Check Off sheet ITB~16.pdf
PDF 100 KB Posted
- Attached to
- CDC Building 2 Stair Improvements
- Solicitation number
- S-29100-00017404
- Issued by
- Oregon
About this file
This is a bidder reminders check-off sheet for the CDC Building 2 Stair Improvements contract opportunity in Oregon. The document outlines all required submissions that bidders must include with their bids to ensure responsiveness to the invitation to bid (ITB). Required submissions must be completed prior to the bid closing deadline, with the exception of the First Tier Subcontractor Disclosure Form, which may be submitted within two working hours after closing if necessary.
Bidders are required to submit Exhibit 1 (Pricing Submittal Section), bid security documentation (Section D), Construction Contractors Board registration and licensing requirements (Section G), acknowledgement of any addenda (Section H), responsibility inquiries and contractor references including ESB utilization information (Section I), bidder references (Attachment D), residency information (Section K), and the signature of the bidder's duly authorized representative (Section O). All applicable addenda must also be included with the bid submission. Failure to provide any of these required documents will result in the bid being deemed nonresponsive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Structural Calculations~1.pdf | ||
| 17404_Plans.pdf | ||
| 17404 ADDENDA 1.pdf | ||
| 17404_ Revised Plans.pdf | ||
| 17404 ITB_GTC_SGC_SPECS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder reminders check off sheet
INFORMATION TO BE SUBMITTED WITH THE BID: The items listed below in this section shall be submitted or the Bid shall be found to be non‐responsive. The following shall be submitted prior to Closing:
Exhibit 1- Pricing Submittal Section.
Section D- Bid Security Requirements
Section G- Construction Contractors Board (CCB) Registration Requirements; Asbestos Abatement Licensing Requirements, & Joint Venture ‐ Partnership Declaration, Section H- Addenda Acknowledgement.
Section I- Responsibility Inquiry & Contractor References; ESB Utilization.
Attachment D- Bidder References
Section K- Residency Information.
Section O- Signature of Bidder's Duly Authorized Representative.
Any Addenda (If required).
Section F- First Tier Subcontractor Disclosure Form. Or within two (2) working hours after the Closing.