BID_RESPONSE_FOR_I-4_-_2025.docx

DOCX document 19 KB Posted

Attached to
I-4 Interstate and Downtown Interchanges Grounds Maintenance (Bid Discount) State and local contract opportunity
Solicitation number
26-P-00055
Issued by
Hillsborough County, Florida

About this file

This is a bid response document for grounds maintenance services at I-4 Interstate and Downtown Interchanges locations in Florida. The scope of work encompasses turf mowing, landscape bed maintenance, and amenity upkeep across 15 numbered sites distributed across eight geographical sheets (A through H). The sites are located at various interchange points including Ashley Street, Jefferson Street, Interstate 275, Nebraska Avenue, and Columbus Drive corridors. The bidder is required to provide cost-per-site pricing and total cost calculations based on a frequency of 22 cuts per year. Several sites are noted as being added to the contract upon completion of ongoing construction, with quotes for new completed sites to be requested as they become available for service inclusion.

The bid response document presents a template for pricing structure without populated cost figures, indicating this represents a blank form awaiting vendor completion. Pricing must be submitted for individual sites and multiplied by the annual frequency of 22 service cuts to establish cost-per-site annual charges. The document does not specify response deadlines, bid due dates, site visit requirements, or formal bidders' meetings. No information regarding contract term length, renewal options, set-asides, incumbent contractors, funding sources, or budget allocation amounts is provided in this response template. The phased approach to site additions suggests contract flexibility to accommodate the ongoing construction environment along the Interstate 4 corridor.

View the file

Other files for this state and local contract opportunity

Other files attached to I-4 Interstate and Downtown Interchanges Grounds Maintenance (Bid Discount), newest first.
File Type Posted
I-4_Interstate_and_Downtown_Interchanges_Grounds_Maintenance_(Bid_Discount)_(Addendum_#1_Revision).pdf PDF
I-4_Interstate_and_Downtown_Interchanges_Grounds_Maintenance_(Bid_Discount).pdf PDF
I-4_Work_Location_Aerial_Photos_updated_12-16-25.pdf PDF
I-4_Work_Location_Aerial_Photos_updated_12-16-25.pdf PDF
TECHNICAL_SPECIFICATIONS_FOR_I-4_AND_DOWNTOWN_INTERCHANGE.pdf PDF
BID_RESPONSE_FOR_I-4_-_2025.docx DOCX document
Options_I-4.pdf PDF
Options_I-4.pdf PDF
TECHNICAL_SPECIFICATIONS_FOR_I-4_AND_DOWNTOWN_INTERCHANGE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
26-P-00055_-_DMI-45-Form-EBO-Determination-Letter-SLBE.pdf PDF
ATTACHMENT_A_Occupational_Safety_and_Health_Administration_SDS.pdf PDF
26-P-00055_-_DMI-45-Form-EBO-Determination-Letter-SLBE.pdf PDF
ATTACHMENT_A_Occupational_Safety_and_Health_Administration_SDS.pdf PDF
26-P-00055_-_Minimum-Certified-Contact-List-SLBE.xlsx XLSX spreadsheet
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
26-P-00055_-_Minimum-Certified-Contact-List-SLBE.xlsx XLSX spreadsheet
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID RESPONSE FOR

I-4 INTERSTATE AND DOWNTOWN INTERCHANGES GROUNDS MAINTENANCE

1. NORMAL SERVICE – Please refer to attached map locations.

2. Note: As construction sites are completed, quotes for new completed sites will be requested for adding the new sites to this award.

NAMELOCATIONCOST PER SITEFREQUENCY COST
(Cost per cut X 22)

Sheet A Site(s) #1-3

· Site 1 – Ashley St. off ramp to Tyler Street $_________________ $_________________

· Site 2 – Ashley St. exit South Pond $_________________ $_________________

· Site 3 – Ashley St. exit North Pond $_________________ $_________________

Sheet B Site(s) #4 as construction will allow

· Site 4A – Jefferson St. Interchange $_________________ $_________________

· Site 4B – Five (5) medians at entrance and exit ramp(s) at Jefferson St., Scott St. and Orange Ave. $_________________ $_________________

Sheet C Site(s) #5-7as construction will allow
· Site 5 – West Interstate 275$_________________$_________________

· Site 6 – Interstate 275 to Nebraska Ave. $_________________ $_________________

· Site 7 – Nebraska Ave. to 13th St. $_________________ $_________________

Sheet D Site(s) #8-9 as construction will allow

· Site 8 – 13th St. to 19th St. on South side $_________________ $_________________

· Site 9 – 13th St. to 20th St. on North side including ROW. $_________________ $_________________

Sheet E Site(s) #10 as construction will allow

· Site 10 – 20th St. to 25th St. and 13th Ave to 15th Ave, excluding the fenced in fountain $_________________ $_________________

Sheet F Site(s) #11-12

· Site 11 – 26th St. both ROW and East along South side of Interstate 4 $_________________ $_________________

· Site 12 – 34th St. both ROW to top of bank, West along North side of Interstate 4 $_________________ $_________________

Sheet G Site(s) #13

· Site 13 – 40th St. both Right-of-way (ROW) to top of bank $_________________ $_________________

Sheet H Site(s) #14-15

· Site 14 – Triangle at Columbus Dr. and Old Columbus Dr.

North and South ROW on Columbus Dr under I-4 spans including planted beds between the spans and south ponds $_________________ $_________________

· Site 15 – Columbus Dr. and 50th St. medians on the north and South sides, median and ROW east of 50th to 52nd St.

including 2 ponds north and south of Columbus Dr. & 50th St.

and I-4 overpass both ROW including ramp areas and 2 ponds at 49th St. $_________________ $_________________

TOTAL ANNUAL COST: $___________________

File details come from the government source that posted it. Updated .