BL020-22 Addendum #1

2 MB Posted

Attached to
Playground Replacement at Collins Hill Park
Solicitation number
BL020-22
Issued by
Gwinnett County, Georgia

About this file

This is Addendum #1 to the bid solicitation BL020-22 for Playground Replacement at Collins Hill Park issued by Gwinnett County Board of Commissioners in Georgia on March 1, 2022. The addendum provides critical clarifications and answers to bidder questions regarding the playground replacement project. Key project parameters include a mandatory on-site work start date of June 1, 2022, and specific requirements for handling existing engineered wood fiber, with the top 4 inches permitted to be relocated within the park while remaining material must be removed. Park staff will handle tree removal and retaining wall cleaning following the removal of existing materials. Bidders must acknowledge receipt of this addendum on page 10 of the bid document.

The addendum addresses logistical and operational requirements essential for bid preparation. Access to the pavilion playground is designated from the park drive near the second parking lot, with contractors required to avoid tree canopies and existing storm drainage systems. Staging areas and temporary storage, including dumpster placement, must be located in the baseball playground parking lot, second section, second bay, with contractors responsible for providing temporary fencing around the staging area. Critically, all bidders must submit new drainage plans with their bids, listed under "Drainage Materials" in the equipment list. Concrete ramps will feed into the playground area. The addendum includes attachments with a pre-bid conference sign-in sheet and aerial photos identifying access points and staging locations to guide contractor logistics planning.

Text of this file

March 1, 2022

ADDENDUM #1

BL020-22, Playground Replacement at Collins Hill Park

CLARIFICATIONS:

C1. On-site work cannot begin until 6/1/2022.

C2. The top 4” of existing engineered wood fiber may be placed elsewhere in the park. The remainder must be removed from the site.

C3. Park staff will remove three trees from the baseball playground once the existing engineered wood fiber has been removed. At that time, they will also clean the existing retaining walls.

QUESTIONS:

Q1. Will the concrete ramps feed into the playground area?

A1. Yes

Q2. What is the best access point for getting equipment and materials to the pavilion playground?

A2. Access to the pavilion playground will be from the park drive, near the second parking lot. The contractor should keep to the far side of the field, but not go under existing tree canopies or over existing storm drainage. Staging area will be in the lawn next to the playground. (See Attachment B below)

Q3. Is there a designated area for temporary storage and a dumpster?

A3. Temporary storage and dumpster shall be located in the baseball playground parking lot, second section, second bay (see Attachment B below). Contractor shall provide temporary fence around staging area to protect their equipment and the public.

Q4. Do we need to submit new drainage plans with our bid?

A4. Yes. This shall be listed in the equipment list under “Drainage Materials.”

Acknowledge receipt of this addendum on page 10 of the bid document.

Thank you, Jake Scarpone

Jake Scarpone Purchasing Associate II

ATTACHMENTS:

A. Pre-Bid Conference Sign-In Sheet B. Aerial photos for access points

ATTACHMENT A

ATTACHMENT B

ATTACHMENT B CONTINUED

Other files

File Type Posted
Award Information —
BL020-22 Invitation to Bid —
Equipment Comparison Form —
Plans —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .