654-20-117 Mental Health EOC_Part2.pdf

PDF 11 MB Posted

Attached to
Y1DA--Mental Health EOC Compliance Federal contract opportunity
Solicitation number
36C26121R0072
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

This federal contract opportunity notice seeks compliance with mental health Emergency Operations Center standards and renovations to inpatient mental health doors and door frames.

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 issued solicitation number 36C26121R0072 to obtain compliance with Project 654-20-141 for inpatient mental health Emergency Operations Center standards and Project 654-17-713 for inpatient mental health door frames and doors. Interested parties should respond with proposals by the solicitation response date to provide Emergency Operations Center compliance services and replace or renovate inpatient mental health doors and door frames for multiple VA medical centers within Veterans Integrated Service Network 21. The contract is set to be awarded by the anticipated award date to the selected vendor.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

/12

/20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h

E O

C C o m p lia n c e

R e n o v a ti o n s /6

-2 -1

.1

.A rc h .r v t

/1

/2

:4

:1

P

M

GI050

GENERAL NOTES

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NV 89502

MAT PERKINS

520-481-8548

654-20-117

02/12/2021 MP CJL

BID DOCUMENTS

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR

THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL

AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING

SPECIFICATION MANUAL FOR NEW WORK AND THE MPI

MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR

REPAINTING WORK. REFER TO SPECIFICATION SECTION

"09 91 00 - PAINTING" FOR ADDITIONAL INFORMATION.

2. PAINTING WORK: INCLUDES TAPING, SURFACE

PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD

PAINTING AND FINISHING AS REQUIRED BY STANDARD

PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED

COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP

PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK

ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF

OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS

MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT

NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND

FACTORY PRIMING.

3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED

OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR

AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES,

WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW

ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED

TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL

AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND

PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE

SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT

RECOMMENDED BY MANUFACTURER. PAINTING SCOPE

ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS,

SPECIFICATIONS AND PAINTING GENERAL NOTES. THESE

SOURCES ARE COMPLEMENTARY, NOT MUTUALLY

EXCLUSIVE.

4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD

PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,

DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND

PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED

AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL

WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF

ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND

MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED

OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF

PIPING FOR MECHANICAL AND PLUMBING WORK IS

COVERED IN THE MECHANICAL OR PLUMBING

SPECIFICATIONS.

5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT

AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE

OF PAINT COLOR. COMPLETED PAINTING SHALL NOT

IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS

WINDOWS, DRAWERS, HINGES, DOORS, ETC.

6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE

REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND

COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA

ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OR IF

TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE

ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING

EDGES OR CORNERS.

7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT

PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR

INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE

INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC

MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND

EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL

EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,

LIGHTING FIXTURES, SWITCHGEAR, MOTORS,

DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR

SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO

PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES

LISTED IN SECTION 01 33 23.

8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE

INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED

ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,

COPPER, BRASS, BRONZE AND SIMILAR FINISHED

MATERIALS.

9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,

DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS

IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,

INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE

SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL

CONCRETE IN PIPE SPACE.

10. OPERATING PARTS AND SENSING DEVICES: UNLESS

OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF

OPERATING UNITS SUCH AS VALVES, DAMPER

OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT

SENSING OR EMITTING DEVICES THAT MIGHT NOT

FUNCTION PROPERLY IF PAINTED.

11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-

REQUIRED LABELS.

12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT

COMPLETION OF WORK.

13. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,

REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE

ALL EXISTING AND CONTRACTOR-CAUSED HOLES, CRACKS,

AND OTHER IMPERFECTIONS FILLED WITH APPROVED

PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH

ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE

OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR

PATCHING REQUIREMENTS.

14. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT

MATERIALS AND FINISHES. APPLY THE APPROPRIATE

SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL

NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-

BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL

BASE PAINT).

GENERAL PAINTING NOTES:

1. SEE SPECIFICATION SECTION 07 92 00 "JOINT SEALANTS"

FOR ADDITIONAL INFORMATION.

2. THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO

FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR

BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR

WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED

WITH SEALANTS. SEALANT IS ALSO USED TO ENSURE

MATERIALS CANNOT BE EASILY REMOVED BY HAND. USE A

HIGH-STRENGTH ADHESIVE TO FACILITATE THIS.

3. THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO

ENHANCE APPEARANCE AND FINISH AT INTERIOR

APPLICATIONS AND IN SOME SITUATIONS TO REDUCE

AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE

EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER

PENETRATIONS (FIRE CAULKING) AND TO DECREASE

SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.

OTHER USES MAY BE NOTED IN THE SPECIFICATIONS

AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS

ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING

SHOULD BE USED, FOLLOW PROCEDURES LISTED IN

SECTION 01 33 23.

4. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL

AROUND BOTH SIDES OF DOOR FRAMES.

5. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL

AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES

AND EXPOSED SUPPORTS.

6. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS

BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,

CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL

TO P-LAM, ETC).

7. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL

GAPS OR 1/16TH INCH OR MORE.

8. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS

THROUGH, FLOORS AND WALLS.

9. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND

CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE

SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A

BED OF SEALANT.

10. USE SPECIFIED CAULK OR SEALANT AROUND

PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH

AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE

ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,

LIGHTING, VENTS, ETC.

GENERAL SEALANT / CAULKING

NOTES:

PHASE 1:

PHASING NOTES:

DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOMS

B6135 AND B6137, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO

THE START OF PHASE 2.

GENERAL:

THIS FACILITY WILL BE IN OPERATION FOR THE ENTIRETY OF

THE PROJECT'S CONSTRUCTION, AND IS A 24/7 FACILITY. ALL

WORK SHALL BE COORDINATED TO MINIMIZE INTERRUPTIONS

TO OPERATIONS AND WORKFLOW. ALL DOORS MUST BE KEPT

OPERATIONAL AT ALL TIMES. DO NOT BLOCK ANY DOORS

FROM FULLY OPENING OR CLOSING.

PHASE 2:

DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOM

B6147, INCLUDING THE RESTROOM CORE. ACCEPTANCE AND

TURNOVER TO BE COMPLETED PRIOR TO THE START OF

PHASE 3.

PHASE 3: (DEDUCT #1)

DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOMS

B6149 AND B6150, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO

THE START OF PHASE 4.

PHASE 4:

DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS

B6208 AND B6206, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO

THE START OF PHASE 5.

PHASE 5:

DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS

B6200 AND B6204, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO THE

START OF PHASE 6.

PHASE 6:

DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS

B6192 AND B194, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO THE

START OF PHASE 7.

PHASE 7:

DEMOLITION AND RENOVATION OF NURSES STATION AND

ADJACENT CORRIDOR. ACCEPTANCE AND TURNOVER TO BE

COMPLETED PRIOR TO THE START OF PHASE 8.

PHASE 8:

A: - RENOVATE RECEIVING AND TWO-BED RESIDENT ROOM

B6127 & B6131.

B: INSTALL NEW INTERIOR WINDOWS AT STAFF WORK ROOM

(B6104).

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO

START OF PHASE 9.

PHASE 9: (DEDUCT #2 FLOORING ONLY)

INSTALL NEW INTERIOR WINDOWS AT SUN DECK EXTERIOR.

REMOVE AND REPLACE GLAZING AT DINING ROOM /

RECREATION ROOM INTERIOR WINDOW WALLS. REPLACE SINK

FIXTURES IN ANTE ROOM TOILETS. REMOVE AND REPLACE

HANDRAILS, DOORS, LIGHT FIXTURES, GRILLES, SIGNAGE, ETC.

IN REMAINDER OF PROJECT AREA. INSTALL CORRIDOR

FLOORING. COMPLETE ALL OTHER OUTSTANDING WORK.

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS. SEE

SPECIFICATION SECTION 01 00 00 - "GENERAL

REQUIREMENTS" FOR ADDITIONAL INFORMATION.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND

REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK

MUST BE INSPECTED AND APPROVED BY LOCAL

AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE

VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION

AND CONSTRUCTION. IF INCONSISTENCIES,

CONTRADICTIONS OR OMISSIONS ARE DISCOVERED

FOLLOW PROCEDURES LISTED IN SECTION 01 33 23.

4. GENERAL CONTRACTOR SHALL COORDINATE ALL

MECHANICAL AND ELECTRICAL DUCT SIZES AND

LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT

THE USE OF A KEY OR SPECIAL KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE

INSTALLED LEVEL WITH EACH OTHER AND PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE

GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED

TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE

FULL SCOPE OF WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE

FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS

REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN

SECTION 01 33 23.

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING

CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT

ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE

CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO

ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING

WORK RELATED TO ANY DISCREPANCIES. SEE

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,

SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT

BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION

PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO

HAVE ELECTED THE MORE COSTLY TIME, METHOD,

SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS

AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE

CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK

INDICATED AS NIC.

12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS

WITH COR, INCLUDING STAGING AREAS, MATERIAL

STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY

OPERATIONS, INTERRUPTION OF UTILITIES. SEE

SPECIFICATIONS.

13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE

THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE

ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR

FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO

COORDINATE PENETRATIONS THROUGH FOUNDATIONS,

FLOORS, WALLS AND CEILING SPACES. SEE

SPECIFICATIONS.

14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN

DISSIMILAR METALS. SEE SPECIFICATIONS.

15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY

SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL

SURFACE ATTACHED METAL SHALL BE SEPARATED FROM

CONCRETE OR MASONRY BY NON-METALLIC MATERIAL

SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL

AS APPROVED BY ARCHITECT AND COR.

16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL

EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING

OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,

MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL

ELEVATION COORDINATION.

17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK

PERMITS TO BE COORDINATED WITH COR. SUBMIT

CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.

18. ANTI-LIGATURE REQUIREMENT: CONTRACTOR SHALL

VERIFY THAT ALL IMPROVEMENTS, SHOP SUBMITTAL

INFORMATION, AND INSTALLATIONS MEET THE ANTI-

LIGATURE REQUIREMENTS OF THIS PROJECT PRIOR TO

INSPECTION AND TURNOVER.

GENERAL NOTES: GENERAL FIRE & LIFE SAFETY

NOTES:

FIRE ALARM

1. ANY MODIFICATIONS TO THE EXISTING FIRE ALARM

SYSTEM SHALL BE IN ACCORDANCE WITH CLASS "a"

PROTECTION OF NFPA 101 LIFE SAFETY CODE.

2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES; AND SECTION 28 31 00 FIRE

DETECTION AND ALARM FOR APPROVAL PRIOR TO THE

INSTALLATION.

3. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN

PLACE AND IN USE. IF ANY MODIFICATIONS TO THE

SYSTEM ARE REQUIRED, THE CONSTRUCTION

CONTRACTOR MUST EITHER HIRE THE CURRENT FIRE

ALARM MAINTENANCE CONTRACTOR TO PERFORM ALL

WORK OR IF THE WORK IS COMPLETED BY ANOTHER FIRE

ALARM CONTRACTOR, THE CONSTRUCTION CONTRACTOR

MUST HIRE THE CURRENT FIRE ALARM MAINTENANCE

CONTRACTOR TO FULLY INSPECT, TEST, AND CERTIFY THE

WORK DONE BY ANOTHER CONTRACTOR.

4. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA

THAT IS BEING REMODELED, AT THE CONCLUSION OF THE

WORK, THE FIRE ALARM CONTRACTOR IS TO TEST ALL

FIRE ALARM DEVICES WITHIN THE AREA OF THE REMODEL

AREA WHETHER OR NOT THEY WERE MODIFIED AS PART

OF THE PROJECT.

FIRE EXTINGUISHERS

1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE

WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND

SHALL MAINTAIN THEM DURING THE COURSE OF

CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.

CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C

FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND

SHALL BE DRY CHEMICAL TYPE.

EXIT & EMERGENCY LIGHTING

1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING

TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT

REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR

INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;

CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A

SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE

WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY

LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE

POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE

DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2"

BELOW THE THRESHOLD.

2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH

THE LOCAL AND CURRENT NEC GUIDELINES.

FIRE SPRINKLER SYSTEM

1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES

TO BE RETAINED AND REUSED. CONTRACTOR TO VERIFY

THE EXACT SIZE AND LOCATION IN FIELD.

2. RE-USE EXISTING WHERE MODIFIED, OR PROVIDE NEW IF

EXISTING ARE UNUSABLE. ALL WORK TO BE INSTALLED IN

ACCORDANCE WITH 2019 NFPA 13. SEE FIRE PROTECTION

PLANS.

3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD

PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.

4. WHENEVER EXISTING FIRE SPRINKLER PIPING IS

REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO

ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE

WRITTEN OBSTRUCTION DOCUMENTATION IN

ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.

FIRE STOPPING

1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE

STOPPING.

GENERAL

1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE

OR FLAME-PROOFED IN AN APPROVED MANNER.

2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS

LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF

NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF

NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE

INSTALLATION, INCLUDING INSULATION, FACING

MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.

3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-

CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS

SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25

AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED

IN ACCORDANCE WITH ASTM E 84.

4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE

CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR.

LATCHING AND LOCKING DOORS THAT ARE HAND-

ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL

BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE

HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT

REQUIRING THE ABILITY TO GRASP THE OPENING

HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS

ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT

FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM

AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE

AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE

LATCH, MEASURED FROM THE LEADING EDGE OF THE

DOOR.

5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT

EXCEED:

A. INTERIOR DOORS - 5 lbs.

B. EXTERIOR DOORS - 8.5 lbs.

C. FIRE DOORS - 15 lbs.

6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR

PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A

UL APPROVED METHOD AND MATERIAL.

FIRE & SMOKE DAMPERS

1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED

AND REUSED. UPON COMPLETION OF PROJECT, RE-TEST

AND RECERTIFY FIRE & SMOKER DAMPERS, PROVIDE

DOCUMENTATION TO COR.

2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.

THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND

FIRE ALARM SYSTEM.

1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO

COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES

AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE

ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF

DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,

FOLLOW PROCEDURES LISTED IN SECTION 01 33 23. IF

DISCREPANCIES ARE DISCOVERED AFTER THE BID,

FOLLOW PROCEDURES LISTED IN SECTION 01 33 23 PRIOR

TO CONSTRUCTION OF THE AFFECTED AREA.

2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL

AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED

BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND

SHOP DRAWINGS CONTRACTOR SHALL VERIFY

DIMENSIONS AND RECOMMEND DIMENSIONAL

MODIFICATIONS AS REQUIRED.

3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR

PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,

SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR

ELEVATIONS AND EXTERIOR ELEVATIONS.

4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON

STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.

MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES

MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED

TO EQUIPMENT SIZES AND CLEARANCES.

5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X

4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT

NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT

ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT

BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.

(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE

SHOWN IN THE 16THS OF AN INCH, BUT STANDARD

MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").

6. FLOOR PLAN DIMENSIONS

A. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE

TO ONE FACE OF THE STUDS, BOTH FACES OF

MASONRY WALLS, OR BOTH FACES OF CONCRETE

WALLS, ETC, UNLESS NOTED OTHERWISE.

B. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL

(UNLESS NOTED AS "NOM").

C. DOOR OPENING DIMENSIONS IN FRAME

CONSTRUCTION (WOOD OR STEEL STUDS) ARE

TYPICALLY SHOWN AT THEIR CENTERLINES.

HOWEVER, WHEN THE EDGE OF THE DOOR IS

IMPORTANT, OR MAKES THE PLACEMENT CLEARER,

THE DIMENSION MAY BE TO THE ACTUAL FRAME

EDGE.

D. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS

TO ADJACENT WALLS: BETWEEN FRAME FACES

AND FACES OF STUDS, OR FACES OF MASONRY OR

CONCRETE, AT NEARBY PERPENDICULAR WALLS

ARE TYPICALLY 4", DEPENDING ON HARDWARE

CLEARANCES AND FRAME REQUIREMENTS (2.5"-

DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=

4.0")

E. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH

AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR

PREFABRICATED STAIR ENCLOSURES, ARE NOTED

"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES

OF FINISHES.

F. DIMENSIONS DESIGNATED WITH "MIN" INDICATE

THE MINIMUM CLEARANCE OR SEPARATION

REQUIRED.

7. VERTICAL DIMENSIONS

A. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON

ARCHITECTURAL DRAWINGS ARE TO TOP OF

DECKING OR SHEATING, BUT DO NOT INCLUDE

FINISHES OR ROOFING MATERIAL.

B. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE

TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-

BEARING MASONRY OR CONCRETE WALLS, WHERE

THEY ARE TO ROUGH OPENINGS). HEIGHT

REFERENCES SHOULD BE TO THE NEXT LOWER

FINISH FLOOR ELEVATION

C. LIGHTING HEIGHTS ON WALLS ARE TO

CENTERLINES OF THE ELECTRICAL BOXES, UNO.

EQUIPMENT, VENT, PLUMBING AND FIXTURE

ELEVATIONS ARE TO CENTERLINES OF THE WALL

PENETRATIONS, UNO.

D. SOME VERTICAL DIMENSIONS ARE SHOWN ON

PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND

ELEVATION CHANGES. A PLAN ELEVATION CHANGE

SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND

INDICATES THE + OR - ELEVATION CHANGE IN

INCHES FROM THE FINISHED FLOOR ELEVATION

(FFE) NEXT TO IT.

GENERAL DIMENSIONING

NOTES:

1. HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION

TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF

DEMOLITION.

2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO

MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION

WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF

ALL ITEMS PER SPECIFICATIONS. THE COR RESERVES THE RIGHT

TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL

BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK

THROUGH.

4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS

OR PENETRATIONS LEFT BY THE INSTALLATION OR

CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO

MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR ROOF

ASSEMBLY.

5. IF THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY

OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION

ACTIVITIES; TEMPORARY BARRICADES PERTAINING TO THE

CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT

POSSIBLE INJURY IN AND AROUND DEMOLITION AND

CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA

REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA AND

PUBLIC ACCESS WITH COR PRIOR TO CONSTRUCTION. PROTECT

SIGNAGE WITHIN PROJECT AREA.

6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND

DEMOLITION FOR RELATED DEMOLITION WORK.

7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED UTILITY &

DEMOLITION WORK AND PROJECT PHASING NOTES. COORDINATE

UTILITY SYSTEM SHUTDOWNS WITH COR.

GENERAL DEMOLITION AND

PHASING NOTES:

A. SEE SPECIFICATION SECTIONS 01 35 26 - "SAFETY

REQUIREMENTS" AND 01 58 16 "TEMPORARY INTERIOR

SIGNAGE" FOR ADDITIONAL INFORMATION.

B. SEE SHEETS GI101, GI301 & GI302 FOR ADDITIONAL LIFE

SAFETY AND ICRA INFORMATION AND REQUIREMENTS.

C. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE RENO VA MEDICAL CENTER

ICRA PLAN AND AS DIRECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE (COR).

D. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS

PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES

(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD TO

THE CONSTRUCTION SITE SHALL BE POSTED AS PER THE

ISLM PLAN.

E. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

F. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS

SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER

WORK.

G. CONSTRUCT ANTEROOM AT ENTRANCES TO

CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION

PERSONNEL TO PASS THROUGH THIS ROOM TO BE

VACUUMED WITH HEPA VACUUM CLEANER PRIOR TO

LEAVING THE SITE.

H. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL

FOR OCCUPIED AREAS ON THE FLOOR.

I. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

J. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

K. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION

AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,

THROUGHOUT DURATION OF PROJECT USING HEPA

EQUIPPED AIR FILTRATION UNITS.

L. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR

OR EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN

CONSTRUCTION AREA TO PREVENT CONTAMINATION OF

EXISTING DUCT SYSTEM.

M. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS

AND VISITORS SO THEY DO NOT EXIT THROUGH THE

CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO

THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION

AREA-DO NOT ENTER".

N. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND

KEEP A CURRENT HOT WORK PERMIT ON SITE.

O. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO

MAKE SURE THEY REMAIN EFFECTIVE.

P. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.

ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS

AND/OR CONTAINERS.

Q. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM

PIPES AND CONDUITS APPROPRIATELY AND IMMEDIATELY

TO MAINTAIN DUST PROTECTION AND NEGATIVE AIR

PRESSURE.

R. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST

MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING

RAGS FOR CLEANING FINE DUST FROM FLOORS AND

ADJACENT OCCUPIED AREAS. ANY DUST TRACKED

OUTSIDE OF CONSTRUCTION AREA SHALL BE CLEANED

IMMEDIATELY.

S. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION

AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH

DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON

APPROVAL). PATCH OR REPAIR ANY DAMAGE FROM

CONSTRUCTION BARRIER REMOVAL AND REMOVE

ISOLATION OF HVAC SYSTEM.

T. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

EACH PHASE IS COMPLETED AND INSPECTED BY VA

SAFETY PERSONNEL, INFECTION CONTROL GROUP, AND

COR.

U. CONTRACTOR SHALL ENSURE THAT ACCESS TO BOTH

MEANS OF EGRESS (STAIR 1 AND STAIR 2) ARE ACCESSIBLE

FROM OCCUPIED SPACES AT ALL TIME. IN CASES WHERE

AN ENTIRE CORRIDOR WIDTH NEEDS TO BE TEMPORARILY

BARRICADED (E.G. PHASE 2 & PHASE 7), MAINTAIN AT

LEAST ONE PATHWAY TO BOTH EXITS, AND USE

TEMPORARY SIGNAGE TO CLEARLY DIRECT

OCCUPANTS.FOR EACH PHASE, CONTRACTOR SHALL

PREPARE INTERIM LIFE SAFETY MEASURE (ILSM) PLANS TO

COORDINATE CHANGES TO PATHWAYS TO EGRESS,

TEMPORARY BARRIERS AND SIGNAGE, ETC. ALL ILSM

PLANS, INCLUDING TEMPORARY BARRIERS AND SIGNAGE,

TO BE REVIEWED AND APPROVED BY COR AND MEDICAL

TEAM PRIOR TO INSTALLATION.

GENERAL ICRA AND LIFE-

SAFETY NOTES:

Revisions: Date:

LIFE SAFETY SYMBOLS

XX PATH OF TRAVEL

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

APPLICABLE BUILDING CODES

• 2018 NFPA 101 LIFE SAFETY CODE & 2016 NFPA 72

NATIONAL FIRE ALARM AND SIGNALING CODE & 2016 NFPA

13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS.

EXCEPTION OF NFPA 5000 AND NFPA 900

• 2018 INTERNATIONAL MECHANICAL CODE (IPC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2017 NATIONAL ELECTRICAL CODE (NEC)

• 2018 INTERNATIONAL PLUMBING CODE (IPC)

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY

STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,

BARRIER FREE DESIGN GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND

RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF

STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00

00 AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2016; MEDICAL SPACES - ASHRAE

170-2013, NON-MEDICAL SPACES - ASHRAE 62.1-2016

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS –

ASHRAE STANDARD 15–2013

• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE

DIRECTED BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF

APPLICABLE STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

• VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION (2015)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4 TYPE OF BUILDING REHABILITATION: Minor Rehabilitation, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA

101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT

SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS

STORAGE 1 HOURS

CLASSIFICATION OF OCCUPANCY:

EXISTING: HEALTH CARE Occupancy per Chapter 19

MIXED BUILDING OCCUPANCY TYPE:

PRIMARY - HEALTHCARE

6.1.5.1 Health Care Occupancy. An occupancy used to provide medical or other treatment or care simultaneously to four or more patients on an inpatient basis, where such patients are mostly incapable of self-preservation due to age, physical or mental disability, or because of security measures not under the occupants' control.

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantilre, BUSINESS, industrial, or storage use

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or stucture, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

19.2.6.2.1 The travel distance between any point in a room and an exit shall not exceed 150 ft.

19.2.6.2.2 The maximum travel distance...shall be permitted to be increased by 50 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

HEALTH CARE OCCUPANCY; PROTECTED = 200'-0"

OCCUPANT LOAD:

19.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

CALCULATED OCCUPANT LOADS

Total Floor Area - 19,849 SF (no change) Occupancy - Healthcare, sleeping departments (no change) Occupancy Factor - 120 SF per Occupant, Gross Total Occupant Count - 166 Occupants (no change)

MEANS OF EGRESS:

19.2.3 Capacity of Means of Egress.

19.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

19.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 44 in. (1120 mm).

19.2.4 Number of Means of Egress.

19.2.4.3 Not less than two exits of the types described in 19.2.2 shall be accessible from each smoke compartment.

19.2.4.4 Egress from smoke compartments addressed in 19.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.

19.2.5.2 Dead End Corridors. Existing dead-end corridors exceeding 30 feet shall be permitted to continue in use if it is impratical and unfeasible to alter them.

PROTECTION OF VERTICAL OPENINGS:

18/19.3.1 Protection of Vertical Openings.

18/19.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

19.3.2 Protection from Hazards.

19.3.2.1 Hazardous Areas

19.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 19.3.2.1.2 and 19.3.2.1.3 shall be protected as indicated.

19.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7.1:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material 18.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.

18.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

18.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

RECEIVING

B6127

207 SF

BATH

B6131A

81 SF

BATH

B6127A

58 SF

TWO BED

B6131

272 SF

ONE BED

B6135

220 SF

HAC

B6133

38 SF

BATH

B6137A

53 SF

BATH

B6135A

57 SF

ELEC

EQUIP

B6139

43 SF

GROUP

THERAPY

B6143

460 SF

ONE BED

B6147

179 SF

ONE BED

B6149

192 SF

BATH

B6147A

41 SF

BATH

B6149A

69 SF

ONE BED

B6150

198 SF

BATH

B6150A

38 SF

TWO BED

B6208

270 SF

QUIET

B6146

276 SF

TWO BED

B6206

268 SF

BATH

B6206A

56 SF

BATH

B6208A

56 SF

WASHER

DRYER

B6205

80 SF

NOURISH

KITCHEN

B6203

75 SF

CLEAN

UTILITY

B6201

120 SF

CLEAN

LINEN

B6199

61 SF

OFFICE

B6140

135 SF

TELE

B6142

51 SF

RED BAG

STORAGE

B6138

64 SF

SOILED

UTILITY

B6136

93 SF

LOCKER

ROOM

B6195

84 SF

TELE

EQUIP

B6197

64 SF

TWO BED

B6204

262 SF

TWO BED

B6200

270 SF

BATH

B6200A

59 SF

BATH

B6204A

59 SF

STAIR 2

BS2

193 SF

TWO BED

B6194

260 SF

BATH

B6192A

74 SF

BATH

B6194A

55 SF

TWO BED

B6192

277 SF

SUN DECK

B6188

635 SF

SECLUSION

B6134A

102 SF

ANTE RM

B6134

54 SF

TOILET

B6134B

30 SF

TOILET

B6193B

30 SF

SECLUSION

B6193A

102 SF

ANTE RM

B6193

53 SF

NURSE

STATION

B6128

402 SF MEDICATION

B6128A

93 SF

WORK RM

HOUSE

STAFF

B6104

448 SF

STAFF

TOILET

B6125

47 SF

COPY

B6124

71 SF

HAC

B6184A

28 SF

DAY RM

RECREATION

B6184

804 SF

NON-FOOD

STRG

5C139

50 SF

TOILET

5C138

39 SF

TOILET

5C137

39 SF

NURSING

SUPERVISOR

OFFICE

5C150

122 SF

INTERVIEW

CONSULTATION

5C149

123 SF

PSYCHIATRIST

OFFICE

5C148

122 SF

PSYCHIATRIST

OFFICE

5C145

122 SF

PSYCHIATRIST

OFFICE

5C144

122 SF

HEAD

NURSE

5C143

121 SF

TELE

B6184C

37 SF

CORRIDOR

B6C06

162 SF

ONE BED

B6137

178 SF

ELEVATOR

LOBBY

B6EGD

405 SF

CORRIDOR

B6C01

478 SF

ELEC

EQUIP

B6259

52 SF

CORRIDOR

B6C03

646 SF

CORRIDOR

5C-C10

268 SF

SOCIAL

WORK

OFFICE

5C147

115 SF

PSYCHIATRIST

OFFICE

5C146

108 SF

NURSE

CLINICIAN

PHYSICIAN

ASSISTANT

5C142

100 SF

REHABILITATION

THERAPIST

OFFICE

5C141

120 SF

DEMOSTRATION

CLASSROOM

5C158

315 SF

MULTIPURPOSE

OFFICE

5C152

129 SF

TOILET

5C153

38 SF

TOILET

5C154

36 SF

FEMALE

LOCKERS

5C155

67 SF

MALE

LOCKERS

5C156

38 SF

STAFF

LOUNGE

5C157

129 SF

CORRIDOR

5C-C11

189 SF

CORRIDOR

5C-C12

200 SF

CORRIDOR

5C-C9

233 SF

HYDRO

TANK

5C140

19 SF

DINING

5C133A

534 SF

BMS

5C159

102 SF

ELEVATOR

VESTIBULE

5C161

404 SF

LINEN

CHUTE

5C162

28 SF

HAC

5C151

30 SF

CORRIDOR

B6C04

793 SF

CORRIDOR

B6C05

223 SF

CORRIDOR

B6C02

524 SF

SALLY

PORT

B6C02A

94 SF

NOT IN

SCOPE

NOT IN

SCOPE

T R

A V

E L

D

IS

T A

N C

E

5"

T R

A V

E L

D

IS

T A

N C

E

7"

NOTE: THERE ARE NO PROPOSED CHANGES TO ROOM

USE OR LOCATION. EXISTING PATHS OF EGRESS

TRAVEL SHALL REMAIN UNCHANGED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

/12

/20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h

E O

C C o m p lia n c e

R e n o v a ti o n s /6

-2 -1

.1

.A rc h .r v t

/1

/2

:4

:2

P

M

GI101

LIFE SAFETY PLAN - LEVEL 6

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NV 89502

MAT PERKINS

520-481-8548

654-20-117

02/12/2021 MP CJL

BID DOCUMENTS

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

1/8" = 1'-0" E1

LIFE SAFETY PLAN - LEVEL 6

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

TYPE D

COORDINATE OUTAGES PER SECTION 01 00 00

SOLID ONE HOUR RATED WALLS WILL BE REQUIRED,

HEPA FILTRATION, WALK OFF MATS. PREFABRICATED

SYSTEMS ACCEPTABLE

YES

NOT APPLICABLE - 24/7 INPATIENT UNIT.

YES

NOT IN CONTRACT AREA

WORK AREA IS A 24/7 INPATIENT UNIT ON TOP FLOOR OF

VA MEDICAL CENTER. NURSING UNIT ON FLOOR BELOW

WITH MATCHING PATIENT ROOM LAYOUT.

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE RENO VA MEDICAL CENTER ICRA

PLAN AND AS DIRECTED BY THE CONTRACTING OFFICER

REPRESENTATIVE (COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS

PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES

(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD TO

THE CONSTRUCTION SITE SHALL BE POSTED AS PER THE

ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS

SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER

WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO

CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION

PERSONNEL TO PASS THROUGH THIS ROOM TO BE

VACUUMED WITH HEPA VACUUM CLEANER PRIOR TO

LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL

FOR OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION

AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,

THROUGHOUT DURATION OF PROJECT USING HEPA

EQUIPPED AIR FILTRATION UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR

OR EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN

CONSTRUCTION AREA TO PREVENT CONTAMINATION OF

EXISTING DUCT SYSTEM.

K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS

AND VISITORS SO THEY DO NOT EXIT THROUGH THE

CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO

THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION

AREA-DO NOT ENTER".

L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND

KEEP A CURRENT HOT WORK PERMIT ON SITE.

M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE

SURE THEY REMAIN EFFECTIVE.

N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.

ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS

AND/OR CONTAINERS.

O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM

PIPES AND CONDUITS APPROPRIATELY AND IMMEDIATELY

TO MAINTAIN DUST PROTECTION AND NEGATIVE AIR

PRESSURE.

P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST

MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING

RAGS FOR CLEANING FINE DUST FROM FLOORS AND

ADJACENT OCCUPIED AREAS. ANY DUST TRACKED OUTSIDE

OF CONSTRUCTION AREA SHALL BE CLEANED IMMEDIATELY.

Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION

AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH

DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON

APPROVAL). PATCH OR REPAIR ANY DAMAGE FROM

CONSTRUCTION BARRIER REMOVAL AND REMOVE

ISOLATION OF HVAC SYSTEM.

R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

STEP 1: TYPE C

IDENTIFY THE TYPE OF CONSTRUCTION PROJECT

ACTIVITY (TYPE A–D)

TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.

TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES

THAT CREATE MINIMAL DUST.

TYPE C: WORK THAT GENERATES A MODERATE TO

HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES.

TYPE D: MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS.

STEP 2: MEDIUM RISK

IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE

AFFECTED.

IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,

SELECT THE HIGHER RISK GROUP.

STEP 3: CLASS III

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,

HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION

PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX,

TO FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR

LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.

STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT

AREA, ASSESSING POTENTIAL IMPACT.

BELOW ABOVE NORTH SOUTH EAST WEST

_______________________RISK GROUP_____________________

LOW LOW N/A N/A N/A N/A

STEP 5:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 6:

IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND

ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE

OUTAGES.

STEP 7.

IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 8.

CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A

RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR

EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 9.

WORK HOURS: CAN OR WILL THE WORK BE DONE DURING

NON-PATIENT-CARE HOURS?

STEP 10.

DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 11.

DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE

OF HAND-WASHING SINKS?

STEP 12.

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS

PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE

(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES

AND AREA.)

STEP 13.

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED

UTILITY ROOMS?

STEP 14.

PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES

WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,

HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

C

LA

S S

II

I

DURING CONSTRUCTION

PROJECT

UPON COMPLETION OF

PROJECT

1. Remove or isolate HVAC system in area where work is being done, to prevent contamination of duct system.

2. Complete all critical barriers— i.e., drywall, plywood, plastic—to seal area from non-work area before construction begins. Or, implement control cube method with HEPA-fiItered vacuum for vacuuming prior to exit.

3. Maintain negative air pressure within worksite utilizing HEPA-equipped air filtration units.

4. Contain construction waste in tightly covered containers before transport.

5. Cover transport receptacles or carts. Tape down covering unless cart has a solid lid.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA-filtered vacuum.

4. Wet mop area with disinfectant.

5. Upon completion, restore HVAC system where work was performed.

Construction Project Type

Patient Risk Group LOW Risk Group MEDIUM Risk Group

HIGH Risk Group

HIGHEST Risk Group

I II II III/IV

I II III IV

I II III/IV IV

II III/IV III/IV IV

TYPE A TYPE B TYPE C TYPE D

YES

COR TO VERIFY STATION CIH APPROVAL

COR TO VERIFY STATION CIH APPROVAL

COR TO VERIFY STATION CIH APPROVAL

WEEKLY CHANGED

OR MORE AS

NEEDED PRE-FILTER

FLEX DUCT

MONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR

UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

PRESSURE INDICATOR SHALL BE AT

0.01 OR GREATER (VERIFY DAILY). IF

NOT VERIFY ALL OPENING SUCH AS

DOOR ARE CLOSED AND/OR CHANGE

NEGATIVE AIR PRE-FILTER.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT.

A

V

O

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

E

PROVIDE FOR EACH ROOM -

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

F6

GI301

PUBLIC AREA

CONSTRUCTION AREA

VERIFY OUTLET LOCATIONS

AND FUNCTIONALITY.

TEMPORARY WALL

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

FIRE RATED PLASTIC TO

PREVENT DUST INSTALL

PRIOR TO CONSTRUCTION

F

IN

IS

H

E D

F

LO

O R

T O

U N

D E

R S

ID

E

O F

S T

R U

C T

U R

E

V E

R

IF

Y F

LO

O

R T

O F

LO

O

R H

E

IG

H T

RENOVATED SPRINKLER

SYSTEM

RECEIVING

B6127B6127

BATH

B6131AB6131A

BATH

B6127AB6127A

TWO BED

B6131B6131

ONE BED

B6135B6135

HAC

B6133B6133

BATH

B6137AB6137A

BATH

B6135AB6135A

ELEC

EQUIP

B6139B6139

GROUP

THERAPY

B6143B6143

ONE BED

B6147B6147

ONE BED

B6149B6149

BATH

B6147AB6147A BATH

B6149AB6149A

ONE BED

B6150B6150

BATH

B6150AB6150A

TWO BED

B6208B6208

QUIET

B6146B6146

TWO BED

B6206B6206

BATH

B6206AB6206A

BATH

B6208AB6208A

WASHER

DRYER

B6205B6205

NOURISH

KITCHEN

B6203B6203

CLEAN

UTILITY

B6201B6201

CLEAN

LINEN

B6199B6199

OFFICE

B6140B6140

TELE

B6142B6142

RED BAG

STORAGE

B6138B6138

SOILED

UTILITY

B6136B6136

LOCKER

ROOM

B6195B6195

TELE

EQUIP

B6197B6197

TWO BED

B6204B6204

TWO BED

B6200B6200

BATH

B6200AB6200A

BATH

B6204AB6204A

STAIR 2

BS2BS2

TWO BED

B6194B6194

BATH

B6192AB6192A

BATH

B6194AB6194A

TWO BED

B6192B6192

SUN DECK

B6188B6188

SECLUSION

B6134AB6134A

ANTE RM

B6134B6134

TOILET

B6134BB6134B

TOILET

B6193BB6193B

SECLUSION

B6193AB6193A ANTE RM

B6193B6193

NURSE

STATION

B6128B6128

MEDICATION

B6128AB6128A

WORK RM

HOUSE

STAFF

B6104B6104

STAFF

TOILET

B6125B6125

COPY

B6124B6124

HAC

B6184AB6184A

DAY RM

RECREATION

B6184B6184

NON-FOOD

STRG

5C1395C139

TOILET

5C1385C138

TOILET

5C1375C137

NURSING

SUPERVISOR

OFFICE

5C1505C150

INTERVIEW

CONSULTATION

5C1495C149

PSYCHIATRIST

OFFICE

5C1485C148

PSYCHIATRIST

OFFICE

5C1455C145

PSYCHIATRIST

OFFICE

5C1445C144

HEAD

NURSE

5C1435C143

TELE

B6184CB6184C

CORRIDOR

B6C06B6C06

ONE BED

B6137B6137

ELEVATOR

LOBBY

B6EGDB6EGD

CORRIDOR

B6C01B6C01

ELEC

EQUIP

B6259B6259

CORRIDOR

B6C03B6C03

CORRIDOR

5C-C105C-C10

SOCIAL

WORK

OFFICE

5C1475C147

PSYCHIATRIST

OFFICE

5C1465C146

NURSE

CLINICIAN

PHYSICIAN

ASSISTANT

5C1425C142

REHABILITATION

THERAPIST

OFFICE

5C1415C141

DEMOSTRATION

CLASSROOM

5C1585C158

MULTIPURPOSE

OFFICE

5C1525C152

TOILET

5C1535C153

TOILET

5C1545C154

FEMALE

LOCKERS

5C1555C155

MALE

LOCKERS

5C1565C156

STAFF

LOUNGE

5C1575C157

CORRIDOR

5C-C115C-C11

CORRIDOR

5C-C125C-C12

CORRIDOR

5C-C95C-C9

HYDRO

TANK

5C1405C140

DINING

5C133A5C133A

BMS

5C1595C159

ELEVATOR

VESTIBULE

5C1615C161

LINEN

CHUTE

5C1625C162

HAC

5C1515C151

CORRIDOR

B6C04B6C04

CORRIDOR

B6C05B6C05

CORRIDOR

B6C02B6C02

SALLY

PORT

B6C02AB6C02A

NOT IN

SCOPE

NOT IN

SCOPE

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

PHASE 6

PHASE 7

PHASE 8

PHASE 9

PHASE 1 PHASE 2

P H

A S

E

P H

A S

E

PHASE 5PHASE 6

PHASE 7

PHASE 9

PHASE 8A

PHASE 8B

NOTE: TEMPORARY BARRIERS AND ANTE-ROOMS NOT SHOWN ON THIS SHEET FOR CLARITY,

SEE GI302 FOR ENLARGED PHASING AND ICRA PLANS.

CONTRACTOR SHALL ENSURE THAT ACCESS TO BOTH MEANS OF EGRESS (STAIR 1 AND STAIR 2)

ARE ACCESSIBLE FROM OCCUPIED SPACES AT ALL TIME. IN CASES WHERE AN ENTIRE

CORRIDOR WIDTH NEEDS TO BE TEMPORARILY BARRICADED (E.G. PHASE 2 & PHASE 7),

MAINTAIN AT LEAST ONE PATHWAY TO BOTH EXITS, AND USE TEMPORARY SIGNAGE TO CLEARLY

DIRECT OCCUPANTS.FOR EACH PHASE, CONTRACTOR SHALL PREPARE INTERIM LIFE SAFETY

MEASURE (ILSM) PLANS TO COORDINATE CHANGES TO PATHWAYS TO EGRESS, TEMPORARY

BARRIERS AND SIGNAGE, ETC. ALL ILSM PLANS, INCLUDING TEMPORARY BARRIERS AND

SIGNAGE, TO BE REVIEWED AND APPROVED BY COR AND MEDICAL TEAM PRIOR TO

INSTALLATION.

CONTRACTOR SHALL ENSURE ALL SURFACES ARE PROTECTED AT STAGING/ STORAGE AREA

LOCATION. CONTRACTOR TO REPLACE ANY DAMAGED ITEMS IN STAGING/ STORAGE ARE

INCURRED DURING CONSTRUCTION.

STAIR 1

BS1BS1

SEE GI302 FOR ENLARGED

PHASING & ICRA PLANS

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW

HW

TO BE USED FOR CONTRACTOR

STORAGE - COORDINATE WITH COR

BED

STORAGE

B6EGE

531 SF

SECONDARY ROUTE TO SILVER ELEVATOR:

CONTRACTOR TO COORDINATE WITH COR

AT TIME OF CONSTRUCTION FOR ELEVATOR

USAGE/ACCESS

DEDUCT #1

PHASE 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

/12

/20

B

IM

/6

-2

-1

I n p a ti e n t M e n ta l H e a lt h

E O

C C o m p lia n c e

R e n o v a ti o n s /6

-2 -1

.1

.A rc h .r v t

/1

/2

:4

:3

P

M

GI301

INFECTION CONTROL PLAN & PHASING - LEVEL 6

TRIPLE C - The A/E Group

1345 CAPITAL BLVD. SUITE A

RENO, NV 89502

MAT PERKINS

520-481-8548

654-20-117

02/12/2021 MP CJL

BID DOCUMENTS

SUBMITTAL

INPATIENT MENTAL HEALTH EOC

COMPLIANCE RENOVATIONS

975 KIRMAN AVENUE RENO, NV 89502-0993

1/4" = 1'-0" F8

TYPICAL CONSTRUCTION LAYOUT- CLASS III1/2" = 1'-0"

F6

CROSS SECTION A'-A'- CLASS IV

1/8" = 1'-0" E1

OVERALL PHASING AND ICRA PLAN - LEVEL 6

PHASE 1:

PHASING NOTES:

DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOMS

B6135 AND B6137, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO

THE START OF PHASE 2.

GENERAL:

THIS FACILITY WILL BE IN OPERATION FOR THE ENTIRETY OF

THE PROJECT'S CONSTRUCTION, AND IS A 24/7 FACILITY. ALL

WORK SHALL BE COORDINATED TO MINIMIZE INTERRUPTIONS

TO OPERATIONS AND WORKFLOW. ALL DOORS MUST BE KEPT

OPERATIONAL AT ALL TIMES. DO NOT BLOCK ANY DOORS

FROM FULLY OPENING OR CLOSING.

PHASE 2:

DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOM

B6147, INCLUDING THE RESTROOM CORE. ACCEPTANCE AND

TURNOVER TO BE COMPLETED PRIOR TO THE START OF

PHASE 3.

PHASE 3: (DEDUCT #1)

DEMOLITION AND RENOVATION OF ONE-BED RESIDENT ROOMS

B6149 AND B6150, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO

THE START OF PHASE 4.

PHASE 4:

DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS

B6208 AND B6206, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO

THE START OF PHASE 5.

PHASE 5:

DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS

B6200 AND B6204, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO THE

START OF PHASE 6.

PHASE 6:

DEMOLITION AND RENOVATION OF TWO-BED RESIDENT ROOMS

B6192 AND B194, INCLUDING THE RESTROOM CORE.

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO THE

START OF PHASE 7.

PHASE 7:

DEMOLITION AND RENOVATION OF NURSES STATION AND

ADJACENT CORRIDOR. ACCEPTANCE AND TURNOVER TO BE

COMPLETED PRIOR TO THE START OF PHASE 8.

PHASE 8:

A: - RENOVATE RECEIVING AND TWO-BED RESIDENT ROOM

B6127 & B6131.

B: INSTALL NEW INTERIOR WINDOWS AT STAFF WORK ROOM

(B6104).

ACCEPTANCE AND TURNOVER TO BE COMPLETED PRIOR TO

START OF PHASE 9.

PHASE 9: (DEDUCT #2 FLOORING ONLY)

INSTALL NEW INTERIOR WINDOWS AT SUN DECK EXTERIOR.

REMOVE AND REPLACE GLAZING AT DINING ROOM /

RECREATION ROOM INTERIOR WINDOW WALLS. REPLACE SINK

FIXTURES IN ANTE ROOM TOILETS. REMOVE AND REPLACE

HANDRAILS, DOORS, LIGHT FIXTURES, GRILLES, SIGNAGE, ETC.

IN REMAINDER OF PROJECT AREA. INSTALL CORRIDOR

FLOORING. COMPLETE ALL OTHER OUTSTANDING WORK.

PHASING LEGEND

ONE BED

B6135

220 SF

HAC

B6133

38 SF

BATH

B6137A

53 SF

BATH

B6135A

57 SF

ELEC

EQUIP

B6139

43 SF

ONE BED

B6137

178 SF

C

LE

A R

4' -0

PHASE 1

ANGLE ICRA BARRIER SIDE WALLS

TO MITIGATE BLIND SPOTS IN HALLWAY

ONE BED

B6147

179 SF

BATH

B6147A

41 SF

PHASE 2

ANGLE ICRA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .