654-20-117 Mental Health EOC_Part2.pdf
PDF 11 MB Posted
- Attached to
- Y1DA--Mental Health EOC Compliance Federal contract opportunity
- Solicitation number
- 36C26121R0072
About this file
This federal contract opportunity notice seeks compliance with mental health Emergency Operations Center standards and renovations to inpatient mental health doors and door frames.
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 issued solicitation number 36C26121R0072 to obtain compliance with Project 654-20-141 for inpatient mental health Emergency Operations Center standards and Project 654-17-713 for inpatient mental health door frames and doors. Interested parties should respond with proposals by the solicitation response date to provide Emergency Operations Center compliance services and replace or renovate inpatient mental health doors and door frames for multiple VA medical centers within Veterans Integrated Service Network 21. The contract is set to be awarded by the anticipated award date to the selected vendor.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
/12
/20
B
IM
/6
-2
-1
I n p a ti e n t M e n ta l H e a lt h
E O
C C o m p lia n c e
R e n o v a ti o n s /6
-2 -1
.1
.A rc h .r v t
/1
/2
:4
:1
P
M
GI050
GENERAL NOTES
TRIPLE C - The A/E Group
1345 CAPITAL BLVD. SUITE A
RENO, NV 89502
MAT PERKINS
520-481-8548
654-20-117
02/12/2021 MP CJL
BID DOCUMENTS
SUBMITTAL
INPATIENT MENTAL HEALTH EOC
COMPLIANCE RENOVATIONS
975 KIRMAN AVENUE RENO, NV 89502-0993
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR
THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL
AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING
SPECIFICATION MANUAL FOR NEW WORK AND THE MPI
MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK. REFER TO SPECIFICATION SECTION
"09 91 00 - PAINTING" FOR ADDITIONAL INFORMATION.
2. PAINTING WORK: INCLUDES TAPING, SURFACE
PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD
PAINTING AND FINISHING AS REQUIRED BY STANDARD
PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED
COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP
PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK
ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS
MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT
NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED
OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR
AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES,
WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW
ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL
AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND
PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE
SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT
RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS,
SPECIFICATIONS AND PAINTING GENERAL NOTES. THESE
SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD
PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,
DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND
PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED
AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF
ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND
MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF
PIPING FOR MECHANICAL AND PLUMBING WORK IS
COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT
AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE
OF PAINT COLOR. COMPLETED PAINTING SHALL NOT
IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS
WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE
REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND
COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA
ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OR IF
TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE
ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING
EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT
PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR
INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE
INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC
MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL
EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,
LIGHTING FIXTURES, SWITCHGEAR, MOTORS,
DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR
SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO
PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES
LISTED IN SECTION 01 33 23.
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE
INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED
ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,
COPPER, BRASS, BRONZE AND SIMILAR FINISHED
MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,
DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS
IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,
INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE
SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS
OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF
OPERATING UNITS SUCH AS VALVES, DAMPER
OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT
SENSING OR EMITTING DEVICES THAT MIGHT NOT
FUNCTION PROPERLY IF PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-
REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT
COMPLETION OF WORK.
13. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,
REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE
ALL EXISTING AND CONTRACTOR-CAUSED HOLES, CRACKS,
AND OTHER IMPERFECTIONS FILLED WITH APPROVED
PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH
ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE
OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
14. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT
MATERIALS AND FINISHES. APPLY THE APPROPRIATE
SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL
NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-
BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL
BASE PAINT).
GENERAL PAINTING NOTES:
1. SEE SPECIFICATION SECTION 07 92 00 "JOINT SEALANTS"
FOR ADDITIONAL INFORMATION.
2. THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO
FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR
BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR
WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED
WITH SEALANTS. SEALANT IS ALSO USED TO ENSURE
MATERIALS CANNOT BE EASILY REMOVED BY HAND. USE A
HIGH-STRENGTH ADHESIVE TO FACILITATE THIS.
3. THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO
ENHANCE APPEARANCE AND FINISH AT INTERIOR
APPLICATIONS AND IN SOME SITUATIONS TO REDUCE
AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE
EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE
SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.
OTHER USES MAY BE NOTED IN THE SPECIFICATIONS
AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING
SHOULD BE USED, FOLLOW PROCEDURES LISTED IN
SECTION 01 33 23.
4. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND BOTH SIDES OF DOOR FRAMES.
5. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES
AND EXPOSED SUPPORTS.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS
BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,
CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL
TO P-LAM, ETC).
7. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL
GAPS OR 1/16TH INCH OR MORE.
8. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS
THROUGH, FLOORS AND WALLS.
9. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND
CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE
SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A
BED OF SEALANT.
10. USE SPECIFIED CAULK OR SEALANT AROUND
PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH
AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE
ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,
LIGHTING, VENTS, ETC.
GENERAL SEALANT / CAULKING
NOTES:
PHASE 1:
PHASING NOTES:
DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOMS
B6135 AND B6137, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO
THE START OF PHASE 2.
GENERAL:
THIS FACILITY WILL BE IN OPERATION FOR THE ENTIRETY OF
THE PROJECT'S CONSTRUCTION, AND IS A 24/7 FACILITY. ALL
WORK SHALL BE COORDINATED TO MINIMIZE INTERRUPTIONS
TO OPERATIONS AND WORKFLOW. ALL DOORS MUST BE KEPT
OPERATIONAL AT ALL TIMES. DO NOT BLOCK ANY DOORS
FROM FULLY OPENING OR CLOSING.
PHASE 2:
DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOM
B6147, INCLUDING THE RESTROOM CORE. ACCEPTANCE AND
TURNOVER TO BE COMPLETED PRIOR TO THE START OF
PHASE 3.
PHASE 3: (DEDUCT #1)
DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOMS
B6149 AND B6150, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO
THE START OF PHASE 4.
PHASE 4:
DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS
B6208 AND B6206, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO
THE START OF PHASE 5.
PHASE 5:
DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS
B6200 AND B6204, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO THE
START OF PHASE 6.
PHASE 6:
DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS
B6192 AND B194, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO THE
START OF PHASE 7.
PHASE 7:
DEMOLITION AND RENOVATION OF NURSES STATION AND
ADJACENT CORRIDOR. ACCEPTANCE AND TURNOVER TO BE
COMPLETED PRIOR TO THE START OF PHASE 8.
PHASE 8:
A: - RENOVATE RECEIVING AND TWO-BED RESIDENT ROOM
B6127 & B6131.
B: INSTALL NEW INTERIOR WINDOWS AT STAFF WORK ROOM
(B6104).
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO
START OF PHASE 9.
PHASE 9: (DEDUCT #2 FLOORING ONLY)
INSTALL NEW INTERIOR WINDOWS AT SUN DECK EXTERIOR.
REMOVE AND REPLACE GLAZING AT DINING ROOM /
RECREATION ROOM INTERIOR WINDOW WALLS. REPLACE SINK
FIXTURES IN ANTE ROOM TOILETS. REMOVE AND REPLACE
HANDRAILS, DOORS, LIGHT FIXTURES, GRILLES, SIGNAGE, ETC.
IN REMAINDER OF PROJECT AREA. INSTALL CORRIDOR
FLOORING. COMPLETE ALL OTHER OUTSTANDING WORK.
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS. SEE
SPECIFICATION SECTION 01 00 00 - "GENERAL
REQUIREMENTS" FOR ADDITIONAL INFORMATION.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND
REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK
MUST BE INSPECTED AND APPROVED BY LOCAL
AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE
VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION
AND CONSTRUCTION. IF INCONSISTENCIES,
CONTRADICTIONS OR OMISSIONS ARE DISCOVERED
FOLLOW PROCEDURES LISTED IN SECTION 01 33 23.
4. GENERAL CONTRACTOR SHALL COORDINATE ALL
MECHANICAL AND ELECTRICAL DUCT SIZES AND
LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT
THE USE OF A KEY OR SPECIAL KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE
INSTALLED LEVEL WITH EACH OTHER AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE
GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED
TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE
FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE
FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS
REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN
SECTION 01 33 23.
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING
CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT
ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE
CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO
ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING
WORK RELATED TO ANY DISCREPANCIES. SEE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,
SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT
BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO
HAVE ELECTED THE MORE COSTLY TIME, METHOD,
SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS
AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE
CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS
WITH COR, INCLUDING STAGING AREAS, MATERIAL
STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES. SEE
SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE
THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE
ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR
FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO
COORDINATE PENETRATIONS THROUGH FOUNDATIONS,
FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY
SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL
SURFACE ATTACHED METAL SHALL BE SEPARATED FROM
CONCRETE OR MASONRY BY NON-METALLIC MATERIAL
SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL
EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING
OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL
ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK
PERMITS TO BE COORDINATED WITH COR. SUBMIT
CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
18. ANTI-LIGATURE REQUIREMENT: CONTRACTOR SHALL
VERIFY THAT ALL IMPROVEMENTS, SHOP SUBMITTAL
INFORMATION, AND INSTALLATIONS MEET THE ANTI-
LIGATURE REQUIREMENTS OF THIS PROJECT PRIOR TO
INSPECTION AND TURNOVER.
GENERAL NOTES: GENERAL FIRE & LIFE SAFETY
NOTES:
FIRE ALARM
1. ANY MODIFICATIONS TO THE EXISTING FIRE ALARM
SYSTEM SHALL BE IN ACCORDANCE WITH CLASS "a"
PROTECTION OF NFPA 101 LIFE SAFETY CODE.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES; AND SECTION 28 31 00 FIRE
DETECTION AND ALARM FOR APPROVAL PRIOR TO THE
INSTALLATION.
3. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN
PLACE AND IN USE. IF ANY MODIFICATIONS TO THE
SYSTEM ARE REQUIRED, THE CONSTRUCTION
CONTRACTOR MUST EITHER HIRE THE CURRENT FIRE
ALARM MAINTENANCE CONTRACTOR TO PERFORM ALL
WORK OR IF THE WORK IS COMPLETED BY ANOTHER FIRE
ALARM CONTRACTOR, THE CONSTRUCTION CONTRACTOR
MUST HIRE THE CURRENT FIRE ALARM MAINTENANCE
CONTRACTOR TO FULLY INSPECT, TEST, AND CERTIFY THE
WORK DONE BY ANOTHER CONTRACTOR.
4. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA
THAT IS BEING REMODELED, AT THE CONCLUSION OF THE
WORK, THE FIRE ALARM CONTRACTOR IS TO TEST ALL
FIRE ALARM DEVICES WITHIN THE AREA OF THE REMODEL
AREA WHETHER OR NOT THEY WERE MODIFIED AS PART
OF THE PROJECT.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE
WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND
SHALL MAINTAIN THEM DURING THE COURSE OF
CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.
CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C
FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND
SHALL BE DRY CHEMICAL TYPE.
EXIT & EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING
TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT
REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR
INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;
CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE
WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY
LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE
POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE
DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2"
BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH
THE LOCAL AND CURRENT NEC GUIDELINES.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES
TO BE RETAINED AND REUSED. CONTRACTOR TO VERIFY
THE EXACT SIZE AND LOCATION IN FIELD.
2. RE-USE EXISTING WHERE MODIFIED, OR PROVIDE NEW IF
EXISTING ARE UNUSABLE. ALL WORK TO BE INSTALLED IN
ACCORDANCE WITH 2019 NFPA 13. SEE FIRE PROTECTION
PLANS.
3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD
PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
4. WHENEVER EXISTING FIRE SPRINKLER PIPING IS
REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO
ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE
WRITTEN OBSTRUCTION DOCUMENTATION IN
ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE
STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE
OR FLAME-PROOFED IN AN APPROVED MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS
LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF
NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF
NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE
INSTALLATION, INCLUDING INSULATION, FACING
MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-
CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25
AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED
IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE
CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR.
LATCHING AND LOCKING DOORS THAT ARE HAND-
ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL
BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT
REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT
FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM
AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE
AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE
DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR
PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A
UL APPROVED METHOD AND MATERIAL.
FIRE & SMOKE DAMPERS
1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED
AND REUSED. UPON COMPLETION OF PROJECT, RE-TEST
AND RECERTIFY FIRE & SMOKER DAMPERS, PROVIDE
DOCUMENTATION TO COR.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.
THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND
FIRE ALARM SYSTEM.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO
COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES
AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE
ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF
DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,
FOLLOW PROCEDURES LISTED IN SECTION 01 33 23. IF
DISCREPANCIES ARE DISCOVERED AFTER THE BID,
FOLLOW PROCEDURES LISTED IN SECTION 01 33 23 PRIOR
TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL
AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED
BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND
SHOP DRAWINGS CONTRACTOR SHALL VERIFY
DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR
PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,
SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR
ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES
MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X
4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT
NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT
ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT
BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.
(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE
SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
6. FLOOR PLAN DIMENSIONS
A. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE
TO ONE FACE OF THE STUDS, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE
WALLS, ETC, UNLESS NOTED OTHERWISE.
B. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL
(UNLESS NOTED AS "NOM").
C. DOOR OPENING DIMENSIONS IN FRAME
CONSTRUCTION (WOOD OR STEEL STUDS) ARE
TYPICALLY SHOWN AT THEIR CENTERLINES.
HOWEVER, WHEN THE EDGE OF THE DOOR IS
IMPORTANT, OR MAKES THE PLACEMENT CLEARER,
THE DIMENSION MAY BE TO THE ACTUAL FRAME
EDGE.
D. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS
TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR
CONCRETE, AT NEARBY PERPENDICULAR WALLS
ARE TYPICALLY 4", DEPENDING ON HARDWARE
CLEARANCES AND FRAME REQUIREMENTS (2.5"-
DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=
4.0")
E. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH
AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR
PREFABRICATED STAIR ENCLOSURES, ARE NOTED
"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES
OF FINISHES.
F. DIMENSIONS DESIGNATED WITH "MIN" INDICATE
THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
7. VERTICAL DIMENSIONS
A. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON
ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATING, BUT DO NOT INCLUDE
FINISHES OR ROOFING MATERIAL.
B. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE
TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE
THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER
FINISH FLOOR ELEVATION
C. LIGHTING HEIGHTS ON WALLS ARE TO
CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE
ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UNO.
D. SOME VERTICAL DIMENSIONS ARE SHOWN ON
PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE
SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND
INDICATES THE + OR - ELEVATION CHANGE IN
INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
GENERAL DIMENSIONING
NOTES:
1. HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION
TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF
DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO
MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION
WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF
ALL ITEMS PER SPECIFICATIONS. THE COR RESERVES THE RIGHT
TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL
BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK
THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS
OR PENETRATIONS LEFT BY THE INSTALLATION OR
CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO
MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR ROOF
ASSEMBLY.
5. IF THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY
OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION
ACTIVITIES; TEMPORARY BARRICADES PERTAINING TO THE
CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT
POSSIBLE INJURY IN AND AROUND DEMOLITION AND
CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA
REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA AND
PUBLIC ACCESS WITH COR PRIOR TO CONSTRUCTION. PROTECT
SIGNAGE WITHIN PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND
DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED UTILITY &
DEMOLITION WORK AND PROJECT PHASING NOTES. COORDINATE
UTILITY SYSTEM SHUTDOWNS WITH COR.
GENERAL DEMOLITION AND
PHASING NOTES:
A. SEE SPECIFICATION SECTIONS 01 35 26 - "SAFETY
REQUIREMENTS" AND 01 58 16 "TEMPORARY INTERIOR
SIGNAGE" FOR ADDITIONAL INFORMATION.
B. SEE SHEETS GI101, GI301 & GI302 FOR ADDITIONAL LIFE
SAFETY AND ICRA INFORMATION AND REQUIREMENTS.
C. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE RENO VA MEDICAL CENTER
ICRA PLAN AND AS DIRECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE (COR).
D. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS
PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES
(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD TO
THE CONSTRUCTION SITE SHALL BE POSTED AS PER THE
ISLM PLAN.
E. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
F. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS
SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER
WORK.
G. CONSTRUCT ANTEROOM AT ENTRANCES TO
CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION
PERSONNEL TO PASS THROUGH THIS ROOM TO BE
VACUUMED WITH HEPA VACUUM CLEANER PRIOR TO
LEAVING THE SITE.
H. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL
FOR OCCUPIED AREAS ON THE FLOOR.
I. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
J. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
K. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION
AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,
THROUGHOUT DURATION OF PROJECT USING HEPA
EQUIPPED AIR FILTRATION UNITS.
L. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR
OR EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
M. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS
AND VISITORS SO THEY DO NOT EXIT THROUGH THE
CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO
THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION
AREA-DO NOT ENTER".
N. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND
KEEP A CURRENT HOT WORK PERMIT ON SITE.
O. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO
MAKE SURE THEY REMAIN EFFECTIVE.
P. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.
ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS
AND/OR CONTAINERS.
Q. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM
PIPES AND CONDUITS APPROPRIATELY AND IMMEDIATELY
TO MAINTAIN DUST PROTECTION AND NEGATIVE AIR
PRESSURE.
R. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST
MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING
RAGS FOR CLEANING FINE DUST FROM FLOORS AND
ADJACENT OCCUPIED AREAS. ANY DUST TRACKED
OUTSIDE OF CONSTRUCTION AREA SHALL BE CLEANED
IMMEDIATELY.
S. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION
AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH
DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON
APPROVAL). PATCH OR REPAIR ANY DAMAGE FROM
CONSTRUCTION BARRIER REMOVAL AND REMOVE
ISOLATION OF HVAC SYSTEM.
T. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
EACH PHASE IS COMPLETED AND INSPECTED BY VA
SAFETY PERSONNEL, INFECTION CONTROL GROUP, AND
COR.
U. CONTRACTOR SHALL ENSURE THAT ACCESS TO BOTH
MEANS OF EGRESS (STAIR 1 AND STAIR 2) ARE ACCESSIBLE
FROM OCCUPIED SPACES AT ALL TIME. IN CASES WHERE
AN ENTIRE CORRIDOR WIDTH NEEDS TO BE TEMPORARILY
BARRICADED (E.G. PHASE 2 & PHASE 7), MAINTAIN AT
LEAST ONE PATHWAY TO BOTH EXITS, AND USE
TEMPORARY SIGNAGE TO CLEARLY DIRECT
OCCUPANTS.FOR EACH PHASE, CONTRACTOR SHALL
PREPARE INTERIM LIFE SAFETY MEASURE (ILSM) PLANS TO
COORDINATE CHANGES TO PATHWAYS TO EGRESS,
TEMPORARY BARRIERS AND SIGNAGE, ETC. ALL ILSM
PLANS, INCLUDING TEMPORARY BARRIERS AND SIGNAGE,
TO BE REVIEWED AND APPROVED BY COR AND MEDICAL
TEAM PRIOR TO INSTALLATION.
GENERAL ICRA AND LIFE-
SAFETY NOTES:
Revisions: Date:
LIFE SAFETY SYMBOLS
XX PATH OF TRAVEL
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
APPLICABLE BUILDING CODES
• 2018 NFPA 101 LIFE SAFETY CODE & 2016 NFPA 72
NATIONAL FIRE ALARM AND SIGNALING CODE & 2016 NFPA
13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS.
EXCEPTION OF NFPA 5000 AND NFPA 900
• 2018 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2017 NATIONAL ELECTRICAL CODE (NEC)
• 2018 INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,
BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND
RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00
00 AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2016; MEDICAL SPACES - ASHRAE
170-2013, NON-MEDICAL SPACES - ASHRAE 62.1-2016
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS –
ASHRAE STANDARD 15–2013
• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE
DIRECTED BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF
APPLICABLE STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION (2015)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4 TYPE OF BUILDING REHABILITATION: Minor Rehabilitation, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA
101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT
SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS
STORAGE 1 HOURS
CLASSIFICATION OF OCCUPANCY:
EXISTING: HEALTH CARE Occupancy per Chapter 19
MIXED BUILDING OCCUPANCY TYPE:
PRIMARY - HEALTHCARE
6.1.5.1 Health Care Occupancy. An occupancy used to provide medical or other treatment or care simultaneously to four or more patients on an inpatient basis, where such patients are mostly incapable of self-preservation due to age, physical or mental disability, or because of security measures not under the occupants' control.
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantilre, BUSINESS, industrial, or storage use
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or stucture, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
19.2.6.2.1 The travel distance between any point in a room and an exit shall not exceed 150 ft.
19.2.6.2.2 The maximum travel distance...shall be permitted to be increased by 50 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
HEALTH CARE OCCUPANCY; PROTECTED = 200'-0"
OCCUPANT LOAD:
19.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
CALCULATED OCCUPANT LOADS
Total Floor Area - 19,849 SF (no change) Occupancy - Healthcare, sleeping departments (no change) Occupancy Factor - 120 SF per Occupant, Gross Total Occupant Count - 166 Occupants (no change)
MEANS OF EGRESS:
19.2.3 Capacity of Means of Egress.
19.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
19.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 44 in. (1120 mm).
19.2.4 Number of Means of Egress.
19.2.4.3 Not less than two exits of the types described in 19.2.2 shall be accessible from each smoke compartment.
19.2.4.4 Egress from smoke compartments addressed in 19.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.
19.2.5.2 Dead End Corridors. Existing dead-end corridors exceeding 30 feet shall be permitted to continue in use if it is impratical and unfeasible to alter them.
PROTECTION OF VERTICAL OPENINGS:
18/19.3.1 Protection of Vertical Openings.
18/19.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
19.3.2 Protection from Hazards.
19.3.2.1 Hazardous Areas
19.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 19.3.2.1.2 and 19.3.2.1.3 shall be protected as indicated.
19.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7.1:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material 18.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.
18.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
18.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
RECEIVING
B6127
207 SF
BATH
B6131A
81 SF
BATH
B6127A
58 SF
TWO BED
B6131
272 SF
ONE BED
B6135
220 SF
HAC
B6133
38 SF
BATH
B6137A
53 SF
BATH
B6135A
57 SF
ELEC
EQUIP
B6139
43 SF
GROUP
THERAPY
B6143
460 SF
ONE BED
B6147
179 SF
ONE BED
B6149
192 SF
BATH
B6147A
41 SF
BATH
B6149A
69 SF
ONE BED
B6150
198 SF
BATH
B6150A
38 SF
TWO BED
B6208
270 SF
QUIET
B6146
276 SF
TWO BED
B6206
268 SF
BATH
B6206A
56 SF
BATH
B6208A
56 SF
WASHER
DRYER
B6205
80 SF
NOURISH
KITCHEN
B6203
75 SF
CLEAN
UTILITY
B6201
120 SF
CLEAN
LINEN
B6199
61 SF
OFFICE
B6140
135 SF
TELE
B6142
51 SF
RED BAG
STORAGE
B6138
64 SF
SOILED
UTILITY
B6136
93 SF
LOCKER
ROOM
B6195
84 SF
TELE
EQUIP
B6197
64 SF
TWO BED
B6204
262 SF
TWO BED
B6200
270 SF
BATH
B6200A
59 SF
BATH
B6204A
59 SF
STAIR 2
BS2
193 SF
TWO BED
B6194
260 SF
BATH
B6192A
74 SF
BATH
B6194A
55 SF
TWO BED
B6192
277 SF
SUN DECK
B6188
635 SF
SECLUSION
B6134A
102 SF
ANTE RM
B6134
54 SF
TOILET
B6134B
30 SF
TOILET
B6193B
30 SF
SECLUSION
B6193A
102 SF
ANTE RM
B6193
53 SF
NURSE
STATION
B6128
402 SF MEDICATION
B6128A
93 SF
WORK RM
HOUSE
STAFF
B6104
448 SF
STAFF
TOILET
B6125
47 SF
COPY
B6124
71 SF
HAC
B6184A
28 SF
DAY RM
RECREATION
B6184
804 SF
NON-FOOD
STRG
5C139
50 SF
TOILET
5C138
39 SF
TOILET
5C137
39 SF
NURSING
SUPERVISOR
OFFICE
5C150
122 SF
INTERVIEW
CONSULTATION
5C149
123 SF
PSYCHIATRIST
OFFICE
5C148
122 SF
PSYCHIATRIST
OFFICE
5C145
122 SF
PSYCHIATRIST
OFFICE
5C144
122 SF
HEAD
NURSE
5C143
121 SF
TELE
B6184C
37 SF
CORRIDOR
B6C06
162 SF
ONE BED
B6137
178 SF
ELEVATOR
LOBBY
B6EGD
405 SF
CORRIDOR
B6C01
478 SF
ELEC
EQUIP
B6259
52 SF
CORRIDOR
B6C03
646 SF
CORRIDOR
5C-C10
268 SF
SOCIAL
WORK
OFFICE
5C147
115 SF
PSYCHIATRIST
OFFICE
5C146
108 SF
NURSE
CLINICIAN
PHYSICIAN
ASSISTANT
5C142
100 SF
REHABILITATION
THERAPIST
OFFICE
5C141
120 SF
DEMOSTRATION
CLASSROOM
5C158
315 SF
MULTIPURPOSE
OFFICE
5C152
129 SF
TOILET
5C153
38 SF
TOILET
5C154
36 SF
FEMALE
LOCKERS
5C155
67 SF
MALE
LOCKERS
5C156
38 SF
STAFF
LOUNGE
5C157
129 SF
CORRIDOR
5C-C11
189 SF
CORRIDOR
5C-C12
200 SF
CORRIDOR
5C-C9
233 SF
HYDRO
TANK
5C140
19 SF
DINING
5C133A
534 SF
BMS
5C159
102 SF
ELEVATOR
VESTIBULE
5C161
404 SF
LINEN
CHUTE
5C162
28 SF
HAC
5C151
30 SF
CORRIDOR
B6C04
793 SF
CORRIDOR
B6C05
223 SF
CORRIDOR
B6C02
524 SF
SALLY
PORT
B6C02A
94 SF
NOT IN
SCOPE
NOT IN
SCOPE
T R
A V
E L
D
IS
T A
N C
E
5"
T R
A V
E L
D
IS
T A
N C
E
7"
NOTE: THERE ARE NO PROPOSED CHANGES TO ROOM
USE OR LOCATION. EXISTING PATHS OF EGRESS
TRAVEL SHALL REMAIN UNCHANGED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
/12
/20
B
IM
/6
-2
-1
I n p a ti e n t M e n ta l H e a lt h
E O
C C o m p lia n c e
R e n o v a ti o n s /6
-2 -1
.1
.A rc h .r v t
/1
/2
:4
:2
P
M
GI101
LIFE SAFETY PLAN - LEVEL 6
TRIPLE C - The A/E Group
1345 CAPITAL BLVD. SUITE A
RENO, NV 89502
MAT PERKINS
520-481-8548
654-20-117
02/12/2021 MP CJL
BID DOCUMENTS
SUBMITTAL
INPATIENT MENTAL HEALTH EOC
COMPLIANCE RENOVATIONS
975 KIRMAN AVENUE RENO, NV 89502-0993
1/8" = 1'-0" E1
LIFE SAFETY PLAN - LEVEL 6
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
TYPE D
COORDINATE OUTAGES PER SECTION 01 00 00
SOLID ONE HOUR RATED WALLS WILL BE REQUIRED,
HEPA FILTRATION, WALK OFF MATS. PREFABRICATED
SYSTEMS ACCEPTABLE
YES
NOT APPLICABLE - 24/7 INPATIENT UNIT.
YES
NOT IN CONTRACT AREA
WORK AREA IS A 24/7 INPATIENT UNIT ON TOP FLOOR OF
VA MEDICAL CENTER. NURSING UNIT ON FLOOR BELOW
WITH MATCHING PATIENT ROOM LAYOUT.
A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE RENO VA MEDICAL CENTER ICRA
PLAN AND AS DIRECTED BY THE CONTRACTING OFFICER
REPRESENTATIVE (COR).
B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS
PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES
(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD TO
THE CONSTRUCTION SITE SHALL BE POSTED AS PER THE
ISLM PLAN.
C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS
SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER
WORK.
E. CONSTRUCT ANTEROOM AT ENTRANCES TO
CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION
PERSONNEL TO PASS THROUGH THIS ROOM TO BE
VACUUMED WITH HEPA VACUUM CLEANER PRIOR TO
LEAVING THE SITE.
F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL
FOR OCCUPIED AREAS ON THE FLOOR.
G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION
AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,
THROUGHOUT DURATION OF PROJECT USING HEPA
EQUIPPED AIR FILTRATION UNITS.
J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR
OR EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS
AND VISITORS SO THEY DO NOT EXIT THROUGH THE
CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO
THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION
AREA-DO NOT ENTER".
L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND
KEEP A CURRENT HOT WORK PERMIT ON SITE.
M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.
ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS
AND/OR CONTAINERS.
O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM
PIPES AND CONDUITS APPROPRIATELY AND IMMEDIATELY
TO MAINTAIN DUST PROTECTION AND NEGATIVE AIR
PRESSURE.
P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST
MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING
RAGS FOR CLEANING FINE DUST FROM FLOORS AND
ADJACENT OCCUPIED AREAS. ANY DUST TRACKED OUTSIDE
OF CONSTRUCTION AREA SHALL BE CLEANED IMMEDIATELY.
Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION
AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH
DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON
APPROVAL). PATCH OR REPAIR ANY DAMAGE FROM
CONSTRUCTION BARRIER REMOVAL AND REMOVE
ISOLATION OF HVAC SYSTEM.
R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
STEP 1: TYPE C
IDENTIFY THE TYPE OF CONSTRUCTION PROJECT
ACTIVITY (TYPE A–D)
TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.
TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES
THAT CREATE MINIMAL DUST.
TYPE C: WORK THAT GENERATES A MODERATE TO
HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
ASSEMBLIES.
TYPE D: MAJOR DEMOLITION AND CONSTRUCTION
PROJECTS.
STEP 2: MEDIUM RISK
IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE
AFFECTED.
IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,
SELECT THE HIGHER RISK GROUP.
STEP 3: CLASS III
MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,
HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION
PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX,
TO FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR
LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.
STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT
AREA, ASSESSING POTENTIAL IMPACT.
BELOW ABOVE NORTH SOUTH EAST WEST
_______________________RISK GROUP_____________________
LOW LOW N/A N/A N/A N/A
STEP 5:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 6:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 7.
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 8.
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 9.
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 10.
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 11.
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 12.
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS
PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE
(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES
AND AREA.)
STEP 13.
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 14.
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES
WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
C
LA
S S
II
I
DURING CONSTRUCTION
PROJECT
UPON COMPLETION OF
PROJECT
1. Remove or isolate HVAC system in area where work is being done, to prevent contamination of duct system.
2. Complete all critical barriers— i.e., drywall, plywood, plastic—to seal area from non-work area before construction begins. Or, implement control cube method with HEPA-fiItered vacuum for vacuuming prior to exit.
3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.
4. Contain construction waste in tightly covered containers before transport.
5. Cover transport receptacles or carts. Tape down covering unless cart has a solid lid.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA-filtered vacuum.
4. Wet mop area with disinfectant.
5. Upon completion, restore HVAC system where work was performed.
Construction Project Type
Patient Risk Group LOW Risk Group MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
I II II III/IV
I II III IV
I II III/IV IV
II III/IV III/IV IV
TYPE A TYPE B TYPE C TYPE D
YES
COR TO VERIFY STATION CIH APPROVAL
COR TO VERIFY STATION CIH APPROVAL
COR TO VERIFY STATION CIH APPROVAL
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCT
MONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.01 OR GREATER (VERIFY DAILY). IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR CHANGE
NEGATIVE AIR PRE-FILTER.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
O
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
PROVIDE FOR EACH ROOM -
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
F6
GI301
PUBLIC AREA
CONSTRUCTION AREA
VERIFY OUTLET LOCATIONS
AND FUNCTIONALITY.
TEMPORARY WALL
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FIRE RATED PLASTIC TO
PREVENT DUST INSTALL
PRIOR TO CONSTRUCTION
F
IN
IS
H
E D
F
LO
O R
T O
U N
D E
R S
ID
E
O F
S T
R U
C T
U R
E
V E
R
IF
Y F
LO
O
R T
O F
LO
O
R H
E
IG
H T
RENOVATED SPRINKLER
SYSTEM
RECEIVING
B6127B6127
BATH
B6131AB6131A
BATH
B6127AB6127A
TWO BED
B6131B6131
ONE BED
B6135B6135
HAC
B6133B6133
BATH
B6137AB6137A
BATH
B6135AB6135A
ELEC
EQUIP
B6139B6139
GROUP
THERAPY
B6143B6143
ONE BED
B6147B6147
ONE BED
B6149B6149
BATH
B6147AB6147A BATH
B6149AB6149A
ONE BED
B6150B6150
BATH
B6150AB6150A
TWO BED
B6208B6208
QUIET
B6146B6146
TWO BED
B6206B6206
BATH
B6206AB6206A
BATH
B6208AB6208A
WASHER
DRYER
B6205B6205
NOURISH
KITCHEN
B6203B6203
CLEAN
UTILITY
B6201B6201
CLEAN
LINEN
B6199B6199
OFFICE
B6140B6140
TELE
B6142B6142
RED BAG
STORAGE
B6138B6138
SOILED
UTILITY
B6136B6136
LOCKER
ROOM
B6195B6195
TELE
EQUIP
B6197B6197
TWO BED
B6204B6204
TWO BED
B6200B6200
BATH
B6200AB6200A
BATH
B6204AB6204A
STAIR 2
BS2BS2
TWO BED
B6194B6194
BATH
B6192AB6192A
BATH
B6194AB6194A
TWO BED
B6192B6192
SUN DECK
B6188B6188
SECLUSION
B6134AB6134A
ANTE RM
B6134B6134
TOILET
B6134BB6134B
TOILET
B6193BB6193B
SECLUSION
B6193AB6193A ANTE RM
B6193B6193
NURSE
STATION
B6128B6128
MEDICATION
B6128AB6128A
WORK RM
HOUSE
STAFF
B6104B6104
STAFF
TOILET
B6125B6125
COPY
B6124B6124
HAC
B6184AB6184A
DAY RM
RECREATION
B6184B6184
NON-FOOD
STRG
5C1395C139
TOILET
5C1385C138
TOILET
5C1375C137
NURSING
SUPERVISOR
OFFICE
5C1505C150
INTERVIEW
CONSULTATION
5C1495C149
PSYCHIATRIST
OFFICE
5C1485C148
PSYCHIATRIST
OFFICE
5C1455C145
PSYCHIATRIST
OFFICE
5C1445C144
HEAD
NURSE
5C1435C143
TELE
B6184CB6184C
CORRIDOR
B6C06B6C06
ONE BED
B6137B6137
ELEVATOR
LOBBY
B6EGDB6EGD
CORRIDOR
B6C01B6C01
ELEC
EQUIP
B6259B6259
CORRIDOR
B6C03B6C03
CORRIDOR
5C-C105C-C10
SOCIAL
WORK
OFFICE
5C1475C147
PSYCHIATRIST
OFFICE
5C1465C146
NURSE
CLINICIAN
PHYSICIAN
ASSISTANT
5C1425C142
REHABILITATION
THERAPIST
OFFICE
5C1415C141
DEMOSTRATION
CLASSROOM
5C1585C158
MULTIPURPOSE
OFFICE
5C1525C152
TOILET
5C1535C153
TOILET
5C1545C154
FEMALE
LOCKERS
5C1555C155
MALE
LOCKERS
5C1565C156
STAFF
LOUNGE
5C1575C157
CORRIDOR
5C-C115C-C11
CORRIDOR
5C-C125C-C12
CORRIDOR
5C-C95C-C9
HYDRO
TANK
5C1405C140
DINING
5C133A5C133A
BMS
5C1595C159
ELEVATOR
VESTIBULE
5C1615C161
LINEN
CHUTE
5C1625C162
HAC
5C1515C151
CORRIDOR
B6C04B6C04
CORRIDOR
B6C05B6C05
CORRIDOR
B6C02B6C02
SALLY
PORT
B6C02AB6C02A
NOT IN
SCOPE
NOT IN
SCOPE
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
PHASE 7
PHASE 8
PHASE 9
PHASE 1 PHASE 2
P H
A S
E
P H
A S
E
PHASE 5PHASE 6
PHASE 7
PHASE 9
PHASE 8A
PHASE 8B
NOTE: TEMPORARY BARRIERS AND ANTE-ROOMS NOT SHOWN ON THIS SHEET FOR CLARITY,
SEE GI302 FOR ENLARGED PHASING AND ICRA PLANS.
CONTRACTOR SHALL ENSURE THAT ACCESS TO BOTH MEANS OF EGRESS (STAIR 1 AND STAIR 2)
ARE ACCESSIBLE FROM OCCUPIED SPACES AT ALL TIME. IN CASES WHERE AN ENTIRE
CORRIDOR WIDTH NEEDS TO BE TEMPORARILY BARRICADED (E.G. PHASE 2 & PHASE 7),
MAINTAIN AT LEAST ONE PATHWAY TO BOTH EXITS, AND USE TEMPORARY SIGNAGE TO CLEARLY
DIRECT OCCUPANTS.FOR EACH PHASE, CONTRACTOR SHALL PREPARE INTERIM LIFE SAFETY
MEASURE (ILSM) PLANS TO COORDINATE CHANGES TO PATHWAYS TO EGRESS, TEMPORARY
BARRIERS AND SIGNAGE, ETC. ALL ILSM PLANS, INCLUDING TEMPORARY BARRIERS AND
SIGNAGE, TO BE REVIEWED AND APPROVED BY COR AND MEDICAL TEAM PRIOR TO
INSTALLATION.
CONTRACTOR SHALL ENSURE ALL SURFACES ARE PROTECTED AT STAGING/ STORAGE AREA
LOCATION. CONTRACTOR TO REPLACE ANY DAMAGED ITEMS IN STAGING/ STORAGE ARE
INCURRED DURING CONSTRUCTION.
STAIR 1
BS1BS1
SEE GI302 FOR ENLARGED
PHASING & ICRA PLANS
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
TO BE USED FOR CONTRACTOR
STORAGE - COORDINATE WITH COR
BED
STORAGE
B6EGE
531 SF
SECONDARY ROUTE TO SILVER ELEVATOR:
CONTRACTOR TO COORDINATE WITH COR
AT TIME OF CONSTRUCTION FOR ELEVATOR
USAGE/ACCESS
DEDUCT #1
PHASE 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
/12
/20
B
IM
/6
-2
-1
I n p a ti e n t M e n ta l H e a lt h
E O
C C o m p lia n c e
R e n o v a ti o n s /6
-2 -1
.1
.A rc h .r v t
/1
/2
:4
:3
P
M
GI301
INFECTION CONTROL PLAN & PHASING - LEVEL 6
TRIPLE C - The A/E Group
1345 CAPITAL BLVD. SUITE A
RENO, NV 89502
MAT PERKINS
520-481-8548
654-20-117
02/12/2021 MP CJL
BID DOCUMENTS
SUBMITTAL
INPATIENT MENTAL HEALTH EOC
COMPLIANCE RENOVATIONS
975 KIRMAN AVENUE RENO, NV 89502-0993
1/4" = 1'-0" F8
TYPICAL CONSTRUCTION LAYOUT- CLASS III1/2" = 1'-0"
F6
CROSS SECTION A'-A'- CLASS IV
1/8" = 1'-0" E1
OVERALL PHASING AND ICRA PLAN - LEVEL 6
PHASE 1:
PHASING NOTES:
DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOMS
B6135 AND B6137, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO
THE START OF PHASE 2.
GENERAL:
THIS FACILITY WILL BE IN OPERATION FOR THE ENTIRETY OF
THE PROJECT'S CONSTRUCTION, AND IS A 24/7 FACILITY. ALL
WORK SHALL BE COORDINATED TO MINIMIZE INTERRUPTIONS
TO OPERATIONS AND WORKFLOW. ALL DOORS MUST BE KEPT
OPERATIONAL AT ALL TIMES. DO NOT BLOCK ANY DOORS
FROM FULLY OPENING OR CLOSING.
PHASE 2:
DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOM
B6147, INCLUDING THE RESTROOM CORE. ACCEPTANCE AND
TURNOVER TO BE COMPLETED PRIOR TO THE START OF
PHASE 3.
PHASE 3: (DEDUCT #1)
DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOMS
B6149 AND B6150, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO
THE START OF PHASE 4.
PHASE 4:
DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS
B6208 AND B6206, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO
THE START OF PHASE 5.
PHASE 5:
DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS
B6200 AND B6204, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO THE
START OF PHASE 6.
PHASE 6:
DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS
B6192 AND B194, INCLUDING THE RESTROOM CORE.
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO THE
START OF PHASE 7.
PHASE 7:
DEMOLITION AND RENOVATION OF NURSES STATION AND
ADJACENT CORRIDOR. ACCEPTANCE AND TURNOVER TO BE
COMPLETED PRIOR TO THE START OF PHASE 8.
PHASE 8:
A: - RENOVATE RECEIVING AND TWO-BED RESIDENT ROOM
B6127 & B6131.
B: INSTALL NEW INTERIOR WINDOWS AT STAFF WORK ROOM
(B6104).
ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO
START OF PHASE 9.
PHASE 9: (DEDUCT #2 FLOORING ONLY)
INSTALL NEW INTERIOR WINDOWS AT SUN DECK EXTERIOR.
REMOVE AND REPLACE GLAZING AT DINING ROOM /
RECREATION ROOM INTERIOR WINDOW WALLS. REPLACE SINK
FIXTURES IN ANTE ROOM TOILETS. REMOVE AND REPLACE
HANDRAILS, DOORS, LIGHT FIXTURES, GRILLES, SIGNAGE, ETC.
IN REMAINDER OF PROJECT AREA. INSTALL CORRIDOR
FLOORING. COMPLETE ALL OTHER OUTSTANDING WORK.
PHASING LEGEND
ONE BED
B6135
220 SF
HAC
B6133
38 SF
BATH
B6137A
53 SF
BATH
B6135A
57 SF
ELEC
EQUIP
B6139
43 SF
ONE BED
B6137
178 SF
C
LE
A R
4' -0
PHASE 1
ANGLE ICRA BARRIER SIDE WALLS
TO MITIGATE BLIND SPOTS IN HALLWAY
ONE BED
B6147
179 SF
BATH
B6147A
41 SF
PHASE 2
ANGLE ICRA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .