17404 ADDENDA 1.pdf
PDF 240 KB Posted
- Attached to
- CDC Building 2 Stair Improvements
- Solicitation number
- S-29100-00017404
- Issued by
- Oregon
About this file
This is Addendum #1 to an Invitation to Bid (ITB S-29100-00017404) issued by the Oregon Department of Corrections Purchasing Section for CDC Building 2 Stair Improvements. The addendum modifies the original bid specifications and must be signed and returned by the bid closing date; failure to do so may result in bid rejection. The primary revision involves the complete replacement of the original 17404 Plans with 17404 Revised Plans, which constitutes a material change to the ITB. All other areas of the original invitation remain in full force and effect unless specifically addressed in this addendum.
The addendum includes a clarification regarding tariff-related cost impacts that may occur during the contract term. If tariffs are imposed and affect material costs, the Owner may agree to a cost increase via change order, provided that tariff increases are verified and documented before acceptance. Bidders must acknowledge receipt and understanding of this addendum by providing their company name, authorized signature, and date on the form included in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Structural Calculations~1.pdf | ||
| Check Off sheet ITB~16.pdf | ||
| 17404_Plans.pdf | ||
| 17404 ITB_GTC_SGC_SPECS.pdf | ||
| 17404_ Revised Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oregon Tina Kotek, Governor
ADDENDUM #1 for S-29100-00017404
Department of Corrections Purchasing Section
3601 State Street, Suite 280
Salem, OR 97301-5780
(503) 510-5285
Dustin.m.sculatti@doc.oregon.gov
8/17/2026
ADDENDUM #1
For # S-29100-00017404
CDC Building 2 Stair Improvements
Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications. This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.
This addendum shall be added to and become part of the original Invitation to Bid.
Item #1: Owner Clarification/Revision: If a tariff related occurrence is imposed during the life of the contract that affects materials costs, the Owner may agree to an increase of cost via change order. Tariff increases must be verified and documented before acceptance.
Item #2: Revision: 17404 Plans are deleted in their entirety and are replaced with 17404 Revised Plans.
This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.
Company Name: ________________________________________________________
Authorized Signature: ____________________________________________________
Date: _______________________________________
File details come from the government source that posted it. Updated .