Categorical Exclusion Form (NEPA) (FHWA).pdf

PDF 359 KB Posted

Attached to
Natchez Trace Parkway Project MS NP NATR 3F26
Solicitation number
693C73-27-B-000001
Issued by

About this file

This is an Eastern Federal Lands Highway Division NEPA Categorical Exclusion Form for a transportation infrastructure project in Mississippi. The project number is MS NP NATR 3F26, dated April 24, 2026, and covers the Natchez Trace Parkway Mainline Overlay from milepost 226.55 to 239.23 in Chickasaw County, Mississippi, located within the National Park Service property.

The project consists of resurfacing the Parkway including ramps, bridges, intersections, and parking/pull-off areas through milling, asphalt overlay, shoulder widening, spot reconstruction, pavement markings, raised profile striping at bridge approaches, and miscellaneous work. The project qualifies under the categorical exclusion category 23 CFR 771.117(c)(26) for modernization of highways through resurfacing and rehabilitation activities. Environmental commitments and mitigation measures focus on protection of rare, threatened, and endangered species, particularly the Northern Long-eared Bat and Tri-colored Bat, with specific timing windows for tree removal and bridge/culvert work between August 1 to December 14 or February 16 to May 14. Bridge and culvert inspections must follow Appendix K guidelines, and a qualified biologist must assess structures for bat use if work occurs outside specified windows. The project received a "no effect" determination for Price's Potato-bean, Alligator Snapping Turtle, and Monarch Butterfly, and a "not likely to adversely affect" determination for the two bat species based on implemented mitigation measures. The National Park Service Cultural Resource experts determined no adverse effect to historic properties under Section 106 of the National Historic Preservation Act. The FHWA Eastern Federal Lands concurred with the National Park Service Categorical Exclusion dated March 16, 2026, and the project was categorically excluded from further NEPA analysis by Environmental Team Leader Kevin S. Rose on April 27, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)

MS NP NATR 3F26

Eastern Federal Lands Highway Division NEPA Categorical Exclusion Form

Project Number: MS NP NATR 3F26 Date: 4/24/2026

Project Name: Natchez Trace Parkway Mainline Overlay from MP 226.55 to MP 239.23

Location: National Park Service, Natchez Trace Parkway Chickasaw County, Mississippi

CE Category 23 CFR 771.117(c)(26): Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (including parking, weaving, turning, and climbing lanes), if the action meets the constraints in paragraph (e)[..]

See 23 CFR 771.117 for full description of CE categories, including additional requirements when applying (c)26-28.

Project Description This project consists of resurfacing the Parkway, including ramps, bridges, intersections and parking/pull-off areas. The work includes milling, asphalt overlay, shoulder widening, spot reconstruction, pavement markings, raised profile striping at bridge approaches, and other miscellaneous work.

Environmental Commitments and Mitigation Measures

• Rare, Threatened & Endangered Species:

o Northern Long-eared Bat (NLEB) and Tri-colored Bat:

Tree removal will occur between August 1 to December 14 or February 16 to May 14.

Bridge and culvert work, including roadway paving above culverts and riprap placement at inlets/outlets, will occur between August 1 to December 14 or February 16 to May 14.

If bridge or culvert work, including paving above culverts, needs to occur between

December 15 and February 15 or May 15 to July 31, a qualified biologist will inspect structures for evidence of bat use prior to construction.

• Inspections will follow Appendix K, Assessing and Surveying Bridges and Culverts for Bat Use in the most recent version of the Range-wide Indiana Bat & Northern Long-eared Bat Survey Guidelines (https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines). The guidance will be provided to the qualified biologist preforming inspections.

• Inspections will occur within two years of construction activities beginning at a structure.

• The Bridge/Culvert Assessment Form from Appendix K will be used to https://www.ecfr.gov/cgi-bin/text-idx?SID=842bb87055f89f1d0ff242f2b9e20ff7&mc=true&node=pt23.1.771&rgn=div5#se23.1.771_1117 https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey-guidelines

EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04) document inspections. https://www.fws.gov/sites/default/files/documents/2025- 04/bridge-and-culvert-bat-assessment-form-1.pdf

• All culverts 24-inches or greater and 23 feet or greater in length, will be inspected per the guidelines.

• All cracks and crevices large enough to provide habitat for bats will be inspected.

• If evidence of bats is seen:

o The NATR/FHWA will notify the Service immediately to discuss appropriate avoidance measures. No work will begin at the structure location until discussions with the Service have concluded.

o The preferred avoidance measure is delaying work until construction can be complete between August 1 to December 14 or February 16 to May 14. If this cannot occur, the FWHA will reinitiate consultation with the Service to assess impacts of the proposed activity and determine additional conservation measures.

• Regardless of when work is done, if bat use is observed, ensure habitat remains after the structure is repaired so bats can return the following season.

• If evidence of bats is not found during the inspection of a structure, but evidence or bat sightings are unexpectedly made during construction, the contractor will stop work and the NATR/ FHWA will notify the Service immediately. No work will resume at the structure location until discussions with the Service have concluded.

• Complete structure assessment forms will be provided to the NATR and FHWA by the contractor within one business day of encountering evidence of bats.

FHWA will submit them to the Service when bats are documented.

• If previously unknown archeological resources are discovered during construction, all work in the immediate vicinity (600 feet) of the discovery shall be halted until the resources are identified and documented and an appropriate mitigation strategy developed, if necessary, in accordance with pertinent laws and regulations, including the stipulations of the 2008 Programmatic Agreement Among the National Park Service (U.S. Department of the Interior), the Advisor Council on Historic Preservation, and the national Conference of State Historic Preservation Officers.

• Staging areas shall be confined to existing parking areas or previously disturbed locations.

Summary of Section 7 of the Endangered Species Act Compliance The listed species in Chickasaw County include Northern Long Eared Bat (Endangered), Price’s Potato-bean (Threatened), Tricolored Bat (Proposed Endangered), Alligator Snapping Turtle (Proposed Threatened), and Monarch Butterfly (Proposed Threatened). There is no designated critical habitat in the project area. The project is occurring in previously disturbed transportation right of way. No suited habitat elements would be destroyed or altered by the proposed project’s actions. Through the U.S. Fish and Wildlife Service IPaC tool and in concurrence with U.S. Fish and Wildlife Natural Resource Specialists, the Federal Highway Administration made a “no effect” determination for the Price’s Potato-bean, Alligator Snapping Turtle, and Monarch Butterfly: The proposed project’s actions would have no effect on listed species. A “not likely to https://www.fws.gov/sites/default/files/documents/2025-04/bridge-and-culvert-bat-assessment-form-1.pdf https://www.fws.gov/sites/default/files/documents/2025-04/bridge-and-culvert-bat-assessment-form-1.pdf

EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04) adversely affect” determination was made for the two bat species due to the listed mitigations that will be in place during construction.

Summary of Section 106 of the National Historic Preservation Act Compliance On March 16, 2026, the National Park Service Cultural Resource experts determined the proposed federal undertaking would have no adverse effect to historic properties.

Additional Agency Coordination and Compliance The FHWA Eastern Federal Lands concurs with the National Park Service Categorical Exclusion for Recurring Paving and Rehabilitation of Existing Roads along the Natchez Trace Parkway dated March 16, 2026.

EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)

Categorical Exclusion Recommendation:

On the basis of the environmental impact information in the statutory compliance file, with which I am familiar, I believe the project should be categorically excluded from further NEPA analysis.

Kelly Stern Environmental Protection Specialist

Federal Highway Administration

Date

Categorical Exclusion Determination:

On the basis of the environmental impact information in the statutory compliance file, with which I am familiar, I am categorically excluding the described project from further NEPA analysis. The project meets the 23 CFR 771.117(a) definition of a categorical exclusion. No unusual circumstances per 23 CFR 771.117(b) apply.

Kevin S. Rose Environmental Team Leader

Federal Highway Administration

Date

EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)

Appendix A: Environmental Checklist

Section 7 of the Endangered Species Act:

• Are Federally-listed species potentially present in the study area? ☒Yes, see Notesi ☒No If Yes, effects determination:

☒No Effect ☒May Affect, Not Likely to Adversely Affect ☐May Affect, Likely to Adversely Affect

Section 106 of the National Historic Preservation Act:

• Are historic properties known to be present in the study area? ☒Yes ☐No

If Yes, will they be impacted by the project? ☐Yes ☒No

• Will previously undisturbed ground be disturbed?

☐Yes ☒No

• Effects determination:

☐No Historic Properties Affected ☒No Adverse Effect ☐Adverse Effect, MOA Executed

• Was tribal consultation completed? ☐Yes ☒No

Water and Wetlands:

• Section 404 of the Clean Water Act

Are impacts to Waters of the US anticipated? ☐Yes ☒No If Yes, approval anticipated:

☐Nationwide Permit (NWP) ☐Regional General Permit ☐Individual Permit

• Section 401 of the Clean Water Act ☐NWP certified by State ☐Individual Certification

• Section 402 of the Clean Water Act (National Pollutant Discharge Elimination System) Will the land disturbance threshold likely be exceeded to require a permit and SWPPP?

☐Yes ☒ No

• Is post-construction stormwater management review/approval anticipated? ☐Yes ☒No

• ☒Project is consistent with Executive Order 11990, Protection of Wetlands

Floodplains:

• Is the project in a FEMA floodplain?

☒Yes ☐No ☐ Floodplain not mapped

• ☒ Project is consistent with Executive Order 11988, Floodplain Management

Section 4(f) of the USDOT Act:

• Does the project meet the Section 4(f) exemption for Federal lands transportation facilities under

Section 1119(c)(2) of MAP-21, 23 U.S.C. 138(a)? ☒Yes ☐No

• Is there a use of a Section 4(f) property in the study area? ☐Yes ☒No

If Yes, De Minimis Finding:☐ Programmatic:☐ Individual 4(f): ☐

EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)

Section 6(f) of the Land and Water Conservation Fund:

• Was the property purchased with grant funds from the Land and Water Conservation Fund?

☐Yes ☒No

• If Yes, was documentation of approval from National Park Service Director received for the conversion or replacement of 6(f) property? ☐Yes ☐No Coastal Zone Management Act of 1972:

• Is the project in a Coastal Zone? ☐Yes ☒No

• If yes, will a Federal Consistency Review be completed? ☐Yes ☐No

Right of Way:

• Is the project completely within the transportation facility’s right-of-way? ☒Yes ☐No

• If no, will the project require relocations or easements? ☐Yes ☐No

Hazardous Waste and Materials:

• Are hazardous materials or contamination exceeding regulatory thresholds (as set by U.S. EPA, County Environmental Health, etc.) present? ☐Yes ☒No

• If Yes, is the nature and extent of the hazardous materials or contamination fully known? ☐Yes ☐No, plan for securing information provided in Notes Section 7(a) of the Wild and Scenic Rivers Act:

• Are there Wild and Scenic Rivers? ☐Yes ☒No ☐Eligible If Yes, has review by the river-administering agency been completed? ☐Yes ☐No

Clean Air Act:

• Is the project in a non-attainment area? ☐Yes ☒No

If Yes, is the project on the Transportation Improvement Program(TIP)/State Implementation Plan(SIP)? ☐ Yes ☐No

Highway Traffic and Construction Noise Regulations:

• ☐ The proposed project is a Type I project (highway on a new location, substantial horizontal or vertical alteration, new through or auxiliary lanes). Noise analysis is required.

• ☐ The proposed project is a Type II project (retrofit for noise abatement).

• ☒ The proposed project is a Type III project (noise analysis not required).

• ☐ Does not apply.

Farmland Protection Policy Act for Highway Projects:

• Does the project displace, require acquisition of, or require an easement from farmland?

☐Yes ☒No Does the project affect any other resources not listed above? Explain below and list anticipated permits:

EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04) i Federally-listed species per U.S. Fish and Wildlife Service’s IPaC: Northern Long Eared Bat (Endangered), Price’s Potato-bean (Threatened), Tricolored Bat (Proposed Endangered), Alligator Snapping Turtle (Proposed Threatened), Monarch Butterfly (Proposed Threatened)

2026-04-24T13:21:13-0400
KELLY NICOLE JOY STERN
2026-04-27T11:34:57-0400
KEVIN S ROSE