BPM006010_Attach11_References_MatrixNEWorld.pdf
PDF 215 KB Posted
- Attached to
- Master Agreement AZ|CTR072300
- Contract number
- CTR072300
- Issued by
- Arizona
About this file
This document is a Request for Proposal (RFP) from the Arizona Department of Environmental Quality (ADEQ), Solicitation No. BPM006010, for ASRAC Assessment and Remediation of Hazardous Substances. The RFP includes an Attachment 11 - References, which provides detailed reference information for Matrix New World Engineering, featuring projects with four different clients: AZ School Risk Retention Trust, City of Tempe Engineering & Transportation Department, Plymouth Tube, and Crane Co.
The references showcase Matrix's extensive environmental remediation services, including groundwater and soil investigations, in situ bioremediation, soil vapor extraction, monitoring, and treatment system operations across multiple sites in Arizona, Pennsylvania, and Illinois. Projects range from investigating underground storage tank releases at a school district to managing a 15-year Superfund site remediation effort, with scopes involving comprehensive environmental assessments, contaminant characterization, groundwater and soil sampling, advanced modeling techniques, and strategic remediation approaches. The references demonstrate Matrix's capability to handle complex environmental challenges, successfully reducing contaminant concentrations and implementing innovative remediation technologies across various industrial and municipal settings.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Solicitation No. BPM006010
ASRAC Assessment and Remediation of Hazardous Substances
Arizona Department of Environmental
Quality (ADEQ)
1110 W. Washington Street
Phoenix, AZ 85007
Solicitation Attachment – References | Revision No. 1 | Revised 11-22
Attachment 11 – References
ADEQ intends to conduct reference checks for accounts provided by Offerors. ADEQ may, at its sole discretion, contact additional clients not presented as references, including internal state clients. Offerors shall provide at least three (3) client references for assignments that replicate or mirror the requirements of this Solicitation. At least one (1) of the projects referenced must be related to public sector work. All references shall be for work received and completed within the last five (5) years. Include information which documents successful and reliable past performance to clients providing services similar to those detailed in solicitation
Scope of Work, DO NOT include ADEQ references.
1 Client company/Address Contact Begin date End date
AZ School Risk Retention Trust, Inc.
P.O. Box 40098
Phoenix, AZ 85067-0098
David Wheeler, Senior Property
Adjustor Jul 2021 Nov 2023
Phone number Email address
602-200-2451 dwheeler@the-trust.org
Summarize the scope and deliverables provided, including timeline and outcome.
Project Title: LUST Site Investigation and Corrective Action, Roosevelt School District #66, ADEQ Facility ID #0-004192, ADEQ LUST #5850.01, Phoenix, AZ
Roosevelt School District (RSD) contracted Matrix New World Engineering (Matrix) to perform site assessment activities in
2021 through 2023 at the RSD Maintenance Facility and bus yard in Phoenix, Arizona. The scope of work included site characterization and soil remediation and included the following Scope of Work items:
• Drilling and soil sampling of four soil borings to determine the vertical and lateral extent of soil impacted by a release from the former underground storage tank (UST) system. Laboratory analysis of soil samples demonstrated the extent of soil impacted by various petroleum volatile organic compounds (VOC) was adequately defined.
• Installation and sampling of six groundwater monitoring wells to define the source area groundwater conditions and lateral extent of VOC impact to groundwater. Groundwater monitoring and sampling laboratory analytical results defined the lateral extent of impacted groundwater.
• Collection of soil vapor samples at the release source area to assess the potential for intrusion of VOC vapors into current and hypothetical site buildings and determine vapor intrusion risks. Results demonstrated the vapor intrusion exposure pathway was incomplete.
• Installation of soil vapor extraction (SVE) wells and operation of a mobile SVE system to remove residual VOC concentrations from the vadose zone and eliminate the potential for leaching of additional VOCs to groundwater. The SVE system operated for 120 days and removed approximately 24,000 pounds of VOC (e.g., 200 pounds per day; equivalent to 3,800 gallons of gasoline).
• Confirmation soil sampling to determine post-SVE soil conditions and assess the leaching potential of residual VOC to groundwater. The evaluation determined VOC concentrations in soil were reduced below applicable ADEQ Soil
Remediation Levels (SRL) and calculated Groundwater Protection Levels (GPL), which are protective of groundwater.
Timeline: The work was completed July 2021 – November 2023 (> 2 years).
Outcome: Complete characterization of soil and groundwater impacted by the gasoline release. Soil remediation sufficient to require no further action to eliminate vapor intrusion risk and the potential for leaching to groundwater.
List key Materials or Services provided.
Soil borings, soil vapor sampling (vapor survey), installation of SVE wells and mobile SVE system, soil and groundwater sampling, data compilation & analysis, risk assessment, reporting
Arizona Department of Environmental
Quality (ADEQ)
2 Client company/Address Contact Begin date End date
City of Tempe Engineering & Transportation Department
31 E. Fifth Street, Mail Stop 01-8, Tempe, AZ 85281 Dean Alford, PG, Hydrologist Jan 2022 June 2022
Phone number Email address
480-350-2603 Dean_Alford@tempe.gov
Summarize the scope and deliverables provided, including timeline and outcome.
Project Title: Well RW-3 HydroPunch® Investigation, Ken McDonald Golf Course, City of Tempe, AZ
Matrix was contracted by the City of Tempe (City) to provide professional services to oversee drilling and sampling at four soil borings (RW-3A, RW-3B, RW-3C, RW-3D) on the City’s Ken McDonald Golf Course (KMGC). The soil borings and proposed recharge wells were designed to support the Kyrene Water Reclamation Plant (KWRP) which is authorized to operate at an annual flow of 9.0 million gallons per day (MGD) in accordance with the Facility’s Aquifer Protection Permit (APP). The drilling and sampling investigation was conducted to: 1) evaluate potential future recharge well locations, including candidate locations for recharge well RW-3, and 2) determine the absence or presence of 1,1-dichloroethene (1,1-DCE) contamination believed to be associated with the Former Capital Casings (FCC) Water Quality Assurance Revolving Fund (WQARF) Site.
Sonic drilling methodologies were chosen to provide a detailed profile of the subsurface stratigraphy. The groundwater sampling strategy included collecting discrete groundwater samples using a HydroPunch® sampling tool at pre-determined intervals in the aquifer to a target depth of 430 ft bgs. Twelve samples were collected from each borehole. All groundwater samples were analyzed for TDS, fluoride, nitrate, total arsenic and chromium, and VOCs. Samples collected at depths of 95, 150, 220, 290, and 370 ft bgs were also submitted for analysis of PFAS.
Timeline: The work was completed January – June 2022 (6 months).
Outcome: 1) The most favorable locations for new recharge wells were identified based on a cumulative score ranking available aquifer thickness and groundwater quality conditions. 2) Concentrations of 1,1-DCE were detected at various depths in one of the four borings. 3) Concentrations of PFOA and PFOS were detected in all samples analyzed. In all soil borings, the combined PFOA plus PFOS results were less than the health advisory level (HAL) of 70 ng/L. Generally, the highest concentrations of combined PFOA and PFOS occur in the upper portion of the Salt River Deposits at depths of 95 to 150 ft bgs.
List key Materials or Services provided.
Soil borings, detailed lithologic logging, groundwater sampling, data compilation & analysis, reporting, well siting recommendations
Arizona Department of Environmental
Quality (ADEQ)
3 Client company/Address Contact Begin date End date
Plymouth Tube
29 W 150 Warrenville Road, Warrenville, IL 60555
Jenna Griffith, Director of
Environmental Health & Safety Sep 2021 Oct 2023
Phone number Email address
270-991-3111 jmgriffith@plymouth.com
Summarize the scope and deliverables provided, including timeline and outcome.
Project Title: In Situ Bioremediation Evaluation of Solvents and 1,4-Dioxane in Groundwater, Horsham, PA
Matrix New World Engineering (Matrix) personnel evaluated various in situ bioremediation and chemical approaches for degradation of chlorinated solvents (PCE, TCE, cis-1,2-DCE, vinyl chloride) and 1,4-dioxane in groundwater and sediments that had existed at a former industrial site for more than 40 years. Matrix prepared work plans, performed groundwater and soil sampling, conducted fingerprinting analyses to evaluate various sources, and installed Bio-Traps with various carbon sources and bioaugmentation options to use in the design of the full-scale source treatment system.
Matrix personnel worked with regulators at the Pennsylvania Department of Environmental Protection to get approval for the system. An in situ bioremediation system for the source zone, which includes fractured bedrock, was installed. The in situ bioremediation (ISB) system includes two recirculation wells that were injected with quick-release and slow-release carbon source biostimulation amendments, a buffer to maintain optimum pH conditions and a bioaugmentation culture
(Dehalococcoides) to promote complete biodegradation of the chlorinated ethenes to the non-harmful compound ethene. This project also involved the injection of two new microbes, Pseudonocardia dioxanivorans CB1190 and 1,4-DStroyer, which are capable of biodegrading 1,4-dioxane at concentrations greater than 3 milligrams per liter under aerobic conditions.
Timeline: The work was completed September 2021 – October 2023 (injections completed).
Outcome: In less than two years, there has been more than a three-order magnitude decrease in the concentration of chlorinated ethenes in groundwater. More than a 90% reduction in 1,2-dioxane was observed in two years.
List key Materials or Services provided.
Work plans, monitor well installation, groundwater and soil sampling, fingerprinting analyses to evaluate contaminant sources, pilot-scale testing to facilitate full-scale treatment system design, interaction with State regulators, injection of two new microbes, data compilation & analysis, reporting
Arizona Department of Environmental
Quality (ADEQ)
4 Client company/Address Contact Begin date End date
Crane Co
100 First Stamford Place, Stamford, Connecticut 06902
Nigel Goulding, Chief Technical
Officer, EHS Support Jan 2009 Feb 2024
Phone number Email address
412-977-4474 Nigel.Goulding@ehs-support.com
Summarize the scope and deliverables provided, including timeline and outcome.
Project Title: Groundwater and Soil Vapor Monitoring, O&M of Remediation Systems, PGAN Superfund Site, Goodyear, AZ
In 1981, groundwater within and adjacent to a former Unidynamics Phoenix, Inc. facility located in Goodyear, Arizona was discovered as contaminated with trichloroethylene (TCE) and perchlorate. The Site contained approximately 3 square miles of contaminated groundwater, originating from the facility’s historical manufacturing activities, and was eventually designated as the Phoenix-Goodyear Airport-North (PGAN) Superfund Site.
For PGAN, Matrix managed daily operation and maintenance of five groundwater treatment systems (GTS) and one soil vapor extraction (SVE) system, focused on source area remediation. The combined instantaneous flow rate for the groundwater treatment systems was 4,700 gallons per minute utilizing 19 extraction wells. Treated groundwater was discharged for beneficial reuse to an irrigation canal, golf course pond, used for irrigation of a municipal park, or conveyed to up to 14 injection wells.
Matrix completed engineering design and provided construction oversight for treatment system construction, upgrades, and optimization.
For more than a decade, Matrix performed monthly and quarterly groundwater sampling activities, including sampling of 110+ groundwater sampling points, 60+ soil vapor points, and sampling of the GTS and SVE systems. Matrix also maintained and managed the project database, including analytical results from all sampling points, well construction details, and system data.
Matrix used state-of-the-art 3D modeling techniques and ArcGIS Desktop / Spatial Analyst to depict the horizontal and vertical extent of contaminant mass, groundwater flow and contaminant transport to maximize operation of wells for plume control / containment and to identify strategic locations for additional monitoring locations.
Timeline: Matrix’s work on this project was completed January 2009 – February 2024 (15-year tenure).
Outcomes:
➢ TCE groundwater plumes defined, contained, and reduced by expanding groundwater monitor wells program, treatment system installations/modifications, and extraction/injection well network expansions.
➢ Maintained groundwater treatment system uptimes at 95% goal.
➢ Completed soil vapor extraction (SVE) remedy, rebound soil vapor monitoring, and decommissioned SVE equipment.
➢ Treated groundwater is used for beneficial reuse in Roosevelt Irrigation District and City of Goodyear; as a heat exchanger for St. Thomas Aquinas church & school’s HVAC system; and recharging the local aquifer system.
List key Materials or Services provided.
Work plans, remediation system O&M; hydrogeologic/engineering services; pilot-scale testing and full-scale treatment design;
design, installation and testing of numerous monitor wells, injection, and extraction wells; groundwater flow and contaminant transport modeling; permitting; soil, soil gas, and groundwater sampling; data compilation & analysis; reporting; interaction with
USEPA, ADEQ, and community stakeholders; project management
File details come from the government source that posted it. Updated .