Bid_25-02._Addendum_1.pdf
PDF 847 KB Posted
- Solicitation number
- Bid 25-02
- Issued by
- Polk County, Florida
About this file
This document is Addendum #1 for Bid 25-02 issued by the Putnam County Procurement Department for the Blvd. Lift Station Generator project, dated November 18, 2024. The addendum modifies the original bid specifications, converting the generator installation from portable to permanent, with a 30kVA generator requiring a minimum 24-hour run time and automatic transfer switch. Key changes include specifying that the new concrete pad will abut the existing concrete and extend to the fence, confirming no generator has been installed on-site, and requiring a fuel tank sized for 24-hour run time (minimum 150 gallons).
The project involves a permanent generator installation with specific technical requirements, including 15 HP, 480V, 3-phase pumps with a full load amperage of 19.6A, two pumps set for lead/lag run, and provisions for potential power interruptions during generator tie-in. The bid requires a minimum of one year maintenance and warranty, which may be subbed out to another entity. Electrical line drawings for the existing control panel are included with the addendum, and the installation will be hardwired to the control panel with camlock interlocks not required. The project is part of a Hazard Mitigation Grant Program (HMGP) funded initiative through the Florida Division of Emergency Management.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .