CB2102-Addendum 02.pdf

PDF 1 MB Posted

Attached to
CB2102 - ITB Owl Creek, Peoria Road Bridge Replacement
Solicitation number
S-C01510-00012592
Issued by
Lake County, Oregon

About this file

This is Addendum No. 2 issued by the Linn County Road Department for the Owl Creek, Peoria Road Bridge Replacement project in Oregon, dated February 4, 2025. The bid opening is scheduled for February 18, 2025 at 9:35 PDT at the Linn County Courthouse. The addendum makes changes to the project bidding documents, specifically updating the regulated work areas section to specify that work within regulated areas must only be performed during the in-water work period of July 1 to October 31. Additionally, it requires the insertion of Sheet RD-04 between sheets RD-03 and RD-05 in the project plans.

The attached Sheet RD-04 provides detailed erosion control plans for the bridge replacement project, including specifications for sandbag placement, sediment barriers, work zone fencing, and permanent seeding. The plan includes specific requirements for erosion control facilities implementation, maintenance procedures, and construction staging requirements. The sheet contains technical drawings showing the placement of erosion control measures along Owl Creek and includes a sandbag detail diagram with installation specifications.

View the file

Other files

File Type Posted
General Conditions.pdf PDF
Fish Passage_ PA 02-0395.pdf PDF
NWP_2024-146_DEQ Permit~1.pdf PDF
2024 Linn Co General Conditions~4.pdf PDF
Project Plans.pdf PDF
NWP-2024-146_Corps Permit.pdf PDF
CR2102 Project Specifications.pdf PDF
Tabulation of Bids_Owl Creek.pdf PDF
CB2102 Bid Schedule - Excel Format.xlsx XLSX spreadsheet
Owl Creek_Intent to Award - Farline Bridge .pdf PDF
64962NP_DSL Permit.pdf PDF
Fish Passage PA-02-0418.pdf PDF
CB2102 Project Plans.pdf PDF
CB2102-Addendum 01.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N 0°15'26.23" W

EROSION CONTROL PLAN

1" = 20'-0"

3+

4+

5+

ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

ROW

ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

R O

W

ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

O w l C re ek

Permanent seeding Sediment barrier, Type 3 per RD1030 Work zone fencing per Section 00221.13

Wetland boundary - no work zone

Catch lines (construction limits)

Sandbag location when working on the north bank, typ.

Sandbag location when working on the south bank, typ.

Sandbags Storm drainage Flow Direction

K

EV

I N M . GROO

M

17206PE

OREGON

Expires: 6/30/25

General Notes:

1. The implementation of the erosion control plans and the construction, maintenance, replacement and upgrading of the erosion control facilities are the responsibility of the Contractor until all construction is completed and approved.

2. Installation, construction, and maintenance of erosion control facilities shall begin prior to clearing, grading, or other earth altering activities.

3. The erosion control facilities shown on this plan are anticipated for site conditions. During the construction period, these facilities shall be upgraded for unexpected storm events to insure that sediment and sediment laden water does not leave the site.

4. If the contractor elects to access beyond the limits shown, the erosion control details shown shall be extended past the limits of the work bridge and access.

5. Develop a revised plan of the erosion control facilities shown in accordance with the requirements of Section 00280 of the Oregon Standard Specifications for Construction. This plan must be constructed in conjunction with all clearing and grading activities. Construct in such a manner as to insure that sediment and sediment laden water does not enter the drainage system, roadway, or violate applicable water standards. Construct controls in segments applicable to each staging phase.

6. Stabilized construction entrances shall be installed at the beginning of construction and maintained for the duration of the project. Additional measures may be required to insure that all paved areas are kept clean for the duration of the project.

SANDBAG DETAIL

NO SCALE

Check dam, Type 4, sand bag, typ.

6 mil. or thicker polyethylene sheet

Water surface

Existing stream bottom

Notes:

1. Sandbags shall meet the requirements of

Section 00280.15 of the Specifications.

2. Stagger sandbag rows for stability.

3. Extend polyethylene sheet 6" minimum above water level.

4. One bag thickness shown, but multiple layers may be required for stability.

5. Add layers of sandbags and extend polyethylene sheet as required if water elevation increases.

Stream Side Work Side

K:

\P ro je ct s

- C ur re nt

\B R

2-

O w l C re ek

(P eo ria R oa d)

B rid ge \K

M G

\A C

AD

\0

2-

D es ig n.

dw g

2/ 4/

:4

PM

SCALE: as shown SHEET RD-04

EROSION CONTROL PLAN1/13/20250002-0306

D. Malone

K. Groom

E-MAIL: Roads@co.linn.or.us

FAX: (541) 924-0202

PHONE: (541) 967-3919

ALBANY, OREGON 97322

3010 FERRY STREET SW

CB2102

A. Potts

K. Groom

OWL CREEK - PEORIA ROAD

BRIDGE REPLACEMENT

LINN COUNTY

T. 12 S., R. 04 W., SECTION 17, W.M.

WARNING

If this bar does not measure 1" then drawing is not to scale Digitally signed by Kevin M. Groom Date: 2025.02.04 14:49:38-08'00'