN

PIPING TO NEW FIXTURE LOCATION. SEE SHEET P-500 FOR ADDITIONAL INFORMATION.

2. NEW COUNTER MOUNTED LIGATURE RESISTANT LAVATORY, RECONFIGURE EXISTING ROUGH IN

PIPING TO NEW FIXTURE LOCATION. SEE SHEET P-500 FOR ADDITIONAL INFORMATION.

3. NEW BUILT UP SHOWER, LIGATURE RESISTANT SHOWER BATH MIXING VALVE AND SHOWER HEAD ASSEMBLY, RECONFIGURE EXISTING ROUGH IN PIPING TO NEW FIXTURE LOCATION. SEE SHEET P-500

FOR ADDITIONAL INFORMATION.

4. PROVIDE NEW LIGATURE-RESISTANT TRENCH FLOOR DRAIN, SANITARY WASTE PIPING, AND VENT PIPING SPECIFICATION SECTION 22 13 00. CONNECT NEW DRAIN AND VENT PIPING TO EXISTING. CUT

AND PATCH EXISTING CONCRETE AS REQUIRED.

5. USE EXISTING ZONE VALVES TO PHASE PLUMBING WORK. SEE ARCHTECTURAL PLANS FOR PHASING

INFORMATION.

Revisions: Date:

1 - IFC COORDINATION 02.22.2021

NOTE: PLUMBING SCOPE OF WORK WILL REQUIRE ACCESS

COORDINATION WITH THE FLOOR BELOW FOR UNDER-SLAB

WORK. COORDINATE WORK PLAN (INCLUDING INTERIM LIFE-

SAFETY AND INFECTION CONTROL PLANS), ACCESS, AND DOWN-

TIME WITH COR TO ENSURE MINIMAL INTERRUPTION TO ON-

PIPE SIZE 1/2"

PSI AVAILABLE = 4 PSI/100 FT (5 FPS MAX. VELOCITY)

PIPE SIZES - WATER FIXTURE UNITS

FLUSH VALVE FU -

TANK TYPE FU 1

3/4"

1"

1-1/4"

1-1/2"

2"

2-1/2"

3"

DESCRIPTION HW

4"

WASTE

2"

VENT

1-1/2"

CW

WALL MOUNTED

REMARKS

MIN. ROUGH-IN-SIZE

SYM

2"2"

PLUMBING FIXTURE ROUGH-IN SCHEDULE

COUNTER MOUNTED

-- 3/4" 3/4" NEW BUILD OUT

NOTE: PROVIDE VALVES (SHUT OFF, BALANCING, THERMOSTATIC, ETC.) PER SPEC 22 05 23.

3/4" 3/4"

P-912

P-935

P-940

FD-Z

LIGATURE RESISTANT WATER CLOSET

(ADA) HANDICAP (WALL MOUNTED, ASME A112.19.3 AND CSA B45.4) - SECURITY FIXTURE FABRICATED FROM 14 GAUGE OR 16 GAUGE TYPE 304 STAINLESS STEEL.

STAINLESS STEEL SHALL BE WHITE POWDER COATED. THE STANDARD TOILET SHALL INCLUDE: ELONGATED TOILET BOWL WITH CONTOURED SEAT, INTEGRAL CREVICE-FREE SELF- DRAINING FLUSHING RIM WITH POSITIVE AFTER FILL AND FULLY ENCLOSED TRAP WHICH SHALL MAINTAIN A MINIMUM 50 MM (2 INCH) SEAL AND PASS 54 MM (2-1/8 INCH) BALL. SKIRT OF TOILET BOWL SHALL BE EXTENDED TO FLOOR AS CLOSE TO FRONT OF TOILET BOWL TO PREVENT TIE OFF. 4.8 L (1.28 GALLONS) PER FLUSH. TOP OF SEAT SHALL BE 432 TO 483 MM (17 TO 19 INCHES) ABOVE FINISHED FLOOR. FIXTURE SHALL WITHSTAND LOADINGS UP TO 2000 LBS. WITH NO MEASUREABLE DEFLECTION AND LOADINGS UP TO 5,000 LBS. WITH NO PERMANENT DAMAGE.

FITTINGS AND ACCESSORIES: REAR WALL CHASE CONNECTIONS; 102 MM (4 INCH) WASTE AND 40 MM (1-1/2 INCH) WATER BACK SPUD. PROVIDE EXTRA HEAVY-DUTY CARRIER, TOILET WASTE EXTENSION, GASKETS, WALL SLEEVE, AND CLEANOUT. PROVIDE WATER CONNECTIONS WITH INDIVIDUAL SHUTOFF VALVE FOR EACH

FIXTURE.

SEAT: SEAT SHALL BE INTEGRAL WITH THE BOWL #4 SATIN FINISH HIGH POLISH SEAT.

FLUSH VALVE: ACTIVE HARD-WIRED ELECTRIC INFRA-RED SENSOR FOR AUTOMATIC OPERATION WITH COURTESY FLUSH BUTTON FOR MANUAL OPERATION, WATER SAVER DESIGN PER FLUSH WITH MAXIMUM 10 PERCENT VARIANCE, REAR SPUD CONNECTION, ADJUSTABLE TAILPIECE, 20 MM (1 INCH)

LIGATURE RESISTANT ADA HANDICAP LAVATORY

DIMENSIONS FOR LAVATORIES ARE SPECIFIED, LENGTH BY WIDTH (DISTANCE FROM WALL) AND DEPTH. BRASS COMPONENTS IN CONTACT WITH WATER SHALL CONTAIN NO MORE THAN 0.25 PERCENT LEAD CONTENT BY DRY WEIGHT. FAUCET FLOW RATES SHALL BE 3.9 L/M (1.5 GPM) FOR PRIVATE LAVATORIES AND EITHER

1.9 L/M (0.5 GPM) OR 1.0 LITERS (0.25 GALLONS) PER CYCLE FOR PUBLIC LAVATORIES. LIGATURE RESISTANT LAVATORY FRONT ACCESS HANDICAP LAVATORY FABRICATED FROM 14 GAUGE, TYPE 304 TYPE STAINLESS STEEL, THE CONSTRUCTION SHALL BE ALL WELDED, WITH EXPOSED STAINLESS STEEL SURFACES POLISHED TO A #4 SATIN FINISH, APPROXIMATELY 324 MM BY 209 MM (12-3/4 INCHES BY 8-1/4 INCHES) AND 127 MM (5 INCHES) DEPTH. STAINLESS STEEL ANTI- SUICIDE PENAL FILLER/BUBBLER, SLOW DRAIN WITH AIR VENT, ELBOW WASTE 20 MM (1-1/2 INCH FIP), SLOPED BACKSPLASH AND SELF-DRAINING SOAP DISH. PUNCHING FOR FAUCET ON 102 MM (4 INCHES) CENTERS. VALVE AND BUBBLER CONFORMS WITH LEAD FREE REQUIREMENTS OF NSF61, SECTION9, 1997 AND CHSC 116875.

FAUCET: SOLID CAST BRASS CONSTRUCTION, VANDAL RESISTANT, HEAVY-DUTY, HEMISPHERICAL PUSHBUTTONS.SINGLE TEMPERATURE AIR CONTROL VALVE ASSEMBLY. PROVIDE LAMINAR FLOW CONTROL DEVICE, ADJUSTABLE HOT WATER LIMIT STOP, AND VANDAL PROOF SCREWS. FLOW SHALL BE LIMITED TO 1.9 L/M (0.5

GPM) WITH HEMISPHERICAL PENAL BUBBLER.

DRAIN: CAST OR WROUGHT BRASS WITH FLAT, LIGATURE RESISTANT GRID STRAINER OFFSET TAILPIECE, CHROME PLATED. POP-UP DRAINS ARE PROHIBITED.

PROVIDE COVER PER A.D.A 4-19.4.

STOPS: ANGLE TYPE. PROVIDE COVER PER A.D.A 4-19.4.

TRAP: CAST COPPER ALLOY, 38 MM BY 32 MM (1 1/2 INCHES BY 1 1/4 INCHES) P-TRAP. ADJUSTABLE WITH CONNECTED ELBOW AND 1.4 MM THICK (17 GAUGE) TUBING EXTENSIONS TO WALL. EXPOSED METAL TRAP SURFACE AND CONNECTION HARDWARE SHALL BE CHROME PLATED WITH A SMOOTH BRIGHT FINISH STAINLESS STEEL

TRAP ENCLOSURE. SET TRAP PARALLEL TO WALL. PROVIDE COVER PER A.D.A 4- 19.4.

SHOWER BATH MIXING VALVE

(BUILT UP SHOWER BY ARCHITECT)

WALL MOUNTED, CONCEALED SUPPLIES, TYPE T/P COMBINATION VALVE WITH LIGATURE RESISTANT SINGLE LIGATURE RESISTANT HANDLE.

SHOWER HEAD ASSEMBLY: METALLIC INSTITUTIONAL SHOWER HEAD WITH FLOW CONTROL TO LIMIT DISCHARGE TO 5.7 L/M (1.5 GPM) CONICAL LIGATURE RESISTANT

SHOWERHEAD, CHROME PLATED BRASS.

VALVES: SHOWER VALVE SHALL MEET PERFORMANCE REQUIREMENTS OF ASSE 1016 LEAD FREE TYPE T/P COMBINATION THERMOSTATIC AND PRESSURE BALANCING INDIVIDUAL SHOWERS, WITH CHROME PLATED METAL, LIGATURE RESISTANT SINGLE TYPE OPERATING HANDLE ADJUSTABLE FOR ROUGH-IN VARIATIONS AND CHROME PLATED METAL. VALVE BODY SHALL BE ANY SUITABLE COPPER ALLOY. INTERNAL PARTS SHALL BE COPPER, NICKEL ALLOY, CRS OR THERMOPLASTIC MATERIAL. VALVE INLET AND OUTLET SHALL BE 13 MM (1/2 INCH) IPS. PROVIDE EXTERNAL SCREWDRIVER CHECK STOPS, VACUUM BREAKER AND TEMPERATURE LIMIT STOPS. SET STOPS FOR A MAXIMUM TEMPERATURE OF 50 DEGREES C (120 DEGREES F). ALL EXPOSED FASTENERS SHALL BE VANDAL RESISTANT. VALVE SHALL

PROVIDE A MAXIMUM OF 5.7 L/M (1.5 GPM) AT 310 KPA (45 PSIG) PRESSURE DROP.

A. FOR HANDICAP ACCESS FIXTURES, PROVIDE KNURLED DIVERTER VALVE HANDLE WITH HAND-HELD, LIGATURE RESISTANT SHOWER HEAD WITH HOOK. HOSE

AND HOOK SHALL BE ON QUICK DISCONNECT SO THAT WHEN HEAD IS REMOVED, HOOK IS ALSO DISCONNECTED.

B. SHOWER FLOOR OR TRENCH DRAINS SHALL BE VANDAL RESISTANT AND AS SPECIFIED IN SECTION 22 13 00, FACILITY SANITARY AND VENT PIPING.

LIGATURE RESISTANT TRENCH DRAIN

CONSTRUCTED OF TYPE 304 STAINLESS STEEL SUITABLE FOR SHOWER THRESHOLD, SHALL COMPLY WITH ASME A112.6.3. STAINLESS STEEL SOLID RIM GRATE SHALL NOT BE LESS THAN 4" WIDE WITH ANCHOR SUPPORTS, BOTTOM OUTLET, AND COMBINATION MEMBRANE FLASHING COLLAR. PROVIDE SOLID RIM OPTIONS WITH CUSTOM LENGTH TO FIT SHOWER THRESHOLD. SET IN BUILT UP SHOWER BY ARCHITECT, SLOPE BUILT-UP SHOWER PER MANUFACTURERS REQUIREMENTS.

BASIS OF DESIGN J.R. SMITH #9666

PLUMBING SPECIFICATION SCHEDULE

WATER CLOSET

LAVATORY

SHOWER

P912

P935

P940

NOTE: SEE SPECIFICATION SECTIONS 22 13 00 AND 22 40 00 FOR ADDITIONAL REQUIREMENTS.

2"3" SET IN NEW SHOWER BUILD OUTTRENCH DRAINFD-Z - -

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NA 89502

MAT PERKINS

520-481-8548

/12

/20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h E

O C

C o m p lia n c e R e n o v a ti o n s /6

-2

-1

.1

.M

E P

F .r v t

/1

/2

:2

:1

P

M

P-500

PLUMBING DETAILS AND SCHEDULES 654-20-117

02/12/2021 M. PERKINS G. WEAVER

BID DOCUMENT

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

SD

24"x12"

24"/12"

12" o

V

HWR

HWS

DOWN

CHR

CHS

GENERAL NOTES:MECHANICAL SYMBOL LEGENDABBREVIATIONS

VALVE ASSEMBLY

FIRE DAMPER

FLEXIBLE DUCT

ACOUSTICAL DUCT LINING

FLEXIBLE CONNECTION

MANUAL BALANCING DAMPER

SMOKE DAMPER

MITERED ELBOW (ALL MITERED ELBOWS ARE TO HAVE

VANES EXCEPT TRANSFER AIR SOUND ELBOW)

EXISTING DUCT TO BE REMOVED

CONNECT NEW DUCT TO EXISTING DUCT

SUPPLY DUCT, SECTION

EXHAUST DUCT, SECTION

RETURN DUCT, SECTION

DUCT TRANSITION

OR REGISTER

STANDARD RADIUS ELBOW

SHORT RADIUS VANED ELBOW (ALL SHORT

RADIUS ELBOWS ARE TO HAVE VANES PER

SMACNA)

CEILING RETURN AIR REGISTER OR TRANSFER AIR GRILLE

INDICATES A RECTANGULAR DUCT SIZE (WIDTH x DEPTH)

INDICATES A FLAT OVAL DUCT SIZE (WIDTH x DEPTH)

INDICATES A ROUND DUCT SIZE

IF THROW IS SOMETHING OTHER THAN 4-WAY)

CEILING DIFFUSERS (ARROWS DENOTE THROW PATTERN

DUCTED EXHAUST REGISTER

SIDEWALL EXHAUST OR RETURN AIR GRILLE

SIDEWALL SUPPLY REGISTER

H

T

ACCESS DOOR

SEE CONTROL DRAWINGS FOR TYPE

ROOM HUMIDISTAT/HUMIDITY TRANSMITTER LOCATION ONLY

SEE CONTROL DRAWINGS FOR TYPE

ROOM THERMOSTAT/TEMP. TRANSMITTER LOCATION ONLY

DUCT MOUNTED STATIC PRESSURE PROBE

XX - ## NUMBERS REFER TO SPECIFIC EQUIPMENT

SYMBOL INDICATES NEW EQUIPMENT

EQUIPMENT SYMBOLS

IDENTIFIED IN EQUIPMENT SCHEDULE

CFM

SYMBOL INDICATES GRILLE OR

DIFFUSER IDENTIFIED IN EQUIPMENT SCHEDULE

SIDEWALL GRILLE DIMENSION WHERE

SHOWN ON PLANS

LETTERS REFER TO THE EQUIPMENT TYPE

ACCESS DOOR

AIR CONDITIONING UNIT

ABOVE FINISHED FLOOR

ACOUSTIC LINING

ACU

AD

AFF

AL

BOP

BOD

BOTTOM OF PIPE

BOTTOM OF DUCT

CUBIC FEET PER MINUTE

CLEANOUT

CFM

CO

MOTOR CONTROL CENTERMCC

NOT APPLICABLE

NOT IN CONTRACT

NUMBER (QUANTITY)

NA

NIC

NO.

OUTSIDE AIR

OPPOSED BLADE DAMPER

OA

OBD

PSIG

PRV PRESSURE REDUCING VALVE

POUNDS PER SQUARE INCH GAGE

QUADRANT

QUANTITYQTY

QUAD

RETURN AIRR.A.

SMOKE CONTROL DAMPERSCD

EXHAUSTEXH

FLAT TOP

FEET PER MINUTE

FT

FPM

DEGREES FAHRENHEIT

FAN COIL UNIT

FLOOR DRAIN

FLEXIBLE

FCU

FD

FLEX

°F

TOPT TOP OF PIPE TRAPEZE

VENT THRU ROOFVTR

VEL

VAV VARIABLE AIR VOLUME

VELOCITY

GALLONS PER HOUR

GALLONS PER MINUTE

GPH

GPM

HAND DAMPER (VOLUME DAMPER)

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HD

HEPA

INCHESIN

MAKE-UP WATER

CONDENSATE DRAIN

CHILLED WATER RETURN

CHILLED WATER SUPPLY

HEATING WATER RETURN

HEATING WATER SUPPLY

PIPING SYMBOLS

DIRECTION OF FLOW

DIRECTION OF PIPE PITCH (DOWN)

WATER FLOW MEASURING DEVICE

PLUG VALVE

VALVE SYMBOLS

GATE VALVE

GLOBE VALVE

CHECK VALVE

PRESSURE REDUCING VALVE

THREE-WAY MODULATING CONTROL VALVE

TWO-WAY CONTROL VALVE

SAFETY VALVE OR PRESSURE RELIEF

MANUAL AIR VENT

SOLENOID VALVE

3/4" GATE VALVE WITH ADAPTER TO 3/4"

HOSE THREAD

BUTTERFLY VALVE

BALL VALVE

VALVE IN RISE

WCO

WH

WALL CLEANOUT

WALL HYDRANT

V

VAC

VOLTS

VOLTS, ALTERNATING CURRENT

TP TOTAL PRESSURE (INCHES OF WATER)

SP STATIC PRESSURE (INCHES OF WATER)

Rh

RPS

RELATIVE HUMIDITY

ROOM PRESSURE SENSOR

KWH

KW KILOWATT

KILOWATT HOUR

HB HOSE BIBB

FS FLOOR SINK

FCO FLOOR CLEANOUT

ENT ENTERING

DX DIRECT EXPANSION

BTU

BTUH

BRITISH THERMAL UNIT

BTU PER HOUR

BHP BRAKE HORSEPOWER

DUCTWORK SYMBOLS

VENT

SECTION SYMBOLS

SDVV SINGLE DUCT VARIABLE VOLUME

ST SOUND TRAP

TYP. TYPICAL

CONT. CONTINUATION

DDC DIRECT DIGITAL CONTROL

EMCS ENERGY MANAGEMENT CONTROL SYSTEM

FT. FEET

F.G. FILTER GAUGE

FB FLAT BOTTOM

MA MAIN AIR (CONTROLS)

NOTE: NOT ALL ABBREVIATIONS AND

SYMBOLS APPLY TO THIS PROJECT.

COMBI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .